March 9, 1992 U.S. Nuclear Regulatory Conunission ATTN Document Control Desk r.,,
Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAll NUCLEAR PLANT (SQN) - UNIT 1 CYCLE 5, 90-DAY IN-SERVICE INSPECTION (ISI)
SUMMARY
REPORT
Reference:
TVA letter to NRC dated July 12, 1989, "Sequoyah Nuclear Plant (SQN) - Unit 2 Cycle 3, 90-Day In-Service Inspection (ISI) Report" Er. closed is SQN's Unit 1 Cycle 5 ISI Summary Report (Volumes 1 ar.d 2)-
that contains a hintorical record of repairs, replacements, modifications, and in-service nondestructive examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from October 4 to December 14, 1991.
This ISI Summary Report is being provided in accordance with IWA-6230 of ASME Code,Section XI.
In addition to the subject report, TVA is providing supplemental' information to SQN's Unit 2 Cycle 3, 90-Day ISI Report (previously provided by the referenced letter) as was discussed with NRC. The supplemental information contains the reports required by the ASME code and associated with a modification to_SQN's essential raw cooling water system-(replacement of a carbon steel section of piping and valves with stainless steel). This was identified as a reporting discrepancy during a final review of Workplan 11850.- This oversight is believed to be i
isolated; however, a more rigorous system has been established for ensuring the proper closeout of ASME,Section XI, work packages, which should prevent recurrence.
- M 9203130072 920309 PDR ADOCK 05000327
{
a PDR
.....:....r iii-1 i-.,
U.S. Nuclear Regulatory Commission Page 2 March 9, 1992 contains the volumes of SQN's Unit 1 Cycle 5 ISI Summary Report. contains the supplemental information to SQN's Unit 2 Cycle 3 ISI Report.
Please direct questions concerning this issue to Don V. Goodin at (615) 843-7734.
Sincerely,
'Qh 6 fvt.
4.j
. Wilson L
Enclosures cc Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
lc
ENCLOSURE 1 SEQUOYAll NUCLEAR PLANT UNIT 1 Cr!'E 5 (Volumes 1 and 2)
NIS-1 OWNERS DATA REPORT, Volume 1 NIS-2 OWNERS DATA REPORT, Volume 2 (508 920220 801)
I I
s e
ENCLOSURE 2 SUPPLEMENTAL INFORMATION FOR SEQUOYAH NUCLEAR PLANT NIS-1/NIS-2 SUPPLEMENTAL OWNERS DATA REPORT FOR UNIT 2 CYCLE 3 (808 911209 801)
,, -