Georgia Power Company, f
333 Pedmont Avenue Atlanta. Georgla 30308 Telephone 404 5266526 Maihng AddressE Post off te Box 4545 Atlanta. Georgia 30302 Georgia Power 84 MAR 8 P 2 36 L T. Gucwa Manager Nuclear Engineenng and Cruef Nuclear Engineer NED-84-094 March 1, 1984 U. S. Nuclear Regulatory Conunission
REFERENCE:
Office of Inspection and Enforcenent RII: JPO Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW Inspection Report Atlanta, Georgia 30303 84-03 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:
Georgia Power Canpany (GPC) hereby provides the following information in response to the violation cited in NRC I&E Inspection Report Nos.
50-321/84-03 and 50-366/84-03 dated February 10, 1984.
7 tie violation applied only to Hatch Unit 1 and was cited as a result of the NRC inspection conducted on January 24-27, 1984 by Mr. B. R. Crowley of your office.
VIOLATION Technical Specification 6.8.1.c requires that procedures be implenented for surveillance of safety-related equipnent.
Paragraph XIII.c of INT Ur procedure 17r-2, requires that the circumferential reactor vessel. welds, ultrasonic scans be recorded relative to a zero point.
l Contrary to the above, on January 25, 1984, the ultrasonic inspection records for the " Fall.1982" inspection of ' reactor vessel flange to shell weld C-1 did not show the extent or location of the area inspected.
4 his is a Severity I4 vel V (sic) (Supplement I).
HESPONSE i
Mmission or denial of alleged violation: %e violation occurred as stated.
1 r
Reason 'for violation:
%e technician recording the data unintentienally anitted the information.
It should be ' noted that this was an isolated anission in a large anount of nondestructive exanination (NDE) data, and not a breakdown in procedural controls.
4 l
i.
B403290212 840319 PDR ADOCK 05000321 i
G l
PDR.
~,
-.. _,,. _ _ _,... ~,.. -
l Geotgia Power d U. S. Nuclear Regulatory Comtission Office of Inspection and Enforcenent Region II - Suite 2900 March 1, 1984 Page 'No RESPONSE (Continued)
Corrective action that has been taken and results achieved:
After notification of the violation, appropriate NDE personnel were reninded of the importance of proper and emplete data recording.
Corrective steps that will be taken to avoid further violations:
On Deceber 29, 1983, Southern Cm pany Services procedure 17r-H-410 was implenented to cover the same scope of exminations as IMT procedure 17r-2.
'Ihe data sheet for this new procedure has more specific areas for recording the location of the scans.
Date when full empliance will be achieved:
GPC is attenpting to locate correlating information (i.e., insulation renoved in the area in question) that would substantiate performance of the exmination.
If such evidence cannot be found, the examination area will be inspected prior to startup fran the next Hatch Unit 1 refueling outage.
Should you have any questions in this regard, please contact this office.