ML20090E740

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 84-02 Re Hfa Relays in Use in Class IE Safety Sys.Unit 1 Coil Spools Will Be Replaced by 840901.Unit 2 Relays Will Be Replaced Prior to Turnover of Affected Safety Sys
ML20090E740
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/10/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-84-02, IEB-84-2, NUDOCS 8407200036
Download: ML20090E740 (1)


Text

'

b/110

i t P.o. BOX 5000 MURRAY R. EDELMAN

- CLEVELANo, ohio 44101 - TELEPHONE (216) 622 9800 ILLUMINATINo BLOG - 55 PUBLIC SoVARE Semng The Best Locat:cn in the Nation VICE PRESIDENT NUCLEAR July 10, 1984 PY-CEI/01E-008 L Mr. James G. Keppler l Director, Region III i Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Glen Ellyn, 60137 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441

1. E. Bulletin 84-02

Dear Mr. Keppler:

In accordance with your request, the following information is provided in response to I. E. Bulletin 84-02 on IIFA Relays in use in Class IE safety systems.

We have evaluated the llFA relays used in class IE systems at PNPP and have completed replacement of all but two of the Unit 1 IIFA relay coil spools with the Tefzel coil spools. Replacement of all of the Unit I coil spools will be completed by September 1, 1984. Replacement of the Unit 2 relays will be completed consistent with the Unit 2 construction schedule prior to turnover of affected safety systems.

Picase call if there are additional questions.

Very truly yours,

<}W, hw 8407200036 840710  !!urray R. Edelman DR ADOCK 05000 Vice President Nuclear Group MRE:njc cc: Jay Silberg, Esq.