ML20087M596
| ML20087M596 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/29/1984 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8403300087 | |
| Download: ML20087M596 (5) | |
Text
'
Mhh
.SN OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 3-2-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes l
- 1. Unit Name
________________________Monticelto l
l
- 2. Reporting period: ___________________ FEBRUARY l
l
- 3. Licensed Thermal Power (MWt):
____________1670 l
l
- 4. Nameplate Rating (Gross MWe): _____________569 l
l
- 5. Design Electrical Rating (Net MWe): _____545.4 l
1
- 6. Maximum Dependable Capacity (Gross MWe): __553 l
l 7.
Maximum Dependable Capacity (Net MWe): ____525 l__________________________l 8.
If Changes Occur in Capacity Ratings-(Items Number 3 Through 7) Since Last Report, Give Reasons: __N/A_____________________________________________
- 9. Power Level To Which Restricted, If Any (Net Mye): ___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_______kL____________________________
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____696
_____1440
____111049
- 12. Number Of Hours Reactor Was Critical
___ 66.5
___ 810.5
__ 89915.4
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___ 64.8
___ 808.8
__ 88003.0
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH) 57552 897898
_141233814
- 17. Gross Elec trical Energy Genera ted (MWH) __ 18649
__ 296117
__45185053
- 18. Net Electrical Energy Generated (MWH)
__ 15749
__ 279133
__43190897
- 19. Unit Service Factor 9.3%
___ 56.2%
____ 79.2%-
- 20. Unit Availability Factor 9.3%
___ 56.2%
.____ 79.2%
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 4.3%
___ 36.9%
____ 74.1%
- 23. Unit Forced Outage-Rate 4.2%
___ 36.3%
____ 72.8%
O.0%
0.0%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Dura t ion o f Each).
__ February 3, 1984 - Refueling Outage - 224 days ____ ___________________
________________________________________________________________________,j
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___9-14-84__
- 26. Units In Test Status (Prior to Commercial Operation). N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION B403300087 840229 PDR ADOCK 05000263 a
eon y2q
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT Monticello__
DATE 3-2-84____.
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 4 i
__________331____________
17
__________ -i____________
2
__________208____________
18
__________ -i____________
3
________-_194____________
19
_1____________
4
-4____________
20
__________ -i____________
5
-5____________
21
__________ -i____________
6
-5____________
22
__________ -i____________
7
-4____________
3
-1____________
8
-3____________
24
__________ -i____________
i I
o o.
~
10
-3____________
26
__________ -i____________
ii
-3____________
27
-1____________
1o
_n_____________
n8
__________ -i____________
13
_a____________
ao
_i____________
1 14
__________ -i____________
30 15
__________ -i____________
31 16
__________--1____________
INSTRUCTIONS 1
On.this format, List the average daily unit-power level-in MWe-Met for each-R day.in the reporting month.
Cornpute ' to the neares t : whole megawa l t.
I I
l l
l' NARRATIVE-
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 3-2-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
I 2-1-84 to Power operation.
2-3-84 2-4-84 Plant shutdown for 1984 refueling outage.
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
A I
i__
s l
L UNIT Sill'IDOWNS AND POWER REDUCTIONS DOCKET NO.
50-263 l.
UNIT N AME Monticello DATE 3-2-84 A.
L. Myrabo H EPOR T.4f 0N Hf February COMPLETED BY TELEPilONE 612/295-5151 h E' 4 Licensee 5,,,
59.,
Cause & Corresine
{?
lhie
.i 5g 4
2s5 Isent 3,7 g,3 Aunmso j5
- s 3 p, j Repori =
xL
,E
- Prevent Recurrence
/.
v
- i 1
2-2-84 S.
0.0 B
4 N/A IIA TURBIN Reduced power to perform turbine and feedwater heater testing.
2
.'2-3-84 S
631.2 C
1 N/A.
ZZZZ ZZZZZZ Start of 1984 refueling outage.
t I-2 3
4 F: Forced Reason.
Method:
Exlobit G-Instrudions S: Schedufed A Equrpment FailurelExplain) 1 Manual for Preparation of Data is-Maintenance oi Tes 2 Manual Seram.
Entry Sheets for Licensee C. Refueling 3-Autunutie Stram.
Esen Report tLER) File NUREG-D-Regulatory Resitiction 4-Other (Explam i 01611 1:-Operator Training & Li,ense Esanunation F Adnunistraine 5
G Operational Es ror (Expla:al Esinbit I Same Source IW77) 110:her (Explain t
8 Northem States Power Company 414 Nicollet Mzil Minneapons. Minnesota 55401 Telephone (612) 330-5500 March 6, 1984 Director, Office of Resource Management U S Nuclear Regulatory Commissien Washington, DC 20555 M0?RICELLO NUCLEAR GENERATING PLATE Docket Ne. 50-263 License No. DPR-22 Monthly Operating Report February, 1984 Attached are twelve copies of the Monthly Operating Report for February, 1984 for the Monticello Nuclear Generating Plant.
B J A.
David Musolf Manager of Nuclear Support Services DMM/ dab cc: Regional Administrator-III, NRC NRR Project Manager, NRC h7C Resident Inspector MPCA Attn: J W Ferman Attachment p e*[? e,
Codesca M I
L 1
> b
,