ML20090D477

From kanterella
Jump to navigation Jump to search
Amends 157 & 131 to Licenses DPR-51 & NPF-6,respectively, Deleting Requirement for Visual Cell Plate Insp for Diesel Fire Pump Battery
ML20090D477
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/26/1992
From: Larkins J
Office of Nuclear Reactor Regulation
To:
Entergy Operations
Shared Package
ML20090D480 List:
References
DPR-51-A-157, NPF-06-A-131 NUDOCS 9203060216
Download: ML20090D477 (9)


Text

.

((p usy),

UNITED STATES g* ' ',n NUCLE AR REGULATORY COMMISSION E

WASHING TON, D. C. 20556 t

o 44.....,o ENTERGY OPERAHONS. INC.

DOCKET NO. 50-313 ARKANSAS NELIAR ONE. UNIT NO.1 AMENDMENT TO FACillTY OPERATING LICENSE Amendment No.157 License No. DPR-51 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the licensee) dated October 15, 1991, complies with the standards and requireme ts of the Atomic Energy Act af 1954, as amended (the Act),

and the Co... mission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D,

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l 9203060216 920226 PDR ADOCK 05000313 P

PDR

t V

. 2.

Accordingly, the license is ams ied by changes to the Technical Specifications as indicated '.n ti,a attachment to this license amendment, and Paragraph 2.C.(2) of facility Operating License No. DPR-51 is hereby amended to read as follows:

(2) Technical Specificationg i

The Technical Specifications contained in Appendix A, as revised through Amendment No.157, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION WLL John T. Larkins, Director Project Directorate IV-1 Division of Reactor Projects 111, IV, and V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 26, 1992

ATTACHMENT T0_ llCENSE AMEN 0 MENT NO.157 FACillTY OPERATING LICENSE NO. DPR-H DOCKET NO. 50-313 Revise the following page of the Appendix "A" Technical Specifications with the attached page.

The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

REMOVE PAGE lt{ SERT PAGE 110r 110r

. -.. ~. -

-4.20.2 The fire pomp diesel engine shall be demonstrated OPERABLE:

a.

At least once per 31 days by verifying the fuel storage day tank to be at'least 5/8 full of fuel (approximately 155 gallons),

b.

At least once per 92 days by verifying that a sample of diesel fuci from the fuel storage tank, obtained in accordance with ASTH-D270-65, is within the acceptable limits specified in Table 1 of ASTM-D975-74 with respect to viscosity, water content and sediment.

c.

At least ence per 18 months, during shutdown, by subjecting the diesel to an inspection in accordanc* with procedures prepared -in conjunction with its manuf acturer's recommendations for the class of service.

4.20.3 The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated OPERABLE:

a.

At least once per 7 days by verifying that:

))

The electrolyte level of each battery is above the plates, and 2)

The overall battery voltage is 224 volts, b.

At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery, c.

At least once per 18 months by verifying that:

1)

The batteries and-battery racks show no visual l

Indication of physical damage or abnormal deteriorations, and 2)

The battery-to-battery and terminal connections _are clean, tight, free of corrosion and coated with anti-corrosion material.

l Amendment No. //,157 110r l

f f "IC UNITED STATES 44#

4 NUCLEAR REGULATORY COMMISSION n

{

,I WASHINGTON. D C.20555

\\...+/

+

ENTERGY OPERATIONS. INC.

DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE. UNIT NO. 2 AMENDMENT TO FACIlllY OPERATING LICENSE Amendment Nn 131 License No. NPF-6 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the licensee) dated October 15, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can he conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l l

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-6 is hereby amended to read as follows:

(2)

Technical Speci_fications The Technical Specifications contained in Appendix A, as revised through Amendment No.131, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION John T. Larkins, Director Project Directorata IV-1 Division of Reactor orojects Ill, IV, and V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications

.Date of Issuance: February 26, 1992

ATTACHMENT TO LICENSE AMENDMENT N0. 131 FACILITY OPERATING LICENSE NO. NPF-6 DOCKET NO. 50-368 i

Revise the following page of the Appendix 'A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

The corresponding overleaf page is also provided to maintain. document completeness.

REMOVE PAGE

. INSERT PAGE 3/4 7-32 3/4 7-32

,m,

. _ _,;em.

..-,..-.-,1,..-.--_

s PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) f.

At least once per 3 years by performing a flow test of the system in accordance with Chapter 5. Section 11 of the Fire Protection Handbook,14th Edition, published by the National Fire Protection Association.

4.7.10.1.2 The fire pump diesel engine shall be demonstrated OPERABLE:

a.

At least once per 31 days by:

1.

Verifying its fuel storage tank contains at least 155 gallons (equivalent to 5/8 ful.), and 2.

Verifying the diesel starts from ambient conditions and operates for at least 20 minutes.

b.

At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank obtained in accordance with ASTM-D270 65 is within the acceptable limits specified in Table 1 of ASTM-D975-74 when checked for viscosity, water and sediment.

c.

At least once per 18 months during shutdown by:

1.

Subjecting the diesel to a inspection in accordance with procedures prepared in conjunction with its manfacturer's recommendations for this class of standby service, and 2.

Verifying the diesel starts from ambient conditions on the auto-start signal and o)erates for at least 20 minutes while loaded with tie fire punp.

4.7.10.1.3 The fire pump diesel starting battery bank and charger shall be demonstrated OPERABLE:

a.

At.least once per 7 days by verifying that:

1.

The electrolyte.)evel of-each battery is above the plates, and 2.

The overall battery votage is > 24 volts, b.

At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.

ARKANSAS - UNIT 2 3/4 7-31

..o..-

..,...,y,

.,s._,

a wm,,.,,.,.,

PLANT SYSTEMS SURVffLLANCE REQUIREMENTS (Continued)

At least once per 15 months by verifying that:

c.

1.

The batteries and battery racks show no visual indication of l physical damage or abnormal deterioration, and 2.

The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated with anticorrosion material.

-ARKANSAS - UNIT 2 3/4 7-32 Amendment No.131

..