f
- 2...
[~%j,.
i :' '
S UNITED STATES A
EL NUCLEAR REGULATORY COMMISSION k....,/ '
' WASHINGTON. D.C. 20* Nm01 4
I GULF STATES UTILITIES COMPANY **
l i
CAJUN ELECTRIC POWER COOPERATIVE AND-ENTERGY OPERATIONS. INC.
DOCKET NO. 50-456-RIVER BEND STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 80 l
License No. NPF-47 1.
The Nuclear Regulatory Commission'(the Commission) has found that:
]
i A.
The application for amendment by Gulf States Utilities * (the licensee) dated February 22, 1994, complies with the~ standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in' 10 CFR Chapter I; B.
The facility will-operate in conformity with the: application,:as.
amended, the provisions.of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i)-that'the activities authorized by this amendment can be conducted without endangering'the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; a
D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E01 is authorized to act as agent for Gulf States Utilities Company, which has been authorized to act as agent for Cajun Electric Power Cooperative, and i
has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
- Gulf States Utilities Company, which owns a 70 percent undivided interest in River Bend, has merged with a wholly owned subsidiary of Entergy Corporation.
Lulf States Utilities Company was the surviving company in the merger.
9506300231 950619 ADOCK0500g8 DR
. E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and a'il applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachmen_t to this license amendment; and Paragraph 2.C.(2) of Facility Operating License No. NPF-47 is hereby amended to read as follows:
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 80 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
E01 shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f
l i
.f,'
David L. Wig n or., Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of huclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 19, 1995 4
~.
i J
ATTACHMENT TO LICENSE AMENDMENT NO. 80 FACILITY OPERATING LICENSE NO. NPF-47 DOCKET NO. 50-458 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change. The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 6-10 3/4 6-10 3/4 6-16 3/4 6-16 I
1 l
l am
w L
CONTAINMENT SYSTEMS MAIN STEAM-POSITIVE LEAKAGE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.5 Two independent main steam positive leakage control system (MS-PLCS) divisions shall be OPERABLE.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION:
a.
With one MS-PLCS division inoperable, restore the inoperable division to l
OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With both MS-PLCS divisions inoperable, restore one division to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SURVEILLANCE RE0VIREMENTS
.4.6.1.5 Each MS-PLCS division shall be demonstrated OPERABLE:
a.
By performing Surveillance Requirement 4.6.1.10.a.
b.
At least once per 31 days by verifying compressor OPERABILITY by operating the compressor loaded for at least 15 minutes.
c.
During each COLD SHUTDOWN, if not performed within the previous 92 days, by cycling each motor-operated valve, including the Main Steam Shutoff Valves (MSSV), through at least one complete cycle of full travel, d.
At least once per 18 months by performance of a functional test, which includes simulated actuation of the division throughout its operating sequence, and verifying that each automatic valve actuates'to its correct position and that 8.5
- 3 psid sealing pressure is established in each steam line.
e.
By verifying the operating instrumentation to be OPERABLE by performance of a:
1.
CHANNEL FUNCTIONAL TEST at least once per 31 days, and 2.
CHANNEL CALIBRATION at least once per 18 months.
RIVER BEND - UNIT 1 3/4 6-10 Amendment No. 80
4 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i 4.6.1.9.3 At least once per 92 days, each 36-inch primary containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the nicasured leakage rate is in accor-dance with the limits in Specification 3.6.1.3.d when pressurized to Pa, 7.6 psig, for each purge supply valve, and is less than or equal to 0.01 La when pressurized to Pa for each purge exhaust valve.
l
(
l i
i RIVER BEND - UNIT 1 3/4 6-15
)
p 1
q q
, CONTAINMENT SYSTEMS PENETRATION VALVE-LEAKAGE CONTROL SYSTEM
' LIMITING CONDITION FOR OPERATION 3.6.1.10 Two independent penetration valve leakage control system (PVLCS)
- divisions shall be OPERABLE.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
- a..
With one PVLCS division inoperable, restore ~the inoperable division to.
l OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With both PVLC: 4:: ions inoperable, restore one division to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12-hours and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE RE0VIREMENTS l
4.6.1.10 Each PVLCS division shall be demonstrated OPERABLE:
l I
a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying division PVLCS accumulator pressure greater than or equal to 101 psig.
b.
During each COLD SHUTDOWN, if not performed within the previous j
92 days, by cycling each motor-operated valve through at least one complete cycle of full travel.
c.
At least once per 18* months by performance of a functional test 1
which includes simulated actuation of the system throughout its operating sequence, and verifying that each automatic valve actuates to its correct position and that a sealing pressure i
greater than or equal to 22 psig is established in each sealing i
valve.
i d.
By verifying the operating instrumentation to be OPERABLE by performance of a:
i 1.
CHANNEL FUNCTIONAL TEST at least once per 31 days, and I
2.
CHANNEL CALIBRATION at least once per 18 months.
1
- This frequency may be extended to coincide with the refueling outage for the first cycle, scheduled to begin 9-15-87.
RIVER BEND UNIT 1 3/4 6-16 Amendment No. M780
..-...