ML20090C201

From kanterella
Jump to navigation Jump to search
Forwards Amend 30 to Fsar.Changes Consist of Update of Radwaste Process Diagrams in Table 1.7-2 & Chapter 11,revs for Radwaste Bldg HVAC Sys Description & Revs to App D Re SER Confirmatory Issues 28,38,39 & 48
ML20090C201
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/05/1984
From: Hall D
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20090C203 List:
References
0210-L, 210-L, U-0720, U-720, NUDOCS 8407130201
Download: ML20090C201 (1)


Text

U-0720 0210-L L34(30)-84 (07- 05)-L

/LLINDIS POWER COMPANY CLINTON POWER STATION. P.o. BOX 678, CLINTON. ILLINOIS 61727 July 5,1984 Docket No. 50-461 Mr. Harold R. Denton, Director

-Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Clinton Power Station Unit 1 FSAR Amendment No. 30

Dear Mr. Denton:

Illinois Power Company hereby files Amendment No. 30 dated June, 1984, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment No. 30 presents changes that update and clarify information. The major changes consist of:

a)

Updating of radwaste process diagrams in Table 1.7-2 and Chapter 11; b)

Revisions for the Radwaste Building HVAC system description; c)

Changes in Attachment A3.8 on containment design loads; d)

Data updating on some containment penetrations in Table 6.2-47; e)

Revisions to Appendix D on the TMI action plan responses relative to SER confirmatory issues #28, 38, 39 and 48.

f)

~ Miscellaneous changes in Chapters 5 and 6 to properly identify

~

the storage tank for RCIC and HPCS suction scurce.

Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10CFR50.30.

erel yours, D. P. Hall 8407130201 840705 PDR ADOCK 05000461 Vice President K

PDR GEW: lam GEW4/M3 enclosures g

f}

Subscribed and sworn to before me the,5'rd day of July,1984.

AlbML$ h w Notary Public MyC mminion 690MI 8h '

L