DOCKET NO. 50-397 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME WNP-2 I) ATE 3/08/24 COMPLETED BY K. D. Cowan REPORT MONTH February 1984 TELEPilONE (509)377-2501 Ext. 4736 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (IM)URS)

REASON (1)

REDUCING POWER (2F CORRECTIVE ACTIONS / COMMENTS 840123 S

696.0 B

1 Continuation of Shutdown.

t

SUMMARY

Plant remained in cold shutdown.for performance of various tests associated with Plant Preoperational Test Program and maintenance.

8403300056 840229 PDR ADOCK 05000397 R

pg (1)

REASON E: OPERATOR TRAINING AND (2)

METiloD A: EQUIPMENT FAILURE (EXPLAINI LICENSE EXAMINATION I: MANUAL B: MAINT.OR TEST F: ADMINIS1RATIVE 2: M ant!A1. SCR AM.

C: REFUELING G: OPI RATIONAL FRROR (EXPLAIN) 3: AtilOMATICSCRAM D: REGULATORY RESTRICrlON 11: OralER (EXPLAINI 4: Oilli:R (EXPLAIN)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT hlNP-2 DATE 3/08/84 COMPLETED BY K. D. Cowan TELEPHONE (509)377-2501 Ext. 47.5b MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

0 37 2

0 13 3

0 3,

0 4

0 0

20 5

0 21 0

8 0

0 22 7

0 23 0

8 0

0 24 0

g 25 0

to 0

26 0

11 0

27 0

12 0

2s 0

13 0

29 0

14 0

30 15 0

31 16 0

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacityis used for the net electrical rating of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explam the apparent anomaly.

s OPERATING DATA REPORT 50-397 DOCKET NO.

UNIT WNP-2 DATE 3/08/84 K. D. Cowan COMPLETED BY TELEPHONE (509)377-2501 Ext. 4736 OPERATING STATUS February 1984 GMosS hours IN REPORTING PERIOO:

0

1. REPORTING PERIOD:

I66 MAX. DEPEND. CAPACITY (MWe Net):

1100

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

DESIGN ELECTRICAL RATING (MWo Net):

1100

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): 5% Gross W
4. REASONS FOR RESTRICTION (IF ANY): Initial Plant Startup and Power Ascension Test Phase and License Limitation.

THIS MONTH YR TO DATE CUMULATIVE 0

13.93 13.93

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 0

6. REACTOR RESERVE SHUTDOWN HOURS...................

0 0

0

7. HOURS GENERATOR ON LINE......

O 0

0

8. UNIT RESERVE 1HUTDOWN HOURS 0

0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) 0 0

0

10. GROSS ELECTRICAL ENERGY GENERATED (MWH)........

0 0

0

11. NET ELECTRICAL ENERGY GENERATED (MWH)

N/A N/A N/A

12. R EACTOR SE RVICE FACTOR...........................

N/A N/A N/A

13. REACTOR AVAILABILITY F ACTOR......................

N/A N/A N/A

14. UNIT SERVICE F ACTOR..............................

M/A N/A N/A

15. UNIT AVAILA81UTY F ACTOR,.........................

N/A N/A N/A

16. UNIT CAPACITY FACTOR (Using MDC)

N/A N/A N/A

17. UNIT CAPACITY FACTOR (Using Design MWel.................

N/A N/A N/A

18. UNIT FORCED OUTAGE RATE..........................

l

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACHl: 3/29/84 to 4/3/84, 4/25/84 to 4/27/84, and 5/11/84 to 5/21/84; all for maintenance during pOuer
20. IF SHUT DOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP:

ascension phase.

  • 21. UNITS IN TEST STATUS IPRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED I/lb/04 I/l9/84 INITIAL CRITICALITY 5/1/84 INITIAL ELECTRICITY -

7/I/04 COMMERCIAL OPERATION

  • WNP-2 s...,m e-.

,ww

~.

o O'

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-397 March 8, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

NUCLEAR PROJECT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report as required by our Technical Specifications.

V truly your

/ ). Maetin (927M)

WNP-2 Plant Manager JDM:de Enclosure cc:

Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site M1 l

\\

t