Expresses Opinion Re Oral & Written Exam Given During Audit of Training Dept.Exam Was Pure Harassment & Unconstitutional
ML20090E437
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/26/1984
From: Maciuska F
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20090E369 List:
References
NUDOCS 8407190470
Download: ML20090E437 (2)


Text

__.-

O$.dses h ilnlu

)*

~

ATTACHMENT 2 Page 1 of 2 1

1523 Elderberry Circle Walworth, New York 14568 26 January 1994 Regional Administrator Rerion 1 U. S. Nuclear Rezulatory Commission' Kina of Prussia, Pennsylvania

Dear Sir:

I am writine this letter, under advice of 1eral consel, in reaards to the recent During this (USWRC) audit of the R. E. Ginna trainina deuartment.

Rerion 1 audit I was a particinant in both an oral and written examination.

I understand that this audit was condu ted under the guise of NuRet 1021. Section

?.S 401 (9/1/93). Yv contention is that this NuRea does not hava the force and effect of Law, therefore I feel that havina to take the exam was pure harrassment.

+

Furthermore, I feel that I was intimidated by the NRC into takine the exam and did so only under duress.

Although I was informed by the examiner that the proceedines were in no way a reflection upon my license, I realize that if I should fail the exam, the NBC A failure to do so would is bound by their mandate to take some type of acti'on.

mean that the NRC is failing to carry out those duties relasated to them by Con-As such, my livelihood is placed in jeopardy by the unlawful actions 'of are ss.

your examiners.

I further contend that this examination of me as a license holder is unconsti-tutional under the Fourth Ammendment, " Unlawful Search and Seizure".

At this time I am also requesting that I receive a copy of the written exam-ination which I took on 27 January 1994, alone with any other documents bearing I believe that I have this mv name which were used durine the auditine process.

right under the Freedom of Information Act and/or the Privacy Act.

I also reserve, desnite the outcome of av ' written results, the riaht to pursue this matter in any legal avenue that mirht be' available to-me 'in the future.

DESIGITAfEp og7c7mg7; C rtified 37 4,,g 8407190470 840629 y

PDR ADOCK 05000244 G

PDR

o o

ATTACHMENT 2 Page 2 of 2 1

Finally, the thoubts, feelines and opinions expressed in this letter are mv cwn, and do not in any way represent the thourhts, feelinas and opinions of the Rochester Gas and Electric Company.

Respectfully, p

k(fLb' b

Frank L. Maciuska License No. OP 4261 Docket No. 55-9059 Effective Date,16 February 1993 FIX: mum Eonorable Frank Horton, 29th Conaressional District cc:

Nr. L. ?ihitaker, Region 1 Examiner Mr. J. Maier, Vice President, RG&3 Kr. 3. Snow, Ginna Flant Supertintendent Mr. G. Larizza, Ginna Operations Manaar Mr. R. Eurley, Ginna Shift Supervisor Mr. R. Zimmerman, USNRC Resident Inspector

,i i

l 1

n q

v U.S. NUCLEAR REGULATORY C.0LaION No. 84-13 REGION:I NOTICE OF SIGNIFICANT t.!CENSEE' MEETING ATTACHMENT 3

{

Page 1 of 1 j

Name of Licensee:

Rochester Gas and Electric Company Name of Facility:

R. E. Ginna Nuclear Power Plant i

Docket No.:

50-244 Time and Date:

2:00 p.m.

February 3,1984 Location,: ?,

Region I Office, King of, Prussia, Pennsylvania

Purpose:

Discuss NRC Review of Operator Requalification Program NRC Attendees:

R. W. Starostecki, Director Division of Project and Resident Programs (DPRP' H. B. K ster, Chief. Projects Branch No. 2 DPRP S, J. Collins, Chief. Reactor Projects Section 2C, DPRP R. P. Zimeman, Senior Resident Inspector, Ginna E. G. Greenman, Chief, Projects Branch No. 2. DPRP R. Keller, Chief Operator Licensing Section 1C, CPRP G. Dick, NRR, ORB 5 l

Licensee Attendees:

J. E. Maier, Senior Vice President - Operations and Engineering I

R. W. Kober, Vice President, Electric and Steam Production B. Snow, Plant Superintendent P. Gorski, Operations Department Note: Attendance by other NRC personnel at this meeting should be made known by 4:00 p.m.,

February 2,1984 to S. J. Collins, Region I, at FTS 8-488-1126.

Prepared byA7m/nf/6Vh/7M i

' 5. J. Collins, Chief Reactor Projects Section 2C

{

Distribution:

W. Dircks, Executive Director for Operations R. DeYoyng, Director Office of Inspection and Enforcement D. Eisethut, Director, Division of Licensing, MRR D. Crutchfield, Chief, Operating Reactors Branch No. 5 DOL, NRR C. Heltemes, Director, Office of Analysis and Evaluation of Operational Data J. Axelrad. Acting Director, Enforcement Staff, IE Public Document Room (PDR)