'4w fpfa

. hm

'k Duquesne @t m. - em-nocw on.or n o to. 4 Eng pa,gry t P A I f.0 7 7 4H4 March 9, 1992 Deaver Valley Power Station Unit 1 - Docket flo. 50-334, Licerso No. DPR-66 Unit 2 - Docket No. 50-412, Licorno No. NPF-73 Monthly Operatim Report U. S. Nuclear Regulatory Carnission Ibcument control DecJ:

WashirrJton, D.C. 20555 Gentlemen:

In acconlance with Appendix A, Technical Specifications, the Monthly Operating Report is sutnitted for Unit 1 ard Unit 2 for the month of February, 1992.

Very truly yours, j o.. < ~

D. Sieber

~

Vice President Nuclear Group UIU/N9 Enclosures cc: NRC Regional Offico King of Prussia, PA 9203090300 920229

(; PDR ADOCK 05000334 PDR

. [v '

f \

R__ ,

~ -. .- - . ...- -. - ---.-.. - .- - - . -- . - - . - . . . .-- . . . - .

1RRRATIVE SUM %RY OF 4

InfDILY OPERATD1G EXPERIDiCE i UNIT 1 IDHJARY 1992 Febnlary 1 The Unit operated at a natitul value of 100% cutput.

thrm gh February 23 Febnlary 24 At 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> the rod position indication for control rods "H2" and "F6" kras found irdicatirg greater than the Technical Specification 3.1.3.1 limit of 12 steps. At 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> the indicated- control rod alignment was restored to within specification. 'Ibe Unit -continued to operate at a namiml value of 100% output. '

February 25 The Unit operated at a nominal value of 100% output.

through FebnnIy 29

, . - .. - .-- . , - . - - . - . , . ~ - - - . - - - . . - - - . - - - .. .

AVERAGE IRILY Ulf1T FoiER 11NEL

[DCKUrID. 50-334 U!IIT INP9 Unit 1 IRTE March 3 1992 00MPIETED BY Dwid T. Jones _

TEILT10!iE (412) 393-7612.

FQTDi Fehntary 1992 IWY AVERAGE IRILY IOYER ILVEL IWY AVERAGE IAILY IOiER IETL (Mic-Net) (fUo-Net) 1 829 17 825 2 829 18 825 3 829 19 821 4 __

829 20 825 5 -829 21 821 6 838 22 829 7 829 23 817 8 829 24 817 9 338 25 821

, , 10 825- 26 .

825 11 838 27 829 12 _

833 28 825 13- 817 29 829 14 -- 825 30_ _

15- 825 31 16 829 INSTRUCTIONS:

On this format, list the average daily unit power level IMe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

4 OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 03/03/92 COMPLETED BY: DAVID T. JONES TELEPil0NE: (412) 393 7612 OEERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1992
3. LICENSED TilEIUiAL POWER (MWt): 2652 4, NAMEPLATE RATING (Cross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX, DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX, DEPENDABLE CAPACIIT (Net MWe): 810
8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

9, POWER LEVEL TO WilICH RESTRICTED. IF ANY (Not MWe) None

10. REASONS FOR REETRICTIONS, IF ANY: N/A THIS MONTll YEAR TO DATE CUMUIATIVE 11, il0URS IN REPORTING PERIOD: 696.0 1440.0 138792.0
12. NO. OF llRS, REACTOR WAS CRITICAL 696,0 1440.0 86763.6
13. REACTOR RESERVE SHUTDOWN 110URS: 0,0 0.0 4482.8 14, HOURS GENERATOR- WAS ON LINE: 696,0 1440,0 84871.2 15 UNIT RESERVE SIIUTDOWN 110URS: 0,0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MW11) : 1839523,0 3808429,0 202320605.5
17. GROSS El.ECT. ENERGY GEN, (Mull) : 607840,0 1260880.0 65059283.0
18. NET ELECTRICAL ENERGY GEN. (MWil) : 575510.0 1192900,0 60760450.0
19. UNIT SERVICE FACTOR: (PERCENT) 100,0 100.0 63.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100,0 100,0 63.2
21. UNIT CAPACITY FACTOR (MDC): PCT 102,1 102.3 56.8
22. UNIT CAPACITY FACTOR (DER): PCT 99.0 99.2 55.1
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.5
24. SilUTDOWS SCilEDULED OVER NEXT SIX MONTilS (TYPE,DATE, AND DURATION OF EACll):
25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:

26; UNITS IN TEST STATUS (PRIOR TO C0KMERCIAL OPERATi'J):

FORECAST ACllIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A-i i

I

]

'I

' UNIT $NUTDOWWS AN3 POWER REDUCTious (12 0%)- Docket so. 50-334 -

Unit meme- BVPS Unit #1 ,

.Date perte 3, 1792 Completed By Davto 1 Jws REPORY MOETH FEgeuAeV 1992

~

Telephone. (412) 393-7612 t

Method of ' Licensee Cause & Corrective ,

Duration i Shutting Event Srstem Component Action to l 'No. Date. Typel ' (Hours) Reason 2- Down Reactor 3 Report 8 ' C ode' Code 5 Prevent pecurrence P

I NONE 6

., s P

f

' i 4

4

?

)

r i

i 4 -

i i

1 2 3 4 l F-Forced Reason: Method: Exhibit F - Ins t r uc t i ons f or  !

S-Scheduled A-Equipment failure (Explain). 1 Manual Preparation of Data Entry Sheets .I 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (lea) File C-Refueling .

3-Automatic scram (suaEG0161).

j .D-Regulatory Restriction 4-Cont'd. f roe Previous Menth i E-Operator' Training & License Exam . 5-seduction 5 f F-Administrative 9-Other Eshibit n-Seme source. L

= G-Operational Error (Explain)

H-Other (Emplain)

'I i

?

r l i

_ _ _ _ . . - - . _ , - . . - _ . - _ _ _ . - _ . . . . . _ , ~ . _ . _ . . _ _ _ _

11ARRATIVE StM1ARY OF  ;

i FD!IIHLY OPERATIl1G EXFDUDCE l

- UllIT 2 FEBRUARY 1992 February 1 'Ihe Unit; continucd to operato at approximtely 80% output to pemit min cordenser waterbox cleanirg.

February 2 At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the Unit bcgan escalation to a namimi value of .

100% output.

February 3 At 0102' hours the Unit achieved approximtaly 100% output.

February 4 'Iha Unit operated at a nandml value of 100% ' output, thlugh February 27 February 28 At 2200 hours the Unit ocumenced a power reduction to approximately 80% output .for end of life fuel coastdown prior to the Unit's third refueli29 outage.

February.29 At 1005- hours the Unit achieved approximtely 80% output. 'Ihe Unit continued to operate at approxim tely 80% output for end of life fuel coastdown prior to the Unit's third refuelirg outage.

.. - -. . . . ~ - . . . _ - . - - _ . _ . - ~ ~ - _ - . .-.. -_. -

. - AVERAGE [RILY UNIT IGG LLVEL DOCIG.T NO. . 50-412 _

UNIT BVPS Unit 2 DATE _Murh 3. 1992 OQMPIff'ED BY Dwid T. Jones

'ITIFJ11CtIE (412) 393-7612 113!I111 Febntary 1992 DAY AVERAGE DAILY 106 ILVEL  !%Y AVERAGE IRILY IWER ILVEL (PNe-Net) (tNe-Net)

-1 655 17 805 2 683 18 802 3 815 19 800 4 811 20 803 5 810 .21 801 6 808 22 796

7 808 23 796 8 809 24 799 9 812 25 799 10 809 26 798 11- 805 27 801 12 ' 808 28 794 13 804 29 671 14- 806 30 ~---

15 800 31 -

16 805 i>

^

INSTRUCI' IONS:

g on this fomat, list the average daily unit power level }&e-Net for each day in the reporting month. Compute to the nearest whole megawatt, s

, w -v , v n -

r -

- ~ < - - p~.--

OPERATING DATA REPORT DOCEET NO. 50 412 REPORT DATE: 03/03/92 COMPLETED BY: DAVID T. JONES TELEPil0NE ' (412) 193 7612 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1992
3. LICENSED THERMAL POWER (MVt): 2652 4 NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Cross MWe): 870
7. MAX, DEPENDABLE CAPACITY (Net MWe): 820
8. IF CllANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
9. POWER LEVEL TO WilICil RESTRICTED. If ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTil YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 696,0 1440.0 37575.0
12. NO. OF llRS. REACTOR WAS CRITICAL. 696.0 1440.0 32520.2
13. REACTOR RESERVE SilUTDOWN 110URS 0.0 0.0 0.0
14. Il0URS GENERATOR WAS ON LINE: 696.0 1440.0 32322.0
15. UNIT RESERVE SilUTDOWN ll0URS: 0.0 0.0 0.0
16. CROSS T11ERMAL ENERGY GEN. ( MW){ } 1796307.0 3667007.0 79026754.4
17. CROSS ELECT, ENERCY GEN. (MW11) , 579102.0 1184639.0 25359220.0
18. NET ELECTRICAL rNERGY GEN. (MWil) : 549381.0 1123504.0 23928989.0 19, UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
21. UNIT CAPACITY FACTOR (MDC): PCT 96.3 95.1 76,9
22. UNIT CAPACITY FACTOR (DER): PCT 94.4 93.3 76.2
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 3.8
24. Sil0TDOWNS SCHEDULED OVER NEXT SIX MONTll5 (TYPE,DATE,AND DURATION OF EACH):

THE UNIT IS SCHEDULED TO StLQIDOWN F9R ITS THIRD REFUELING OUTAGE ON MARCH 13. 1992. TH' REFUELING OUTAGE IS SCHEDULED TO IAST FOR 70 DAYS.

25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N /A N/A

{

^

UNIT SHUTDOVMS AND POWER REDUCitoMS (120%) Docket me. '50-412 =

Unit Name BVPS Unti a2 ~

Date m a rch 3. 1992 t Completed By David T. Jones  !

' REPORT MONTN FEBRUA#Y 1992 Telephone t412) 393-7612 I

Method of . Licensee Cause & Corrective' Duration shutting . Event. System Component Action to l No. Date Typel (Hours) , Ressor.2 Down Reactor 3 Report #. Code 4 Code 5 Prevent Recurrence .

4 920201 S 0 'E 4 N/A MC 'MTENCW Ur.its output reduced fr.om 1001 to-801 to permit cleaning the- r waterboxes of the Unit's Main  !

C ondenser . .

.t

-l a 5 920228 ,$ 0 4 5 N/A 22 222222 Units output reduced f rom 100% to  !

80% f or end of lif e f uel coastdown F i prior to the Unit's third refueling  ;

outage.

I i

l

1- -2 3 4' F-forced Reason: Method: Exhibit F -I nst r uct i ons f or '

S-Scheduled A-Equipment Failure (Emplain) 1-Manual Preparation of Data Entry Sweets  ;

9-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File t 3

C-Refueting 3- Automatic Scram (huREG0161). p i D-Regulatory Restriction 4-Cont'd. f r om Previous Month