Text
-
Commonwealth Edison O'
) one First National P? ara, Chicago, Ilknoss i
T
') Address R: ply to: Post Ofhce Box 767 l
\\
f Chicago, Ilknois 60690 April 5, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. M.iclear Regulatory Commission Washington, DC 20555
Subject:
LaSalle County Station Unit 1 Revised Request for Change to W F-ll Technical Specifications Regarding Upgrade to Reflect Unit 2 Technical Specification Changes NRC Docket No. 50-373 Reference (a): LaSalle County Station Unit 2 license WF-18 dated December 16, 1983 (b):
C. W. Schroeder 1.etter to H. R. Denton dated January 13, 1984.
(c):
C. W. Schroeder letter to H. R. Denton dated March 22, 1984.
Dear Mr. Denton:
Reference (c) resubmitted the following change in technical specifications for LaSalle County Station Unit 1.
Change request WF-ll/84 Revise Unit 1 Technical Specifications to reflect changes incorporated into Unit 2 Technical Specifications.
This change was originally submitted by Refernce (b). The NRC rejected Reference (b) and requested that Commonwealth Edison Company resubmit this. request with additional information.
The purpose of this letter is to correct information that was provided in the Reference (c) submittal.
Item 30 of Attachment A should be revised to include page 3/4 6-25 as follows:
- 30. Table 3.6.3-1.
(Pages 3/4 6-24, 25, 26, 27, 28, 32, 34) a.
(PCIS valves) added # (3.0.4 not applicable) to various valves, b.
Revised butterfly valve times after first refuel outage.
(Also some VQ valve times have changed immediately.)
c.
1CM0238 and 204024A have been deleted.
/bol
- d. '1E12-F099B added.
8404100393 840405
,lfg PDR ADOCK 05000373 p
V, a' H. R. Denton -
April 5, 1984 Item 35 of Attachment A.should be revised to correct the applicable page number, 7-46 rather than 7-34:
35.
Page 3/4 7 deleted calibration requirement for Main Turbine Bypass System and deleted valve position requirement.
Also changed applicability to 25% power. Deleted startup test footnote.
Commonwealth Edison Company is notifying the State of Illinois of letter to-the designated State official.the change to our request for this am this office.If there are any questions concerning this matter please contact Respectfully,
_e M P. L. Barnes H; clear Licensing Administrator im cc: Dr. A. Bournia NRC Resident Inspector - LSCS G. Wright - State of Illinois 8416N