Ccmmonwenith Edison 1y 1400 Opus Place v
Downers Grove, Ullnois 60515 March 4, 1992 Dr. Thomas E. Herley Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington D.C. 20555 Attention:
Document Control Desk
Subject:
Braidwood Station Units 1 & 2 Integrated Leak Rate Tecting Schedule NRC Docket Nos. 50-456/457
References:
(a) May 31, 1991 A. R. Checca letter to Dr. T. E. Murley (b) February 14, 1992 T. W. Simpkin letter to Dr. 1. E. Murley
Dear Dr. Murley:
1 Reference (a) transmitted the Braidwood Unit 1 Integrated Leak Rate (ILRT) Report for the te:t conducted between February 2 and March 5, 1991.
This test was initially reported as an as-found success and later determined to be an as-found failure.
Reference (b) provided the Braidwood Unit 2 ILRT Report for the test conducted between September 12 and November 16, 1991.
This-test was reported as an as-found failure. Pursuant to 10CFR 50,
- Appendix J,Section III.A.6, Commonwealth Edison is submitting for NRC
-approval the testing schedule for the next ILRT on each unit.
The Unit 1 test will be conducted during the fourth refueling outage, presently scheduled to commence in March, 1994.
The next Unit 2 test will be accomplished during the fourth refueling outage, presently scheduled to l
begin in September, 1994.
Please advise this office of.the acceptability of these schedules, i
Additionally, please direct any questions you may have regarding this matter to this office.
l Very truly yours,
/
14 6
(
T. W. Simpkin Nuclear Licensing Administrator THS/bim-cc:
R. M. P91sifer
. Project Manager, NRR S. Dupont - Senior Resident Inspector, Braidwood B. Clayton - Branch Chief, Region III PDR ZNLD/1571/6