GPU Nuclear Corporation
- Nuclear
- :,o m a,v 8o Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
July 10, 1984 5211-84-2149 Office of Nuclear Reactor Regulations Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Inservice Testing of Pumps & Valves (IST) Program Submittal The purpose of this letter is to transmit GPUN's program for Inservice Testing (IST) of pumps and valves whose function is required for safety. This is the program submittal which was discussed in our letter of June 13, 1984. The objective of the IST program is to provide assurance of the operability of Class 1, 2, and 3 pumps and valves.
During the 120-month testing program which is applicable from September,1984, until September, 1994, GPUN is required by 10 CFR 50.55a(g)(4)(ii) to follow the ASME Boiler and Pressure Vessel Code Section XI Division I, 1980 edition and addenda through Winter, 1980.
In addressing the applicable ASME Code Edition and Addenda, GPUN is required by 10 CFR 50.55a(g)(5)(iv) to demonstrate the bases for the determination where inservice testing code requirements are determined to be impractical.
This is to be demonstrated to the satisfaction of the NRC not later than 12 months after the expiration of the initial 120 month period of operation from start of facility commercial operation (September, 1985.)
Table A (attached) applies to all Class 1, 2, and 3 pumps which are provided with an emergency power source. Subtable A-1 describes the pump testing i
program. Subtable A-2 provides GPUN's request for relief from ASME Code Section XI pump test requirements along with justification for the relief.
Table B (attached) applies to all Class 1, 2, and 3 valves. Subtable B-1 describes the valve testing program. Subtable B-2 provides GPUN's request for relief from ASME Code Section XI valve test requirements along with justification for the relief.
l To T w oLieT
- weroce/ joy 7 c4e GPU Nuclear Corporation is a subsidiary of the General Public it Corporation 8407130202 840710 i
PDR ADOCK 05000289 G
4 5211-84-2149 Mr. John F. Stolz Enclosed with this submittal are two copies of the IST drawings which are referenced in Tables A and B.
Copies of Piping and Instrumentation Drawings (P& ids) were provided to NRC prior to our me. ting on IST which occurred on May 15, 1984.
1 The Inservice Testing Program which is described in Tables A and B is permitted by the current Technical Specifications. Therefore, GPUN sees no conflict between TMI-1 Technical Specifications and the updated Inservice Testing program and concludes that Section 50.55a(g)(5)(ii) of the regulation has been met.
Requests for additional relief resulting from plant design modifications during the period for which this program is applicable will be requested as necessary through further correspondence.
However, GPUN does not view changes to the IST program which become necessary as requiring a submittal other than through the reporting requirements of 10 CFR 50.59 unless additional relief from ASME Code Section XI requirements or changes to the Technical Specifications are needed.
This submittal is being forwarded as an application for approval in accordance with the Final Rule on 10 CFR 170, Revision of Licensee Fee Schedule published in the Federal Register on May 21, 1984. Therefore, our check for $150.00 is being provided under separate cover.
Sincerely, H. D. Huiill, Director, TMI-1 HDH/MRK/mle Enclosures cc: