Text
....
'4 fpfa w
hm
'k Duquesne @t m.
- em-nocw on.or n o to. 4 Eng pa,gry t P A I f.0 7 7 4H4 March 9, 1992 Deaver Valley Power Station Unit 1 - Docket flo. 50-334, Licerso No. DPR-66 Unit 2 - Docket No. 50-412, Licorno No. NPF-73 Monthly Operatim Report U. S. Nuclear Regulatory Carnission Ibcument control DecJ:
WashirrJton, D.C.
20555 Gentlemen:
In acconlance with Appendix A,
Technical Specifications, the Monthly Operating Report is sutnitted for Unit 1 ard Unit 2 for the month of February, 1992.
Very truly yours, j
o.. < ~
D. Sieber
~
Vice President Nuclear Group UIU/N9 Enclosures cc: NRC Regional Offico King of Prussia, PA
. [v '
9203090300 920229 f
\\
PDR ADOCK 05000334
(;
R__
~ -..- -.
1RRRATIVE SUM %RY OF 4
InfDILY OPERATD1G EXPERIDiCE i
UNIT 1 IDHJARY 1992 Febnlary 1 The Unit operated at a natitul value of 100% cutput.
thrm gh February 23 Febnlary 24 At 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> the rod position indication for control rods "H2" and "F6" kras found irdicatirg greater than the Technical Specification 3.1.3.1 limit of 12 steps. At 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> the indicated-control rod alignment was restored to within specification.
'Ibe Unit -continued to operate at a namiml value of 100% output.
February 25 The Unit operated at a nominal value of 100% output.
through FebnnIy 29
,. ~ - - -. - - -.. - - -
AVERAGE IRILY Ulf1T FoiER 11NEL
[DCKUrID.
50-334 U!IIT INP9 Unit 1 IRTE March 3 1992 00MPIETED BY Dwid T. Jones _
TEILT10!iE (412) 393-7612.
FQTDi Fehntary 1992 IWY AVERAGE IRILY IOYER ILVEL IWY AVERAGE IAILY IOiER IETL (Mic-Net)
(fUo-Net) 1 829 17 825 2
829 18 825 3
829 19 821 4
829 20 825 5
-829 21 821 6
838 22 829 7
829 23 817 8
829 24 817 9
338 25 821 10 825-26 825 11 838 27 829 12 833 28 825 13-817 29 829 14 --
825 30_
15-825 31 16 829 INSTRUCTIONS:
On this format, list the average daily unit power level IMe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
03/03/92 COMPLETED BY: DAVID T. JONES TELEPil0NE:
(412) 393 7612 OEERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1992
- 3. LICENSED TilEIUiAL POWER (MWt):
2652 4, NAMEPLATE RATING (Cross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX, DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX, DEPENDABLE CAPACIIT (Net MWe):
810 8.
IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9, POWER LEVEL TO WilICH RESTRICTED. IF ANY (Not MWe)
None
- 10. REASONS FOR REETRICTIONS, IF ANY:
N/A THIS MONTll YEAR TO DATE CUMUIATIVE 11, il0URS IN REPORTING PERIOD:
696.0 1440.0 138792.0
- 12. NO. OF llRS, REACTOR WAS CRITICAL 696,0 1440.0 86763.6
- 13. REACTOR RESERVE SHUTDOWN 110URS:
0,0 0.0 4482.8 14, HOURS GENERATOR-WAS ON LINE:
696,0 1440,0 84871.2 15 UNIT RESERVE SIIUTDOWN 110URS:
0,0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MW11) :
1839523,0 3808429,0 202320605.5
- 17. GROSS El.ECT. ENERGY GEN, (Mull) :
607840,0 1260880.0 65059283.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) :
575510.0 1192900,0 60760450.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100,0 100.0 63.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100,0 100,0 63.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 99.0 99.2 55.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.5
- 24. SilUTDOWS SCilEDULED OVER NEXT SIX MONTilS (TYPE,DATE, AND DURATION OF EACll):
- 25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:
26; UNITS IN TEST STATUS (PRIOR TO C0KMERCIAL OPERATi'J):
FORECAST ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A-i i
I
]
'I
' UNIT $NUTDOWWS AN3 POWER REDUCTious (1 0%)-
Docket so.
50-334 2
Unit meme-BVPS Unit #1
.Date perte 3, 1792 Completed By Davto 1 Jws REPORY MOETH FEgeuAeV 1992 Telephone. (412) 393-7612
~
t Method of
' Licensee Cause & Corrective Duration Shutting Event Srstem Component Action to i
l
'No.
Date.
Typel
' (Hours)
Reason 2-Down Reactor 3 Report 8
' C ode' Code 5 Prevent pecurrence P
I NONE 6
., s P
f i
4 4
?
)
r i
i 4
i i,
1 2
3 4
l F-Forced Reason:
Method:
Exhibit F - Ins t r uc t i ons f or S-Scheduled A-Equipment failure (Explain).
1 Manual Preparation of Data Entry Sheets
.I 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (lea) File C-Refueling 3-Automatic scram (suaEG0161).
g j
.D-Regulatory Restriction 4-Cont'd. f roe Previous Menth i.
E-Operator' Training & License Exam.
5-seduction 5
f F-Administrative 9-Other Eshibit n-Seme source.
L G-Operational Error (Explain)
=
H-Other (Emplain)
'I i
?
r l
i
_ _ _ _.. - -. _, -.. - _. - _ _ _. - _..... _, ~. _. _.. _ _ _ _
11ARRATIVE StM1ARY OF i
FD!IIHLY OPERATIl1G EXFDUDCE l
- UllIT 2 FEBRUARY 1992 February 1
'Ihe Unit; continucd to operato at approximtely 80% output to pemit min cordenser waterbox cleanirg.
February 2 At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the Unit bcgan escalation to a namimi value of 100% output.
February 3 At 0102' hours the Unit achieved approximtaly 100% output.
February 4
'Iha Unit operated at a nandml value of 100% ' output, thlugh February 27 February 28 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit ocumenced a power reduction to approximately 80% output.for end of life fuel coastdown prior to the Unit's third refueli29 outage.
February.29 At 1005-hours the Unit achieved approximtely 80% output. 'Ihe Unit continued to operate at approxim tely 80% output for end of life fuel coastdown prior to the Unit's third refuelirg outage.
~ -... _ -
~
~ - _ -
- AVERAGE [RILY UNIT IGG LLVEL DOCIG.T NO..
50-412 UNIT BVPS Unit 2 DATE _Murh 3.
1992 OQMPIff'ED BY Dwid T. Jones
'ITIFJ11CtIE (412) 393-7612 113!I111 Febntary 1992 DAY AVERAGE DAILY 106 ILVEL
!%Y AVERAGE IRILY IWER ILVEL (PNe-Net)
(tNe-Net)
-1 655 17 805 2
683 18 802 3
815 19 800 4
811 20 803 5
810
.21 801 6
808 22 796 7
808 23 796 8
809 24 799 9
812 25 799 10 809 26 798 11-805 27 801 12 '
808 28 794 13 804 29 671 14-806 30
~---
15 800 31 16 805 i>
^
INSTRUCI' IONS:
g on this fomat, list the average daily unit power level }&e-Net for each day in the reporting month. Compute to the nearest whole megawatt, s
w
-v v
n r
- ~ < - -
r
~n,, - --
r m-w--e
---s-p~.--
OPERATING DATA REPORT DOCEET NO.
50 412 REPORT DATE:
03/03/92 COMPLETED BY: DAVID T. JONES TELEPil0NE '
(412) 193 7612 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1992
- 3. LICENSED THERMAL POWER (MVt):
2652 4 NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe):
870
- 7. MAX, DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CllANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WilICil RESTRICTED. If ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTil YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
696,0 1440.0 37575.0
- 12. NO. OF llRS. REACTOR WAS CRITICAL.
696.0 1440.0 32520.2
- 13. REACTOR RESERVE SilUTDOWN 110URS 0.0 0.0 0.0
- 14. Il0URS GENERATOR WAS ON LINE:
696.0 1440.0 32322.0
- 15. UNIT RESERVE SilUTDOWN ll0URS:
0.0 0.0 0.0
- 16. CROSS T11ERMAL ENERGY GEN. ( MW){ }
1796307.0 3667007.0 79026754.4
- 17. CROSS ELECT, ENERCY GEN. (MW11),
579102.0 1184639.0 25359220.0
- 18. NET ELECTRICAL rNERGY GEN. (MWil) :
549381.0 1123504.0 23928989.0 19, UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.4 93.3 76.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 3.8
- 24. Sil0TDOWNS SCHEDULED OVER NEXT SIX MONTll5 (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO StLQIDOWN F9R ITS THIRD REFUELING OUTAGE ON MARCH 13. 1992.
TH' REFUELING OUTAGE IS SCHEDULED TO IAST FOR 70 DAYS.
- 25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N /A N/A
{
UNIT SHUTDOVMS AND POWER REDUCitoMS (120%)
Docket me.
'50-412
^
=
Unit Name BVPS Unti a2
~
m rch 3. 1992 Date a
t Completed By David T.
Jones
' REPORT MONTN FEBRUA#Y 1992 Telephone t412) 393-7612 I
Method of
. Licensee Cause & Corrective' Duration shutting.
Event.
System Component Action to l
No.
Date Typel (Hours)
, Ressor.2 Down Reactor 3 Report #.
Code 4 Code 5 Prevent Recurrence.
1 4
920201 S
0
'E 4
N/A MC
'MTENCW Ur.its output reduced fr.om 1001 to-801 to permit cleaning the-r waterboxes of the Unit's Main C ondenser.
.t
-l 5
920228 0
4 5
N/A 22 222222 Units output reduced f rom 100% to a
80% f or end of lif e f uel coastdown F
i prior to the Unit's third refueling outage.
I k
i l
- 1-
-2 3
4' F-forced Reason:
Method:
Exhibit F -I nst r uct i ons f or '
S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preparation of Data Entry Sweets 9-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File t
C-Refueting 3-Automatic Scram (huREG0161).
p 3
i D-Regulatory Restriction 4-Cont'd. f r om Previous Month E-Operator Training & ticense Exam 5-Reduction 5
9-Other Exhibit H-Same Source.
t F-Administrative __
G-Operational Error (Emptain)
M-Other (Explain)
I t
i
..