Monthly Operating Rept for Feb 1984
ML20087M703
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/29/1984
From: Murray T, Sarsour B
TOLEDO EDISON CO.
To: Haller N
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
K84-306, NUDOCS 8403300184
Download: ML20087M703 (6)


Text

.. . . . . . _ _ . _ _ _ _

OPER ATING DATA RI; PORT DOCKET NO. 50-346 DATE March 9, 1984 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, Ext. .384 OPERATING STATUS

1. Unit Name: Davis-Besse Unit 1 Notes
2. Reporting I'eriod: February 1984
3. Licensed Thermal Power (MWt): 2772
4. Nameplate Rating (Gross MWe): 925
5. Design Electrical Rating (Net MWe): 906
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 874
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month . Yr..to.Date Cumu!ative

11. Hours in Reporting Period 696 1,440 48,961
12. Number Of Hours Reactor Was Critical 696.0 1.057.I 28.559.6
13. Reactor Reserve Shutdown Ho irs 0.0 0.0 3,879.3
14. Hours Generator On-Line 696.0 1.036.4 27.I88.2
15. Unit Reserve Shutdown Hours 0.0 0.0 1,732.5
16. Gross Thermal Energy Generateo (MWH) 1.890.726 2.696.380 63.740.194 .
17. Gross Electrical Energy Generated (MWH) 626.758,_, 891.050 21.183.243
18. Net Electrical Energy Genersted (MWil) 595.680 834.609 19.833.308
19. Unit Service Factor 100.0 72.0 55.5
20. Unit Availability Factor 100.0 72.0 59.1
21. Unit Capacity Factor (Using MDC Net) 97.9 66.3 46.3 22, Unit Cspacity Factor (Using DER Net) 94.5 64.0 44.7
23. Unit Forced Outage Rate 0.0 28.0 19.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Datc, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date o_f Sextup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8403300184 840229 F/77 3 PDR ADOCK 05000346 g

R PDR _ .

II

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-236 UNIT Davis-Besse Unit 1 DATE March 9, 1984 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, Ext. 384 I MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net) (gwe. Net) 1 859 37 870 2 845 gg 870 i 3 835 19 869 4 835 20 870 5 820 23 869 6 742 22 869 7 863 23 868 8 861 24 862 9 863 25 867 10 866 26 856 t

II 866 869 27 12 836 868 28 13 856 29 865

. 14 866 30 15 865 3, 16 87l' INSTRUCTIONS i

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

^19I77)

I 4

4

.r . ~ -, *- , ,

~

i 1

DOCKET NO. 50-346 ',

  • UNIT SHUTDOWNS AND POW:.:t REDUCliUNS -

UNIT NA%1E Davis-Besse Unit 1 DATE March 9. ion -

February, 1984 COMPLETED BY Bilal Scrsour REPORT MONTil TELEPilONE 419-259-5000. Ext. 384 i .

k N"-

.! E $ .Ek Licensec ,i% Cause & Corrective f Dd8' h ~E a .$ .2! 5 E Event .7 h Action in cs E $ j gg g Report a s$% yS" Prevens Recurrence 6

.j .

l l

l i

. l

~'

NO UNIT SHUTDOWNS OR POWER REDUCTIONS l 4

l ,

Y t '

e

, I 2 3 4 l - F: Forced Reason: Method: Exhibit C-Instructions S: Schedu 8ed ' A-Equipment Failure (Explain) 1-Manual for Preparation of Data 1 B. Maintenance of Test 2-Manual Scrani. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LERI File tNUREG-D Regulatory Restriction 4-Continuation from Previous Month 0161)

E-Operatur Training & License Exandnation  : 5-Load fleduction F-Administrative 9-Other (Explain) 5 i

' G-Operatiinni Eirur (Explain) Exliibit I - Sane Source 19/77) Il-Ottier (Explain)

l

~

. 1 a l l'

OPERATIONAL

SUMMARY

Feb rua ry , 1984 The unit operated at approximately 99% of full power until 2238 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.51559e-4 months <br /> on February 5, 1984, when Control Rod Group 7-7 experienced a ratchet trip to 5% withdrawn. When a runback did not occur, the reactor.was manually reduced to 60% power. Following the replacement of a fuse on Rod 7-7, reactor power was increased and returned to 90% power at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> on February 6,1984 and 99% power later than night.

The unit operated at approximately 99% power the rest of the month.

9

  • P 4

d a

b k

[Qf .+

x , v-

-'"%,~ ,

O

~

l l

REFUELING INFORMATION DATE: Feb ruary, 1984  !

1. Name of facility: Davis-Besse Unit 1
2. Scheduled date for next refueling shutdown: August 3, 1984
3. Scheduled date for restart following refueling: October 14, 1984
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amandment? If answer is yes, what in general will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Ans: Expect theRel[adReport to require standard reload fuel design Technical Specification changes (3/4.1 Reactivity Control Systems and 3/4.2 Power Distribution Limits).

5. Scheduled date(s) for submitting proposed licensing action and supporting information: July, 1984 '
6. Important licensing considerations associated with refueling,-e.g.,

new or different fuel design or suppliar, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Ans: None identified to date.

7. The number of fuel assemblies (a) in the core and (b) in the spent .

fuel storage pool.

(a) 177 (b) 140 - Spent Fuel Assemblies

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed' storage capacity that has been requested or is planned, in number of fuel assemblies.

Present: 735 Increase size by: 0 (zero)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

Date: 1993 - assuming ability to unload the entire core into the spent fuel pool is maintained.

n t --

L TOLEDO

%sm EDISDN March 9, 1984 Log No. K84-306 File: RR 2 (P-6-84-02)

Docket No. 50-346 License No. NPF-3 Mr. Norman Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Haller:

Monthly Operating Report, February, 1984 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the month of February, 1984.

If you have any questions, please feel free to contact Bilal Sarsour at (419) 259-5000 Extension 384.

Yours truly, 7 m-DF Terry D. Murray Station Superintendent Ly Davis-Besse Nuclear Power Station It TDM/BMS/ljk Enclosures cc: Mr. James G. Keppler, w/1 Regional Administrator, Region III Mr. Richard DeYoung, Director, w/2 Office of Inspection and Enforcement Mr. Walt Rogers, w/l NRC Resident Inspector THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE . TOLEDO, OHIO 43652