Interim Deficiency Rept DR-149 Re post-weld Heat Treatment for Fabricated Pipe Supports Supplied by Bergen-Paterson. Interim or Final Status Rept Will Be Provided by 840521
ML20088A897
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/02/1984
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
DR-149, RBG--17487, NUDOCS 8404130296
Download: ML20088A897 (1)


Text

GULF STATES UTILITIES COMPANY BEAUMONT. TEXAS 77704 POST OFFICE BOX 2951 ARfA C0DE 409 838 -6631 April 2, 1984 RBG-17487 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins. Re.cional Administrator U. S. Nuclear Regulatory Commission

@@hk "l

Region IV, Office of Inspection and Enforcement l'

611 Ryan Plaza Drive, Suite 1000

/

4 i

Arlington, Texas 76011 APR - 91984 y

Dear Mr. Collins:

u River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-149 Gulf States Utilities Company has not completed its investigation of DR-149 concerning post weld heat treatment for fabricated pipe supports supplied by Bergen-Paterson.

An interim or final status report will be provided by May 21, 1984.

Sincerely, k

'J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/ht cc:. Director of-Inspection-& Enforcement U. S. Nuclear Regulatory Commission.

~ Washington, D. C. 20555.

NRC Resident Inspector-Site 8404130296 840402

~

[

~

_S.

05000458