Monthly Operating Rept for Feb 1984
ML20087M565
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1984
From: Cowan K, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
NUDOCS 8403300056
Download: ML20087M565 (4)


Text

__ _ _ - - _

DOCKET NO. 50-397 -

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME WNP-2 I) ATE 3/08/24 COMPLETED BY K. D. Cowan REPORT MONTH February 1984 TELEPilONE (509)377-2501  !

Ext. 4736 METHOD OF

, TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (IM)URS) REASON (1) REDUCING POWER (2F CORRECTIVE ACTIONS / COMMENTS 840123 S 696.0 B 1 Continuation of Shutdown.

t

SUMMARY

Plant remained in cold shutdown.for performance of various tests associated with Plant Preoperational Test Program and maintenance.

8403300056 840229 .

PDR R ADOCK 05000397 pg (1) REASON E: OPERATOR TRAINING AND (2) METiloD A: EQUIPMENT FAILURE (EXPLAINI LICENSE EXAMINATION I: MANUAL B: MAINT.OR TEST F: ADMINIS1RATIVE 2: M ant!A1. SCR AM.

C: REFUELING G: OPI RATIONAL FRROR (EXPLAIN) 3: AtilOMATICSCRAM D: REGULATORY RESTRICrlON 11: OralER (EXPLAINI 4: Oilli:R (EXPLAIN)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT hlNP-2 DATE 3/08/84 COMPLETED BY K. D. Cowan TELEPHONE (509)377-2501 Ext. 47.5b MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 0 37 2 0 13 3 0 3, 0 4 0 0 20 5 0 21 0 8 0 0 22 7 0 0 23 8 0 0 24 g 0 25 0 to 0 26 0 11 0 0 27 12 0 2s 0 13 0 29 0 14 0 30 15 -

0 31 16 0 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacityis used for the net electrical rating of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explam the apparent anomaly.

s

  • OPERATING DATA REPORT DOCKET NO. 50-397 UNIT WNP-2 DATE 3/08/84 COMPLETED BY K. D. Cowan TELEPHONE (509)377-2501 Ext. 4736 OPERATING STATUS
1. REPORTING PERIOD:

February 1984 GMosS hours IN REPORTING PERIOO: 0

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): I66 MAX. DEPEND. CAPACITY (MWe Net): 1100 DESIGN ELECTRICAL RATING (MWo Net): 1100
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): 5% Gross W
4. REASONS FOR RESTRICTION (IF ANY): Initial Plant Startup and Power Ascension Test Phase and License Limitation. THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL ...............

0 13.93 13.93

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . . . . . . . . . . . . .

0 0 0

7. HOURS GENERATOR ON LINE . . . . . . ...................

0 0 0

8. UNIT RESERVE 1HUTDOWN HOURS ......................

O _

0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) .... .........

0 0 0

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . . . ....

0 0 0

11. NET ELECTRICAL ENERGY GENERATED (MWH) ..............

0 0 0

12. R EACTOR SE RVICE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
13. REACTOR AVAILABILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
14. UNIT SERVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
15. UNIT AVAILA81UTY F ACTOR , . . . . . . . . . . . . . . . . . . . . . . . . . M/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC) ................. ...

N/A N/A N/A

17. UNIT CAPACITY FACTOR (Using Design MWel . . . . . . . . . . . . . . . . . N/A N/A N/A
18. UNIT FORCED OUTAGE RATE . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACHl: 3/29/84 to 4/3/84, 4/25/84 to 4/27/84, and 5/11/84 to 5/21/84; all for maintenance during pOuer
20. IF SHUT DOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP: ascension phase.
  • 21. UNITS IN TEST STATUS IPRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY I/lb/04 I/l9/84 INITIAL ELECTRICITY - 5/1/84 COMMERCIAL OPERATION 7/I/04
  • WNP-2

o O'

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-397 March 8, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PROJECT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications.

V truly your

/ ). Maetin (927M)

WNP-2 Plant Manager JDM:de Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site M1 \