ML20087M571

From kanterella
Jump to navigation Jump to search
Forwards Operating Shift Experience Tables.Util Does Not Plan to Use Shift Advisors
ML20087M571
Person / Time
Site: Beaver Valley
Issue date: 03/26/1984
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8403300062
Download: ML20087M571 (6)


Text

.

b 8.=

'Af Telephone (412) 3934000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 furch 26, 1984 Operating Shif t Experience Mr. Harold Denton, Director Office of Nuclear Reactor Reg.

U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

As a member of the utility group on operating shift experience for plants with flear Term Operating Licenses (NT0L), Duquesne Light Company forwards the attached experience tables relative to personnel at the Beaver Valley Power Station (BVPS).

This infomation is intended to provide the Conmissioners and Staff with a better understanding of our individual experience base and need for advisors.

Please note that for the purpose of this transmittal, no credit is shown for experience at the Shippingport Atomic Power Station.

Duquesne Light Company does not plan to use Shift Advisors unless some unforeseen circumstance arises, rather we would draw from the experience base indicated in the attachment to support the startup and operation of Beaver Valley Power Station, Unit No. 2.

If you have any questions relative to the attached experience tables, please contact Mr. T. D. Jones, Manager of Nuclear Operations Department.

Very truly yours, Attachments cc: Hugh Thompson, flRC Donald F. Schnell, Union Electric

\\Y

[MN OS A

lb

'l'

d OPERATING SHIFT EXPERIENCE (as of 3/15/84) iiarch 93. 1984 DATE PLANT NAME Beaver Valley Power Station JOB TITLE:

SHIFT SUPERVISOR UTILITY Ducuesne Light Comoany (Note 2)

Schedule for Unit 2:

12/1/85 Fuel load, 3/1/86 full power, 5/1/86 commercial o.L.oATE NUCLEAR POWER PLANT EXPERIENCE FOR ENTER DATA:

OPERATING SHIFT POSITIONS (Note 1)

MONTHS / MONTHS X WEIGHTING FACTOR WElGHTING MAXIMUM TYPE OF EXPERIENCE FACTOR CREDIT 1

2 3

4 5

6 7

8 9 to j

a. SAME TYPE CCMMERCIAL 5R0 1.00 NO LIMIT 35 1l1 58 60 97 1 l6 97ln i

2.

OTHER CCMMERCIAL $20 0.75 NO LIMIT l

l l

l l

3.

SAME TYPE CCmERCIAL RQ 1.00 NO LIMIT 33 L12 l

6.

OTHER CCM"ERCIAL A0 0.75 NO LIMIT l

l

'IAVY (MIL *TARY) NUCLEAR 35 MONTHS (R3. EWS, ECCW, PPWS) 0.50 (OTHER) 0.25 6.

SIMULATCR 12 MONTHS (REFER DCE PLANT) 5.00 (12 MONTHS)

(5:MILAR) 3.00 (9NONWS) 1 4

4 2

1 3 4 1

3 4 7.

NUCLDR PLANT EXPER!ENCE CN-SHIFT (CWN PLANT) 24 MONTHS (LESS THAN li YEARS PRIOR TO F.L.)

0.75 (12 MONTHS)

(NORE THAN 11 YEARS PRICR TO F.L.)

0.50 (12 MONTHS) 16 16 Q.

LIC DC ROOM TRAINING AND EIAM 0.50 9 MONTHS 5

9 9

9 5

9 9

p g

5 6

9.

PARTICIPATION AT CPERATING PLANT 0.75 12 MONTH 5 12 l

10. OTHER NUCLEAR PLANT EXPERIDCE 0.25 12 MONES g

l l

11. CCNDUCTING LICD5E TRAINING 0.25 9 MONTHS 7

l

13. CEGREE (DGINEERI!;G, APPLIE3 SCIDCI CR EQUIVALDT) 12 MONTHS (sACHELCR$ DEGREE)

(12 MONTHS) 12 12 12 12 (ASSOCIATES DEGREE)

(6 MONTH 5)

TOTAL NUCLEAR PLANT EXPERIDCE: [/if greater than 24 mos.]

66 10 22 114 101 125 10 l28 l125 10 HOT PARTICIPATION EXPERIENCE TLvE > 20: Pwn/ swr (wx5) [/if greater than 6 weeks]

/

4 4

/

/,

/

4

/

/

n STARTUP & SHUTCOWN (YES/NO)[/if on Shift for both]

/ ' N0 NO

/

/

/

NO

/

/

NO MNDS ON SHIFT [/if greater than 6 month 5]

/

1 l'

/

/

/

1 6

/

0 NOTE 1: SEE *INSTRUCTICNS FOR USE OF NUCLEAR POWER PLANT EXPERIDCE FACTORS FOR OPERATING 5HIFT POSITIONS (0L APPL! CANTS)*

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT $R0'5. REACTOR OPERATORS (RO) AND SHIFT TECHNICAL ADVISORS (STA).

CHECK ONE OF THE FOLLOWING:

O '

5^": **'i 5'r5

"$2 "' "5

" 5' 5s o'"f ine util i ty l

arti:1:ation ex:erience" re:utrement plan.

Q 3.

Shi*: asvissrs will orcea:1y te re::: ired, at least fer s me sr.ifts.

%:.Donotslantouseshiftacvissrs:.nlessscmeunforeseen cire'.mstance arises.

l t

l.

OPERATING SHIFT EXPERIENCE (as of 3/15/84) fiarch 23, 1984 DATE Beaver Valley Power Station JOB TITLE:

SENIOR OPERATOR PLANT NAME UTILITY Ducuesne Light Com0any (Note 2)

Schedule for Unit 2:

12/1/85 Fuel load, 3/1/86 full power, 5/1/86 commercial o,t,oxyg NUCLEAR POWER PLANT EXPERIENCE FOR suyan o474:

OPERATING SHIFT POSITIONS (Note 1)

MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING M AXIMUM TYPE OF EXPERIENCE FACTOR CREDIT 1

2 3

4 5

6 7

8 1.

SME TYPE CCMMERCIAL SRO 1.00 NO LIMIT 5

5l34l1 29 Y 1 5

o l

2.

OTHER CCMMERCIAL SRO 0.75 NO LIMIT l

l l

l 3.

SAME TYPE CCft'ERCIAL R0 1.00 NO LIMIT l

h2 l

4 OTHER COM"ERCIAL R0 0.75 NO LIMIT l

l S.

'tAVY (MILITARY) NUCLEAR 26 MONTHS (RO. EWS E00W. PPWS) 0.50 (OTHER) 0.25 1

6.

SIMULATCR 12 MONTHS (REFERDCE PLANT) 5.00 (12 MONTHS)

(5:MILAR) 3.00 (9 MONTHS) 1 1

5 4

7 4

1 2

7.

NUCLEAR PLANT EXPERIENCE ON-SHIFT (CWN PLMT) 24 NONTNS (LESS THAN 11 YEARS PRICR TO F.L.)

0.75 (12 MONTHS)

(MORE THM 11 YEARS PRIOR TO F.L.)

0.E0 (12 MONTHS) 8.

LICENSED CLASSRCOM TRAINING AND EIM 0.50 9 MONTHS (OWN ptANT) 9 9

8 5

9 5

9 9

9.

PARTICIPATICN AT OPERATING PLANT 0.75 12 MONTHS j

39

10. OTHER NUCLUR PLANT EXPERIDCE 0.25 12 MONES 3

12 12 4l2 l

11. CCNDUCTING LICDSE TRAINING 0.25 9 MONTHS 3

l l

12. CEGREE (ENGINEERING. APPLIE3 SC DCE OR EQUIVALDT) 12 MONTHS (SACHET 0RS DEGREE)

(12 MONTHS) 12 12 12 12 12 (A55CCIATES DEGREE)

(6 MONTH 5) 6 TOTAL NUCLUR PI. ANT EIPERIDCE: [ /if greater than 24 mos.]

30 39 59 l10 66 22l31h77 HOT PARTIC F nSK EXPERIENCE T:ME > 205 PWR/ SWR mm \\0 greater than 6 weeks]

/

/

/.

4 /.

4' /

0 STARTUP & SHUT 00WN QA

'f On Shift for both]

/

/

/-

R0

/

NO / lN0 mNTHS ON SHIFT [A f greater than 6 months]

/

/

/ l1

/

1; / l0 l

NOTE 1: SEE

  • INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"

NOTE 2: INCLUDE ALL SHIFT SUPERVITOP.S (55). SHIFT 5R0'5 REACTOR OPERATORS (RO) AND SHIFT TECHNICAL ID ISORS (STA).

CHECK ONE OF THE FOLl.OWING:

l O

  • 5"

'5"r5 "5

"5

" 5**'5 * '"' "":"

ar:1:1:atica ex:eaience" re:uirements of :*.e.utfitty plan.

O Sa'f: *= visors wit' are:*:i/ e' r==='r'd

  • 1**5:

f:r sc w sr.if:s.

% :. Oo not nian :s use snif:advisors unless sc=e unforeseen ciret.nstance arises.

e OPERATING SHIFT EXPERIENCE (as of 3/15/84) lia rch 23, 1984 DATE Beaver Valley Power Station JOB TITLE:

REACTOR OPERATOR PLANT NAME UTILITY Duquesne Light Company (Note 2)

Schedule for Unit 2:

12/1/85 Fuel load, 3/1/86 full power, 5/1/86 commercial 0.L.DATE i

NUCLEAR POWER PLANT EXPERIENCE FOR ENTER D ATA:

OPERATING SHIFT POSITIONS (Note 1)

MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM TYPE OF EXPERIENCE FACTO R CREDIT 1

2 3

4 5

6 7

8 9 10 l

l

  • l*

l ll 1.

SAME TYPE CCMMERC!AL SRO 1.00 NO LIMIT 2.

OTHER CCMMERCIAL SRO 0.75 NO LIMIT l

l l

l l

3.

SAME TYPE CCMMERCIAL R0 1.00 NO LIMIT 35 52l521 0i 0

6 6 l 6 l 6 l 50 4 OTHER COMMERCIAL R0 0.75 NO LIMIT l

l l

l S.

  • 1AVY (MILITARY) NUCLEAR 35 MONTHS (RO. E'i!. E00'4. PP'45) 0.50 (OTHER) 0.25 6.

SIMULATCR 12 MCNTHS (REFERDCE PLANT) 5.00 (12 mms) 1 2

2 1

1 1

1 1

1 1

(SIMILAR) 3.C0 (9 MONTHS) 7.

MUCLEAR PLANT EXPERIENCE CN-SHIFT (C'4N PLANT) 24 MONTHS (LESS THAN li YEARS PRIOR TO F.L.)

0.75 (12 MONTHS)

(MORE THAN 11 YEARS PRIOR TO F.L.)

0.50 (12 NONTHS) 8.

LICENSED CLASSROOM TRAINING AND EXAM 0.50 9 MONTHS (C'4N PLANT) 9 9

9 9

9 9

9 9

6 9

9.

PARTICIPATICN AT OPERATING PLANT 0.75 12 MONTHS 12 12 12 12 12 12 12 12 l 12 l 12 l

l

10. OTHER NUCLEAR PLANT EXPERIENCE 0.25 12 NONTHS
11. CCNDUCTING LICENSE TRAINING 0.25 9 MONTHS l

l l

l

12. CEGREE (DGINEERING, APPLIE3 SCIENCE OR EQUIVALDT) 12 MONTHS (BACHELORS OEGREE)

(12 MONTHS)

(ASSOCIATES DEGREE)

(6 MONTHS)

TOTAL NUCLEAR PLANT EXPERIDCE: [/if greater than 24 mos.]

/ l/

/

22 22 l/ l / l/ l/ l /

HOT PARTICIPATION EXPERIENCE O

TIME > 20: PwR/s'.R (wr.5) [/if greater than 6 weeks]

/

/

/,

o 0.

/

/

/

/

/

STARTUP & SHUTCOWN (YES/NO)[/if on Shift for both]

/

/

/

N0: NO

/

/l/

/ l/

mm5 CN SHIFT [/if greater than 6 months]

/

/

/

0 0

/

/ l/

/ l/

srb' NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR PC'4ER PLANT EXPERIDCE FACTORS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)*

9 pect to examine as NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55). SHIFT 5R0'5. REACTOR CPERATORS SR0 in 10/84 (RO) AND SHIFT *ECHNICAL ADVISORS (STA).

CHECK ONE OF THE FoiLOWING:

O '

5": **5

'5 "5: "5'* ** 5" $"* ""**

l

ar
1:1:stion ex:erience" re:uire ents of :ne-utility 31an.

~

Q 3.

Shi't aavissrs will orete:iy te es:uired, at less:

f:r s.ce sr.if:s.

2.

Oc not :lan t0 use shift sCviscrs *snless sCme unforeseen l

circ stance arises.

t OPERATING SHIFT EXPERIENCE (as of 3/15/84)

DATE March 23,1984 PLANT NAME Beaver Valley Power Station JOB TITLE:

REACTOR OPERATOR uTitlTY Duquesne Light Company (Note 2)

O.L.DATE Schedule for Unit 2:

12/1/85 Fuel load, 3/1/86 full power, 5/1/86 commercial

)

NUCLEAR POWER PLANT EXPERIENCE FOR ENTEn o ATA-OPERATING SHIFT POSITIONS (Note 1)

MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM TYPE OF EXPERIENCE FACTOR CREDIT 11 1; 13 14 15 16 17 18 19 20 1.

SANE TYPE CCMMERCIAL SRO 1.00 NO LIMIT l

l l

l l

2.

OTHER COMMERCIAL SRO 0.75 NO LIMIT l

l l

l l

3.

SANE TYPE COMMERCIAL R0 1.00 NO LIMIT 6

50l6 6

6 21 6 l 6 l65 l35 l

4 OTHER CCMMERCIAL RO 0.75 NO LIMIT l

l l

S.

'IAVY (MILITARY) NUCLEAR 36 MONTHS (RO. E'i$. ECCW. 7PWS) 0.50 (OThER) 0.25 6.

SIMULATCR 12 MCNTHS (REFERDCE PLANT) 5.00 (12 MONTH 5) 1 1

1 1

1 3

1 1

1 1

(SIMILAR) 3.C0 (9 MONTHS) 7.

NUCLEAR PLANT EXPERIENCE CN-SHIFT (CVN PLANT) 24 MONTHS (LESS THAN 16 YEARS PRICR TO r.t.)

0.75 (12 MONTHS)

(NORE THAN 16 YEARS PRICR TO F.L.)

0.50 (12 MONTHS) 8.

LICg5jDgR00MTRAININGANDEXAM g

  • g 7

g g

g g

g g

g 0.50 9 MONTHS 9.

PARTICIPATICN AT OPERATING PLANT 0.75 12 MONTHS 12 12 12 12-12 12 12l12l12l12

10. OTHER NUCLEAR PLANT EXPERIENCE 0.25 12 MONTHS 2l l

l

11. CCNCUCTING LICENSE TRAINING 0.25 9 MONTHS l
12. CEGREE (ENGINEERING. APPLIED SCIENCE CR EQUIVALENT) 12 MONTHS 12 (SACHELCRS DEGREE)

(12 MONTHS)

(ASSOCIATES DEGREI)

(6 MONTH 5) 6 TOTAL NUCLEAR PLANT EXPERIENCE: [ /if greater than 24 mos.]l /l/l / l'/- /

/

/ l/ l/

/

l HOT PARTICIPATION EXPERIENCE TI.mE > 2c: PWR/B'mR (WKS) [/if greater than 6 weeks]

/

/ /.

/

/,

/

/

/

/

/

STARTUP & 5 HUT ll0WN (YES/NO)[/if on shift for both]

/

/

/

/

/

/

/l/

/l/'

l xxTH5 cN SH!rt [/if greater than 6 months]

/

/

/

/l/

/

/ l/

/ l/

MOTE 1: SEE

  • INSTRUCTIONS FCR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTCRS FOR OPERATING SHIFT POSITIONS (OL APPLICANTS)"

NOTE 2: INCLUDE ALL SHIFT SUPERVISCRS (55). SHIFT 520'5. REACTOR CPERATORS (RO) AND SHIFT TECHNICAL ADVISCRS (STA).

CHECK ONE OF THE FOLLOWING:

O

  • 5"$': ***'5'r5 "5: :' "5 := 5*:'' :"' "h::
aa:ict:ation ex:erience" re:uirements of :,e.uttitty Dian.

]

3.

Shift a visars will cr te:ly te re:uired. 4: less:

f:r 50 2 sr.if:s.

. :o not Dian to use shift advis:rs unless sc=e unforeseen

=trewestance arises.

t OPERATING SHIFT EXPERIENCE (as of 3/15/84) ox75 March 23,1984 PLANT NAME Beaver Valley Power Station JOB TITLE: REACTOR OPERATOR UTILITY Ouquesne Light Comoany (Note 2) 0.L. D ATE Schedule for Unit 2:

12/1/85 Fuel load 3/1/86 full p0wer, 5/1/86 commercial NUCLEAR POWER PLANT EXPERIENCE FOR ENTER D ATA:

OPERATING SHIFT POSITIONS (Note 1)

MONTHS / MONTHS X WEIGHTING FACTOR WEIGHTING MAXIMUM I

TYPE OF EXPERIENCE FACTOR CREDIT 21 22 23 24 2s 26 1.

SAME TYPE COMMERCIAL SRO 1.00 NO LIMIT g l pl 0 l1 l1 l

l 2.

O'HER CCS ERCIAL SRO 0.75 NO LIMIT l

l l

l l

l 3.

SANE TYPE CCm ERCIAL R0 1.00 NO LIMIT 5 i l

4 OTHER COMPERCIAL RO 0.75 NO LIMIT l

E.

NAVY (MILITARY) NUCLEAR 36 MONTH 5 (RO. E'is. ECCW. PPWS) 0.50 (OTHER) 0.25 6.

SIFULATCR 12 MCNTHS (REFERENCE PLANT) 5.00 (12 MONTHS) 1 4

4 4

4 4

(SIMILAR) 3.C0 (9 NONTH5) 7.

NUCLEAR PLANT EXPERIENCE CN-SHIFT (CWN PLANT) 24 MONTHS (LESS THAN 11 YEARS PRIOR TO F.L.)

0.75 (12 MONTHS)

(NORE THAM 11 YEARS PR!CR TO F.L.)

0.50 (12 MONTH 5) 8.

LICENSED CLASSROCM TRAINING AND EIAM 0.50 9 MONTHS (CWN PLANT) 8 6

6 6

5 5

9.

PARTICIPATICN AT OPERATING PLANT 0.75 12 MONTHS 12 l

l l

l l

l

10. OTHER NUCLEAR PLANT EIPERIENCE 0.25 12 NONTHS
11. CCNDUCTING LICENSE TRAINING 0.25 9 MONTH 5 l

l l

13. CEGREE (ENGINEERING. APPLIED SCIENCE OR EQUIVALENT) 12 MONTH 5 (SACHELORS DEGREE)

(12 MONTHS)

(ASSOCIATES DEGREE)

(6 MONTHS)

TOTAL NUCLEAR PLANT EXPERIENCE: [./if greater than 24 mos.]l / l 10 10 10 10 10 l

l l

HOT PARTICIPATION EXPERIENCE TIMr > 20: PWR/ SWR (wx5) [/if greater than 6 weeks]

/

0 0

0 4

4 START'.'P & SHUTCOWN (YES/NO)[/if on Shift for both]

/

NO NOlN0 NO N0 mm5 cN SHIFT [/if greater than 6 months]

/

0 0 l 0l 1 1

l f

NOTE 1: SEE *!NSTRUCTIONS FOR USE OF MUCLEAR Pt74ER PLANT EIPERIENCE FACTORS FCR OPERATING SHIFT POSITIONS (OL APPLICANTS)*

NOTE 2: INCLUDE ALL SHIFT SUPERVISCRS (55). SHIFT SRO'5. REACTOR CFERATORS (RO) AND SHIFT TECHNICAL ADVISORS (STA).

One month obtain-CHECK ONE OF THE FOLLOWING:

ing on-shift ex-perience, use of O '

5"' ': ' 5*'5 ""5

' "5 2' 5'" "' 2"' "":*

IiC8"Se P8"di"9

=ar:t:i:atten en:erience" re: trerer.:s of :.e. u: tit:y medical Consid-

'I'"'

erations Q 3.

Shift a vissrs will orc:a:iy be re: tred. at leas:

f:r s:me sr.ifts.

. llc not slan : use shift acvisors unless sc e unfoetseen
te:' es:ance arises.

--