OPERATlHG DATA REPORT DOCKET NO.
50-244 DATE Marc,h 10, 1984 COMPLETED BYhm/u[N[h Robert E. Dodge TELEPilONE 1 (315) 524-4446 OPERATING STATUS Ext. 396 at.Ginna
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes The reactor power level
- 2. Reporting Period: February, 1984 was maintained at 100% for the 1520 majority of the report month.
- 3. Licensed Thermal Power (Mit):
490
- 4. Nameplate Rating (Gross MWe):
Exceptions are detailed 470
- 5. Design Electrical Rating (Net MTe):
p 4,
490
- 6. Maximum Dependable Capacity (Gross MTe):
- 7. Maximum Dependable Capacity (Net MTe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net MTe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-t o-Da te Cumulative
- 11. Ilours In Reporting Period 696 144n 19; n16
- 12. Number of flours Reactor Tas Critical 696 1440 95.039.98 0
0 1.631.32
- 13. Reactor Reserve Shutdown flours 696 1440 92,951.63
- 14. Ilours Generator On-Line 0
0 8.5'
- 15. Unit Reserve Shutdown llours
- 16. Gross Thermal Energy Generated (MTil) 1.027.536 2,142,528 128 199;R97 341,611 712,460 41,876,830
- 17. Gross Electrical Energy Generated (MTil)
- 18. Net Electrical Energy Generated (MTil) 324,804 677;767 10 7na,n19 100%
100%
74.35%
- 19. Unit Service Factor 100%
100%
74.36%
- 20. Unit Availability Factor 99.29%
100.14%
69.35%
- 21. Unit Capacity Factor (Using MDC Net) 99.29%
100,14%
69.35%
- 22. Unit Capacity Factor (Using DER Net) 0.00%
0.00%
7.90%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
?
March 3, 1984 - Annual Refueling and Maintenance - Approximately 65 days duration
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8403300001 840229 PDR ADOCK 05000244 R
a- '
AVERAGE DAILY UNIT POWER LEVEL CCCELT 1.0.
50-244 UNIT
$1, Cinna Station DATE Marsh 10,_
1984 CCMPLLTLD BY / ), L / C /_#c4 y
%dbert L.
Loc @
TELEPHONL 1 (315) 524-4446 Ext. 396 at Ginna MONTH February, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mie-Ne t)
(Mbe-Net) 1.
477 17.
476 2.
478 18.
475 3.
479 19.
301 4.
479 20.
472 5.
479 21.
474 6.
479 22.
428 7.
478 23.
476 8.
478 24.-
464 9.
480 25.
465 10, 479 26.
'464 11.
478 27.
463 12.
478 28.
462-136 478 29.
460 14.
478 30.
15.
477 31.
16~.
476 INSTRUCTIONS
~
On this format, list.the average daily : unit power level 'in hbe-Net for-cach day'in the rcrorting: month.
Ccrapute to the nearest whole mcgawatt.
Yg
q DOCKET NO.
50-244 UNIT NAME #bGiina Station UNIT SHUTDOWN AND POWER REDUCTIONS nATE *I9? We N COMPLETED 11Y [llMC 47g,
'Rdbert E. Dodge r REPORT MONTH February TELEPIIONE 1 (315) 524-4446
~
Ext. 396 at--G1nna n
IE Licensee a
Cause & Corrective Eq g
Event f,g Me.
De't.
g jg
}$j
!j L
Action to F-dE
[
R* Pert #
Au u
Prevent Reevrrence e
e o
z g
O PR*
2-18-84 F
5.4 IIRS A
N/A N/A SF ACCUMU Power Reduction due to S.I. Accumulat 3r Low Pressure PR*
2-22-84 F-3.1 HRS, A N/A N/A IIB PIPEXX Power Reduction due to 2B Reheater Steam Leak PR*
2-24-84 S
N/A C
N/A N/A Coastdown Commenced PR*
2-24-84 F
2 HRS.
A N/A N/A 1111 XXXXX Power Reduction due to Loss of l
A and B lleater Drain Tank Pumps 1
2 3
4 F: Forced Reason:
- Power Reduction Method:
Exhil;it G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training ac License Examination F-Administrative 5
E G-Operational Error (Explain) as-se inav. um H-Other (Explain)
Exhibit 1 - Same Source L.
_a_
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE LOCKET NO.
50-244 UNIT Cinna Staticn,Unital CATE I:p,.2;ch 10, 1984 CCl4PLETED BY p M / h Robert E. Eccg(
TELEFHCNE 1 (315) 524-4446 EXT. 396 at Ginna MONTH February, 1984 The reactor pcter level was niaintained at 1001 for the tajcrity of the report pericd, with the follcwing exceptions:
On 2/18, reactor pcker level reducticn was cenacnced to hot shutdekn as required by-Technien1 Specifications, due to S.I. Accumulator Low Pressure, the lcwest power achievcd was 30t.
The power level was
~
restored-to 100% cn 2/19 after S.I. Accumulator Vent Valve was secured and capped, and S.I.
Accetulater Pressure increaccd above Technical Specification requircments.
On 2/22, the rcactor power level was reduced'to ~ 68% due to 2B Echeater steam leak.
The power level was restored to 100% after repair of steam leak at 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br /> on 2/22.
~
On 2/24, at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> ccnnonced coastdcun operation.
On 2/24, at approximately 0830 the reactor power level was reduced to 85% due to loss of "A" and "B" Header Drain Tank Pumps. The pcwcr level was restored at approximately 1030.cn 2/24.
e.
.l
- l
- l
.M'.- ]
i Page 5 GINNA STATION Maintenance Ileport S umir,z.ry February, 1984 During the Ir.cnth of February, routine insl.cctions and n.ain-tent.nce were c cnil. l e t e d.
Also, preparations were underway for the shceduled 1984 Refueling Outage.
--y
~
,.a,
i
.i
"$;?pM
,,,.... 'f j = 3,
R-[$
f)
,5 j gggg
/(
^(7
_y_ ' y j _ =)
m1 bh?l 5 N
i+r m+
4 ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.146 9 e
TELEPwoNE A.E 4 CODE 716 546 2700 GIhEA STATION March 10, 1964 Director, Office of Management Inforr;ation and Prograra Analysis U.S. NUCLLAR REGULA'IOhY COMMISSICN bashington, EC 20555
Subject:
Monthly Report for February, 1984 Operating Status Inforr.ation R.
E. Ginna.Euclear Power Plant Unit No. 1 Locket No. 50-244 Ecar Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the conthly operating status report for Ginna Station for the n.onth of February, 1984 i f; e
Very truly yours, Br ce A. Snow Plant Superintendent
'EAS/clb Attachraents