ML20087M652
| ML20087M652 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/31/1984 |
| From: | Chapman M TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20087M644 | List: |
| References | |
| NUDOCS 8403300139 | |
| Download: ML20087M652 (2) | |
Text
.
Corrected OPERATING DATA REPORT I
DOCKET NO. 50-259 DATE 2/1/84 COMPLETED BY M.Chan~m l
TELEPfl0.NE 205/729-0834 l
OPER ATING STATUS
- 1. Unit Name:
Browns Ferry -1 N"8
- 2. Reporting Period:
January 1984
- 3. Licenwd Thermal Power (MWt):
3293 1152
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Masimum Dependable Capacity (Gross MWe):
1098.4
- 7. Mnimum Dependable Capacity (Net MWe):
1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,if Any (Net MWe):
N/A
- 10. Reawm For Restrictions. If Any:
N/A This Month Yr..to Date Cumulatise I1. Iluurs in Reporting Period
- 744 744 83,306
- 12. Number OfIlours Reactor Was Critical 727.68 727.68 50,533.80
- 13. Reactor Reserve Shutdown liours 0
0 5,785.02
~
- 14. Ilours Generator On Line 677.97 677.97 49,395.61
- 15. Unit Resene Shutdown llours 0
0
-0
- 16. Gross Thermal Energy CenerateJ (MWil) 1.625.642 1.625.642 140.183.321
- 17. Grow Electrical Energy Generated (MWil) 546.640 546.640 46,192,260
- 18. Net Electrical Energy Generated (MWHI 533.247 533.247 44.858.574
- 19. Unit Senice Factor
.11.I 91.1 59.3
- 20. Unit Asailability Factor 91.I 91.1 59.3
- 21. Unit Capacity Factor (U>ing MDC Net) 67.3 67.3 50.6
- 27. Unit Capacity Factor (Using DER Net) 67.3 67.3 50.6
- 23. Unit Forced Outage Rate
.4.8 4.8 23.6
- 24. Shutdowns Scheduled Over Nest 6 Months IType. Date.and Duration of Each t:
- 25. II Shut Down At End Of Report Period. Estimated Date of Startup:
2ti. Units in lest Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CHI TICAl li'Y INiilAL ELECTRICIIV COMM ERCIA L Orl:R \\ TION 8403300139 840309 l
PDR ADOCK 05000259
("!.U 8 R
PDR 1
l L
Corrected t>
UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-259 UNIT NAME Browns Ferrv-l DATE 2/4/84 January 1984 COMPLETED BY M.
ch n-,n REPORT MONTil TELEPHONE (205)72'3/0834 w.
E E
.5 g "h
4 YM Licensee
[v, y%
Cause & Correctise No.
Date r;-
3g s
j s&
Event gy 93 Action to
$E 5
5 ;g =
Report =
mO E'
Prevent Recurrence g
o e
o 264 1/1/84 S
31.75 C
4 EOC-5 Refuel Outage 265 1/2/84 S
0.37 B
Unit offline for turbine overspeed trip test 266 1/6/84 F
9.27 A
Unit offline due to turbine high vibration
-267
-1/6/84-- -F - 24.65- -H-
~1-Reactor scram due to a bad rod pattern 268 1/13/84 F
A "A",
"B", and "C" string high-pressure heaters isolated 269
.1/27/84 S
H Control rod sequence exchange I
~
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Pseparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for 1 icensee C-Refueling 3 Automatic Scram.
Event Report iLERI File iNURI G-D Regularory Restriction 4 Other (Explaint Ol611 E-Operator Training & License Examination F-Administrative 5
G Operational Error (Explain t Exhibin I - Same Source l')/77)
II-Other (Explain)
-