ML20090F224
| ML20090F224 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 07/16/1984 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | John Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20090F228 | List: |
| References | |
| NUDOCS 8407200211 | |
| Download: ML20090F224 (3) | |
Text
BALTIM ORE GAS AND ELECTRIC CHARLES CENTER.P.O. BOX 1475 BALTIMORE, MARYLAND 21203 AntHun E. LUNOVALL, Jm.
vw:c PacsiocNr July 16,1984 Director of Nuclear Reactor Regulation Attention: Mr. 3. R. Miller, Chief
^
Operating Reactors Branch //3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 4
Subject:
Calvert Cliffs Nuclear Power Plant Units Nos.1 & 2; Dockets Nos. 50-317 and 50-318 Updated Final Safety Analysis Report
Reference:
10 CFR 50, Paragraph 50.71," Maintenance of Records, Making of Reports" 7
Gentlemen:
The Baltimore Gas and Electric Company forwards herewith, for your information and use, one signed original and twelve additional copies of Revision 3 to the Updated Final Safety Analysis Report (FSAR) for the Calvert Cliffs Nuclear Power Plant Units 1 & 2.
These copies are provided in accordance with 10 CFR 50, Paragraph 50.71(e) which requires that a power reactor licensee periodically update the FSAR that was submitted with the operating license application. The enclosed revision is the product of an ongoing effort at Baltimore Gas & Electric Company to ensure that the FSAR accurately reflects current plant design information.
Attachn.ent I to this letter identifies facility changes made under the provisions of paragraph 50.59 but not previously submitted to the Commission. to this letter is the List of Effective Pages for the FSAR. Attachment 3 to this letter is a cross-reference of BG&E Drawings which are contained in the FSAR, sorted by the original Bechtel drawing number.
$7hk of0 7
K PDR I
I i
m w
- s x
s v
' ~ ~
Mr. J. R. Miller J July 16,1984 s
t y
,s Please replace'the appropriate pages of hour copy (s) of the updated FSAR with the enclosed pages.
Then please ecmplete and return the Verification of Receipt
' form included as Attachment 4 4o this letter.
s Y.
SALTIMbRE GAS AND EL CTRIC COMPANY
\\ $
s
~!
i BY: [/-
,WA<W2b
\\
/
s,
STATE OF MARYLAND :
a TO WIT:
CITY OF BALTIMORE I
i, Mr. A. E. Lundvall, Jr., being duly sworn, states that he is Vice President of the Baltimore Gas and Electric Company, a Corporation of the State of Maryland; that he executed the foregoing Revision 3 to the Updated Fhat Safety Analysis Report for the purpose therein set forth; that the Information contained in said document presents to the best of his knowledge, information, and. belief, all changes made to the facility up to six months prior to this date; and that he was authorized to execute the said Revision on behalf of said Corporation.
i
' W tn ess my Hand and Notarial Seal:
I h M s e/t) e
-n 6A Notary Public t
My Commision Expires:
Ot</u /, /?N
(/
l' u.
AEL/RFF/vf Attachments lixtosures cc (all w/o enclosures)
' D. A. Brune, Esq.
iG. F. Trowbridge, Esq.
Mr. D. H. :affe '
T. Foley
g.
k p
,i g.
S
't?
3'
,\\
e.
n,
\\
e
'A
_.m l.ist of Facility Change Requests (FCRs) Reflected in Revision 3 of the Updated FSAR and Not Yet Reported in an Annual Report per Paragraph 50.59(b)76-201 79-65 79-1062 80-1000 80-1008 80-1060 81-76 81-1044 81-1065 82-4 82-8 82-145 82-148 32-210 83-1085 83-3000 84-23 84-24 84-1018 84-3001 L
-----