ML20090E157
| ML20090E157 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/01/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20090E162 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 GN-348, NUDOCS 8407190323 | |
| Download: ML20090E157 (1) | |
Text
.
Georg a Power Cornpany Route 2 Box 2'MA Waynest>cro Georg a 30910 Tefephone 404 SE 197;1. Est 3360 404 724 8? ?4 E =? 3 %J m
Georgia Power D. O. Foster Vo Pres e -t and Project r
D'
' ' ' ' t *
- I' ;' '1Mt" la ?'HT 3l t,1a% ige' VOGI'O P(0,eCf May 1, 1984 Director of Nuclear Reactor Regulation File:
X7BC06 Attention:
Ms. Elinor G. Adensam, Chief Log:
GN-348 Licensing Branch #4 Division of Licensing REF:
Dutton to Adensam, U. S. Nuclear Regulatory Commission 4/14/84, Generic Letter 82-33 Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 JMERGENCYOPERATINGPROCEDUREGENERATIONPACKAGE
Dear Ms. Adensam:
The referenced letter stated a commitment to provide you with the subject package approximately twenty-eight (28) months prior to fuel load.
En-closed please find ten (10) copies of the subject package.
Should you have any questions on the enclosed submittal, do not hesitate to contact us.
-)
~
truly,(;/
j Your
{
L y.
D. O. Foster DOF/KWK/js cc:
M. A. Miller L. T. Gucwa R. A. Thomas G. Rockhold, Jr.
J. A. Bailey G. F. Trowbridge, Esquire
- 0. Batum D. G. Eisenhut 8407190323 840501 PDR ADOCK 05000424 F
'a d\\
od ons n
Gh Nste
%$(S 41*h L
gg m,e-e oc & c l
6-