ML20088A898

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-78 Re Installation & Insp of Fillet Weld Between Structural Member & Embedment Plate. Investigation Continuing.Next Rept Will Be Provided by 840518
ML20088A898
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/04/1984
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
DR-78, RBG--17495, NUDOCS 8404130297
Download: ML20088A898 (1)


Text

-

GULF STATES UTILITIES COMPANY BEAUMONT TEvAS 77704 POST OFFICE E3 O x 2951 A Rf A C ODE 4 09 838 66 31 April 4, 1984 RBG-17495 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcemer_t 97 O h/ r, 611 Ryat, Plaza Drive, Suite 1000

[.

Arlington, Texas 76011

{l.

1 L -

1 ll p~l D3s

[ hl

Dear Mr. Collins:

)?

River Bend Station Unit 1 Docket No. 50-458 N

Interim Report /DR-78 Gulf States Utilities Company has not completed its investigation of DR-78 concerning the installation and inspection of a fillet weld between a structural member and an embedment plate. An interim or final status report will be provided by May 18, 1984.

Sincerely, f

Y h

3 J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Resident Inspector-Site e

8404130297 840404 PDR ADOCK 05000458

,-[/ Q]gg S

PDR L

-