JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1984 During the month of February, there was one (1) automatic shutdown which occ;ered bruary 10, 1984. The Cycle V-VI refueling outage started on Febr;ary 10, 1984.
I The following safety-related maintenance was performed in the month of February:
1.
Performed miscellaneous maintenance on diesel generr. tors.
2.
Replaced detectors on radiation monitors R-27A & B.
4
.I l
. mg yy F W hD CK 0 1<
. R.;
DR 1
Y l'
OPERATING DATA REPORT y
50-348 a
DOCKET NO. 7-6-84 DATE COMPLETED BY W.G. Hairston, III TELEPHONE (205) 879-5156 OPERATING STATUS
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
- 1) Cumulative data since
- 2. Reporting Period:
Februnrv. 1984 12-1-77, date of I
- 3. Licensed Thermal Power (MWt p:
2652 l
- 4. Nameplate Rating (Gross MWe):
860 commercial operation.
I S. Design Electrical Rating (Net MWel:
829
- 6. Maximum Dependable Capacity (Gross MWe):
841.8
- 7. Maximum Dependable Capacity (Net MWe):
797*I i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A j
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr to.Dete
' Cur' ulative n
- 11. Hours In Reporting Period 696 1,440 54,768
- 12. Number Of Hours Reactor Was Critical 240.0 938.0 36,061.2
- 13. Reactor Reserve Shutdown Hours n.0 nn 3.650'.7' r
- 14. Hours Generator On.Line 240.0 904.5 35.007.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 631,428 2,360,784 88,462,310
- 17. Gross Electrical Energy Generated (MWH) 203.000 751,662 28,094,672
- 18. Net Electrical Energy Generated (MWH) 188,394 706,670 26,407,732
- 19. Unit Service Factor 34.5 62.8 63.9
- 20. Unit Availability Factor 34.5 62.8 63.9
- 21. Unit Capacity Factor (Using MDC Net).
34.0 61.6 60.5
- 22. Un;; Capeity Factor (Using DER Net) 32.7 59.2 58.2
- 23. Unit Forced Outage Rate 0.0 8.I 15.1
- 24. Shutdowns Scheduled O+er Next 6 Months (Type. Date,and Duration of Each t:
N/A
- 25. If Shut Down At End Of Report Perind. Estimated Date of Startup:
April 14, 1984
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achieved '
INITIAL CRITICALITY 8-6-77 8-9 INITIAL ELECTRICITY -
8-20-77 8-18 COMMERCIAL DPERATION 12-1-77 12-1-77 (w??)-
~'
~~~
DOCMT NO.
50-348 I
UNIT 3-6-84 DATE COMPLETED SY U.G. Hairston, III (205) 899-5156 TELEPHONE 3[0t(T11 Februarv. 1984 DAY AVERACE DAILY POWER LEVEL DAY AYERACE DAILY POWER LEVEL (AlWe Net)
(SIWE Net) 812 0
I.
g7 2
809 gg 0
I 807 3
39 g
i 807 4
20 n
809 g
810 6
n 811 7
g 0
g 810 24 0
9 Rnn gg-n 10 750 3
0 II O
27 0
12 0
0 3
13 o
3 0
0 14 30 15 0
3g 16 0
ELTTRUCTIONS On rHs form:t. list the avenge daily unit power Icvelin MWe Net for each d:y in the reporting month. Campute to
, the neare:t whole me;swatt.
(9p7)
UNIT Sil01 DOWNS AND POWER REDUC 110NS DOCKET NO.
50-348 UNIT NAhlE
._J. M. Farley-Unit 1 DA1E 3-6-84 C0hlPLET Ell llY U_c Hnfrston. III REPORT h10Nfil Fahrunrv-1984 TEl.LPil0NE (705T R99-51k6 E
c
.! E "k
j E5 Licensee
,E-r, jvt Cause 1 Curreceive No.
Date g
3g jg5 Event gg ni Action to mu gu Prevent Recurrence H
y5 5
3 i?3 c Report
- u e
6 003 840210 S
456.0 C
3 84-002-00 N/A N/A The unit was taken off line for the Cycle V-VI refueling outage. During normal shutdown operations, a reactor trip occurred from 10% power.
l l
l l
l l.
I 2
3 4
l F: l'orced Reason:
hiethod:
Exhibit G. Instaurtions l.
S: Scheduled A Equipenent Failure (Explain) 1 klanual for Pseparatiini of D.ita l
II.klaintenance of Test 2 klanual Scram.
Entry Sheets for I.icensee L
C. Refueling 3.Autuinatic Scram.
Frent Rep.nl (1.Elli file INUREG-l.
-D Regulasiny Resisiction 4.Other (Explain) 0161) j E. Operator Tsaining & license Examination L
F. Adminisisative 5
i G Opciational tesor (Emplain)
Esinbis 1 - Same Source
('s/77) ll Othes (Explain) l..
L
Revision to the Report Submitted 2-10-84 OPERATING DATA REPORT DOCKET NO. 50-348 DATE 3-6-84 COMPLETED BY U-c Hair (20M 899-N N' III TELEPHONE OPERATING STATUS
- 1. Unit Name:
J seph H. Farley - Unit 1 Notes
- 2. Reporting Period:
January, 1984 1)
Cumulative data since 2652 12-1-77, date of
- 3. Licensed Thermal Power iMWt):
860
- 4. Nameplate Rating (Gross MWe):
commercial operation.
- 5. Design Electrical Rating (Net MWe): M4
- 6. Maximum Dependable Capacity (Gross MWe):
841.8
- 7. Maximum Dependable Capacity (Net MWe):
797 I
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items 6 and 7 changed due to annual update.
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr. to.Date Curnulative
- 11. Hours In Reporting Period 744 744 54,072
- 12. Number Of Hours Reactor Was Critical 698.0 698.0 35,821.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650./
- 14. Hours Generator On.Line 666.5 664.5 34.767.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.729,356
- 17. Gross Electrical Energy Generated (MWH) 548,662 1,729,356 87,830,882__
548,662 27,891,672
- 18. Net Electrical Energy Generated (MhH) 518,276 518,276 26,219,338
- 19. Unit Service Factor 89.3 89.3 64.3
- 20. Unit Availability Factor R4 M R4.1 64.3
- 21. Unit Capacity Factor (Using MDC Net) 87.4 87.4 60.8
- 22. Unit Capacity Factor (Using DER Net) 84.0 84.0 58.5
- 23. Unit Forced Outage Rate 10.7 10.7 15.2
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Each1:
Refueling / maintenance outage, 2-10-84, approximately 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast
' Achieved INITIA L CRITICALITY 8-6-77 8-9-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77 toIT7).
R2 vision to tha R port Submitted 12-12-83 50-348 UNIT Sil01 DOWNS AND POWER REDUCTIONS DOCK ET NO.
UNIT NAhlE J.M.
Farley Unit I DATE 12-5-83 REPORT hlON Ill November. 1983 COSIPLETED BY W.G. Ilairston, III TEl.LPIIONE (205) 899-5156 4 a. 3 E
E-re No.
l>are i
j5 5
g yy Licensee 31
$4 Cause & Curreceive Event g,7 ag Ac,,on to B
O Ege o:E mo Eo E
313 =
Report a 6
Prevent Recurrence r-6 THERE WER E NO UNIT 3HUTDUWNS OF SIGNIFICANT POWER REDUCTIONS IN THE MONTH OF NOVDiBER.
I 2
3 4
F: I orced Reason:
hiethod:
Exhibit G. instructions
'S: Sdieduled A.I?quipment tr ilure(Explain) 1.hlanual for Preparation ofl>ata a
ll hlaintenance of Test 2 klanual Sciam.
Entsy Sheets fos I.iccusee C. Refueling
- 3. Automatic Sciam.
Event Repost (1.ER) f ile (NUREG-D RcEulaimy Iksisittion 4.Other (Explain) 0161)
E. Operator Training & license Examination itAdministrative 5
G Opciational Lesor (lixplain) thtubit I Same Source
+
01/77)-
11 Othes (Explain)
M;iling Addr+.s2 i
Alabama Power Company DOO North 18th Street Post Othce Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
Senior Vice President fhntridge Budding
/MDk)DJ11a POWCf tresouthern etectnc sntum March 14, 1984 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the February 1984 Monthly Operating Report (MOR) for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. A revised Operating Data Report page for the January 1984 MOR and a Unit Shutdowns and Power Reductions page for the November 1983 MOR are also attached. The January revision reflects the proper MDC (Gross) and MDC (Net) data that was previously reported incorrectly. The November page was inadvertently omitted in the November MOR.
If you have any questions, please advise.
Yours very truly, fa
. L. Clayton, J.
FLCJ r/KWM: sam Enclosures y
xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy)