Submits Integrated Leak Rate Testing Schedule for NRC Approval.Unit 1 ILRT Will Be Conducted During Fourth Refueling Outage,Presently Scheduled to Commence in Mar 1994 & Unit 2 During Fourth Refueling Outage in Sept 1994
ML20090E908
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/04/1992
From: Simpkin T
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9203100136
Download: ML20090E908 (1)


Text

.. -

Ccmmonwenith Edison 1y 1400 Opus Place v

Downers Grove, Ullnois 60515 March 4, 1992 Dr. Thomas E. Herley Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington D.C. 20555 Attention:

Document Control Desk

Subject:

Braidwood Station Units 1 & 2 Integrated Leak Rate Tecting Schedule NRC Docket Nos. 50-456/457

References:

(a) May 31, 1991 A. R. Checca letter to Dr. T. E. Murley (b) February 14, 1992 T. W. Simpkin letter to Dr. 1. E. Murley

Dear Dr. Murley:

1 Reference (a) transmitted the Braidwood Unit 1 Integrated Leak Rate (ILRT) Report for the te:t conducted between February 2 and March 5, 1991.

This test was initially reported as an as-found success and later determined to be an as-found failure.

Reference (b) provided the Braidwood Unit 2 ILRT Report for the test conducted between September 12 and November 16, 1991.

This-test was reported as an as-found failure. Pursuant to 10CFR 50,

- Appendix J,Section III.A.6, Commonwealth Edison is submitting for NRC

-approval the testing schedule for the next ILRT on each unit.

The Unit 1 test will be conducted during the fourth refueling outage, presently scheduled to commence in March, 1994.

The next Unit 2 test will be accomplished during the fourth refueling outage, presently scheduled to l

begin in September, 1994.

Please advise this office of.the acceptability of these schedules, i

Additionally, please direct any questions you may have regarding this matter to this office.

l Very truly yours,

/

14 6

(

T. W. Simpkin Nuclear Licensing Administrator THS/bim-cc:

R. M. P91sifer

. Project Manager, NRR S. Dupont - Senior Resident Inspector, Braidwood B. Clayton - Branch Chief, Region III PDR ZNLD/1571/6