Requests Concurrence for Removal of Six Q Relief Valves Upstream of MSIV to Support non-Q Hydrostatic Test Program. Hydrostatic Activities Scheduled to Start 840404
ML20087P524
Person / Time
Site: Midland
Issue date: 04/02/1984
From: Quamme D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20087P520 List:
References
CSC-7572, NUDOCS 8404090126
Download: ML20087P524 (2)


Text

___

CODSUlilBIS r

'3Do Pacer

, - ' nper Du Man s

COUhEU$

"M

.}

/

p.m w w po me. sees. - em deseo. sin ass.eeso J

April 2, 1984 Mr J J Harrison Chief. Midland Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Clan Ellyn. IL 60137 MIDLAND ENERCY CENTEE MIDLAND DOCKET NOS 50-329, 50-330 TURBIME ROL1. Q RELIEF VALVE REMOVAL File: 0655, Bl.7.3, 0460.2 UFI: 51*09, 53*50*04 serial: CSC-7572 99*08. 03200(s)

The purpose of this letter is to request your concurrence for the removal of six Q relief valves upstream of the main steam: isolation valves, his removal is required to support the non-Q hydrostatic test program required prior to system turnover related to Turbine Roll. De removal of these valves is required to insure that steam or water does not enter the steam generators during testing activities while performing Turbine Roll.

The relief valves (2PSV 3207 MB, 3208 A&B, 3209 MB) have had the Quality Verification Program (qVP) activities performed on them and will be removed in accordance with a Construction Work Plan (CUF) once we obtain your concurrence.

We CUP will include the Quality Work Package (qWF) which covers the destatosing of the present PQCIR's and issuance of new PQCIR's for the reinstallation.

h e storage of the relief valves will be performed in accordance with TPG-5.000 (Storage. Handling, and Maintenance of Permanent Plant Equipment and Materials).

h e initial installation and removal of temporary plugs will be part of the hydrostatic test package, he plugs will be removed once the hydrostacic test is performed. A Contrector Work Request (CWR) will be written to cover the installacion and removal of the plugs on subsequent festing activities as well as being added to the noter punchlist as a tracked item.

A proutpt reply to this letter would be appreciated in order to support the hydrostatic activities Ischeduled to start on April 4,1984 o

DLQ/TAS/kp a

-1 cc:' DSHood, U S Nuclear Regulatory Commission RJCook, Midland Resident Inspector JCKeppler, Regioual Administrator Region III INCardner U S Nuclear Regulatory Commission 8404090126 840403 PDR ADOCK 05000329

_ _ _..A PDR

___..___,.._,m,..,__,_____,_.m__.._,_.,

Faso 2 CSC-7572 Ecc JWcook, P26-3365 SEBowell, M-1180 TARoczwinski, Midland LCrabar. LIS JNLeech,- P24-507 DPLewis, Bechtel GALov, P12-237A MIMiller. 1143 DA$ommers, P14-106 DJVandevalle, P24-614B RJWalraven. P24-517 RAWells, Midland RCWilliams,1143 DTPerry, Midland KEMarbaugh, Midland I

NRC Correspondence File, P24-517

~

I UFI, P24-511 QiS-Midland-RDicCue, Midland RC DMBudsik, P24-517A RJErhardt, P14-113A LSGibson, P24-618A P24-505 (Lagt) t t

"e e

m a

mww.

e e

- 4

,- s v!?i

-~s 3,;

u.

i

it-1 1

l l

7L a

~

i

- c j

.:.,.:.u=c.

rt 7b

.?H i :-i ~ ! -~'

e c.

+4 f

c.- -

- r,.,

~,

V

'e.

'S e

'h

~1.z ;..p

= '.. X >~ s 6

~

~

r i

t

...