ML20090G660

From kanterella
Jump to navigation Jump to search
Forwards DPC-NF-2010, Nuclear Physics Methodology for Reload Design. Reload Design for Core Will Be Completed in June 1985,w/Cycle 3 Startup Approx Dec 1986.Approval of Rept Requested by Jan 1985.Fee Encl
ML20090G660
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 07/18/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20090G665 List:
References
NUDOCS 8407250156
Download: ML20090G660 (1)


Text

. _ _ _ _ _ _ _ _. - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _

6 e

DUKE POWER CMHWNY 15.0. HOX 33180 CliAltLOTTE, N.C. 28242 IIAL 15. TUCKEl{

TELEPIIONE July 18, 1984 po4) ara-4sa o..,..,,

.m...

..o c w.

Mr. liarold R. Denten Of fice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief (40)

Licensing Branch No. 4 Re: McGuire Nuclear Station Catawba Nuclear Station Docket Nos. 50-369, ~370, -413, -414

Dear Mr. Denton:

Please find attached for your review forty (40) copies of Duke Power Company topical report DPC-NF-2010. This report describes the nuclear physics meth-odology for reload design at the McGuire and Catawba Nuclear Stations. This report is the first of a sequence of topical reports related to reload design at these stations. This report contains descriptions of fuel, physics codes, fuel cycle design methods, and derivation of core physics parameters.

Statisti-

~

cal benchmarks are also presented which quantify reactivity and power distri-bution uncertainties.

Duke Power Company's objective is to utilize this methodology in the design of McGuire 2 Cycic 3.

The reload design for this core will be completed in June of 1985 with Cycle 3 startup approximately December of 19P6. Approval of this report is desired by January of 1985.

Pursuant to 10 CFR 170.3(s), 170.12(f), and 170.21, Duke Power proposes that this topical report constitutes a "special project" requiring a $150 application fee with a maximum charge for the review / approval not to exceed $20,000.

Therefore, enclosed is a check for $150, with any further charges to be billed at a later date.

We would be pleased to meet with your staff to discuss this matter at your convenience.

Very truly yours, h

Q m +c d en 4I llal B. Tucker f

h' LilF/ibh 8407250156 840718 PDR ADOCK 05000369 Attachment P

PDR 03

[

p*