__ _
DOCKET NO. 50-397 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME WNP-2 I) ATE 3/08/24 COMPLETED BY K. D. Cowan REPORT MONTH February 1984 TELEPilONE (509)377-2501 Ext. 4736 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (IM)URS)
REASON (1)
REDUCING POWER (2F CORRECTIVE ACTIONS / COMMENTS 840123 S
696.0 B
1 Continuation of Shutdown.
t
SUMMARY
Plant remained in cold shutdown.for performance of various tests associated with Plant Preoperational Test Program and maintenance.
8403300056 840229 PDR ADOCK 05000397 R
pg (1)
REASON E: OPERATOR TRAINING AND (2)
METiloD A: EQUIPMENT FAILURE (EXPLAINI LICENSE EXAMINATION I: MANUAL B: MAINT.OR TEST F: ADMINIS1RATIVE 2: M ant!A1. SCR AM.
C: REFUELING G: OPI RATIONAL FRROR (EXPLAIN) 3: AtilOMATICSCRAM D: REGULATORY RESTRICrlON 11: OralER (EXPLAINI 4: Oilli:R (EXPLAIN)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT hlNP-2 DATE 3/08/84 COMPLETED BY K. D. Cowan TELEPHONE (509)377-2501 Ext. 47.5b MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
0 37 2
0 13 3
0 3,
0 4
0 0
20 5
0 21 0
8 0
0 22 7
0 23 0
8 0
0 24 0
g 25 0
to 0
26 0
11 0
27 0
12 0
2s 0
13 0
29 0
14 0
30 15 0
31 16 0
INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacityis used for the net electrical rating of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explam the apparent anomaly.
s OPERATING DATA REPORT 50-397 DOCKET NO.
UNIT WNP-2 DATE 3/08/84 K. D. Cowan COMPLETED BY TELEPHONE (509)377-2501 Ext. 4736 OPERATING STATUS February 1984 GMosS hours IN REPORTING PERIOO:
0
- 1. REPORTING PERIOD:
I66 MAX. DEPEND. CAPACITY (MWe Net):
1100
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
DESIGN ELECTRICAL RATING (MWo Net):
1100
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): 5% Gross W
- 4. REASONS FOR RESTRICTION (IF ANY): Initial Plant Startup and Power Ascension Test Phase and License Limitation.
THIS MONTH YR TO DATE CUMULATIVE 0
13.93 13.93
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS...................
0 0
0
- 7. HOURS GENERATOR ON LINE......
O 0
0
- 8. UNIT RESERVE 1HUTDOWN HOURS 0
0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 0 0
0
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)........
0 0
0
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
N/A N/A N/A
- 12. R EACTOR SE RVICE FACTOR...........................
N/A N/A N/A
- 13. REACTOR AVAILABILITY F ACTOR......................
N/A N/A N/A
- 14. UNIT SERVICE F ACTOR..............................
M/A N/A N/A
- 15. UNIT AVAILA81UTY F ACTOR,.........................
N/A N/A N/A
- 16. UNIT CAPACITY FACTOR (Using MDC)
N/A N/A N/A
- 17. UNIT CAPACITY FACTOR (Using Design MWel.................
N/A N/A N/A
- 18. UNIT FORCED OUTAGE RATE..........................
l
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACHl: 3/29/84 to 4/3/84, 4/25/84 to 4/27/84, and 5/11/84 to 5/21/84; all for maintenance during pOuer
- 20. IF SHUT DOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP:
ascension phase.
- 21. UNITS IN TEST STATUS IPRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED I/lb/04 I/l9/84 INITIAL CRITICALITY 5/1/84 INITIAL ELECTRICITY -
7/I/04 COMMERCIAL OPERATION
- WNP-2 s...,m e-.
,ww
~.
o O'
Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-397 March 8, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Subject:
NUCLEAR PROJECT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications.
V truly your
/ ). Maetin (927M)
WNP-2 Plant Manager JDM:de Enclosure cc:
Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site M1 l
\\
t