ML20088A898
| ML20088A898 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/04/1984 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| DR-78, RBG--17495, NUDOCS 8404130297 | |
| Download: ML20088A898 (1) | |
Text
-
GULF STATES UTILITIES COMPANY BEAUMONT TEvAS 77704 POST OFFICE E3 O x 2951 A Rf A C ODE 4 09 838 66 31 April 4, 1984 RBG-17495 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcemer_t 97 O h/ r, 611 Ryat, Plaza Drive, Suite 1000
[.
Arlington, Texas 76011
{l.
1 L -
1 ll p~l D3s
[ hl
Dear Mr. Collins:
)?
River Bend Station Unit 1 Docket No. 50-458 N
Interim Report /DR-78 Gulf States Utilities Company has not completed its investigation of DR-78 concerning the installation and inspection of a fillet weld between a structural member and an embedment plate. An interim or final status report will be provided by May 18, 1984.
Sincerely, f
Y h
3 J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Resident Inspector-Site e
8404130297 840404 PDR ADOCK 05000458
,-[/ Q]gg S
PDR L
-