ML20088A897
| ML20088A897 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/02/1984 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| DR-149, RBG--17487, NUDOCS 8404130296 | |
| Download: ML20088A897 (1) | |
Text
GULF STATES UTILITIES COMPANY BEAUMONT. TEXAS 77704 POST OFFICE BOX 2951 ARfA C0DE 409 838 -6631 April 2, 1984 RBG-17487 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins. Re.cional Administrator U. S. Nuclear Regulatory Commission
@@hk "l
Region IV, Office of Inspection and Enforcement l'
611 Ryan Plaza Drive, Suite 1000
/
4 i
Arlington, Texas 76011 APR - 91984 y
Dear Mr. Collins:
u River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-149 Gulf States Utilities Company has not completed its investigation of DR-149 concerning post weld heat treatment for fabricated pipe supports supplied by Bergen-Paterson.
An interim or final status report will be provided by May 21, 1984.
Sincerely, k
'J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/ht cc:. Director of-Inspection-& Enforcement U. S. Nuclear Regulatory Commission.
~ Washington, D. C. 20555.
NRC Resident Inspector-Site 8404130296 840402
~
[
~
_S.
05000458
[ h[-
PDR ADOCK fon u,
L
,