Monthly Operating Rept for Feb 1984
ML20087M596
Person / Time
Site: Monticello 
Issue date: 02/29/1984
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8403300087
Download: ML20087M596 (5)


Text

'

Mhh

.SN OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 3-2-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes l

1. Unit Name

________________________Monticelto l

l

2. Reporting period: ___________________ FEBRUARY l

l

3. Licensed Thermal Power (MWt):

____________1670 l

l

4. Nameplate Rating (Gross MWe): _____________569 l

l

5. Design Electrical Rating (Net MWe): _____545.4 l

1

6. Maximum Dependable Capacity (Gross MWe): __553 l

l 7.

Maximum Dependable Capacity (Net MWe): ____525 l__________________________l 8.

If Changes Occur in Capacity Ratings-(Items Number 3 Through 7) Since Last Report, Give Reasons: __N/A_____________________________________________

9. Power Level To Which Restricted, If Any (Net Mye): ___N/A___________________
10. Reasons For Restrictions, If Any:

__N/A_______kL____________________________

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_____696

_____1440

____111049

12. Number Of Hours Reactor Was Critical

___ 66.5

___ 810.5

__ 89915.4

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___ 64.8

___ 808.8

__ 88003.0

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated (MWH) 57552 897898

_141233814

17. Gross Elec trical Energy Genera ted (MWH) __ 18649

__ 296117

__45185053

18. Net Electrical Energy Generated (MWH)

__ 15749

__ 279133

__43190897

19. Unit Service Factor 9.3%

___ 56.2%

____ 79.2%-

20. Unit Availability Factor 9.3%

___ 56.2%

.____ 79.2%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 4.3%

___ 36.9%

____ 74.1%

23. Unit Forced Outage-Rate 4.2%

___ 36.3%

____ 72.8%

O.0%

0.0%

5.3%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Dura t ion o f Each).

__ February 3, 1984 - Refueling Outage - 224 days ____ ___________________

________________________________________________________________________,j

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:___9-14-84__
26. Units In Test Status (Prior to Commercial Operation). N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION B403300087 840229 PDR ADOCK 05000263 a

eon y2q

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT Monticello__

DATE 3-2-84____.

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 4 i

__________331____________

17

__________ -i____________

2

__________208____________

18

__________ -i____________

3

________-_194____________

19

_1____________

4

-4____________

20

__________ -i____________

5

-5____________

21

__________ -i____________

6

-5____________

22

__________ -i____________

7

-4____________

3

-1____________

8

-3____________

24

__________ -i____________

i I

o o.

~

10

-3____________

26

__________ -i____________

ii

-3____________

27

-1____________

1o

_n_____________

n8

__________ -i____________

13

_a____________

ao

_i____________

1 14

__________ -i____________

30 15

__________ -i____________

31 16

__________--1____________

INSTRUCTIONS 1

On.this format, List the average daily unit-power level-in MWe-Met for each-R day.in the reporting month.

Cornpute ' to the neares t : whole megawa l t.

I I

l l

l' NARRATIVE-

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 3-2-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______

I 2-1-84 to Power operation.

2-3-84 2-4-84 Plant shutdown for 1984 refueling outage.

Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

A I

i__

s l

L UNIT Sill'IDOWNS AND POWER REDUCTIONS DOCKET NO.

50-263 l.

UNIT N AME Monticello DATE 3-2-84 A.

L. Myrabo H EPOR T.4f 0N Hf February COMPLETED BY TELEPilONE 612/295-5151 h E' 4 Licensee 5,,,

59.,

Cause & Corresine

{?

lhie

.i 5g 4

2s5 Isent 3,7 g,3 Aunmso j5

s 3 p, j Repori =

xL

,E

  • Prevent Recurrence

/.

v

i 1

2-2-84 S.

0.0 B

4 N/A IIA TURBIN Reduced power to perform turbine and feedwater heater testing.

2

.'2-3-84 S

631.2 C

1 N/A.

ZZZZ ZZZZZZ Start of 1984 refueling outage.

t I-2 3

4 F: Forced Reason.

Method:

Exlobit G-Instrudions S: Schedufed A Equrpment FailurelExplain) 1 Manual for Preparation of Data is-Maintenance oi Tes 2 Manual Seram.

Entry Sheets for Licensee C. Refueling 3-Autunutie Stram.

Esen Report tLER) File NUREG-D-Regulatory Resitiction 4-Other (Explam i 01611 1:-Operator Training & Li,ense Esanunation F Adnunistraine 5

G Operational Es ror (Expla:al Esinbit I Same Source IW77) 110:her (Explain t

8 Northem States Power Company 414 Nicollet Mzil Minneapons. Minnesota 55401 Telephone (612) 330-5500 March 6, 1984 Director, Office of Resource Management U S Nuclear Regulatory Commissien Washington, DC 20555 M0?RICELLO NUCLEAR GENERATING PLATE Docket Ne. 50-263 License No. DPR-22 Monthly Operating Report February, 1984 Attached are twelve copies of the Monthly Operating Report for February, 1984 for the Monticello Nuclear Generating Plant.

B J A.

David Musolf Manager of Nuclear Support Services DMM/ dab cc: Regional Administrator-III, NRC NRR Project Manager, NRC h7C Resident Inspector MPCA Attn: J W Ferman Attachment p e*[? e,