Text

.

u Ro8ERT E. DF.NTON Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant.

)

l^ g.

Nuclear Energy 1650 Calvert Cliffs Parkway j

Lusby, Maryland 20657 h

410 586-2200 Ext.44551ocal j

410 260-4455 Baltimore 1

l August 18,1995 I

U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk l

\\

SUBJECT:

Calvert Cliffs Nuclear Power Plant

.i Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318

'1 Integrated Plant Assessment Methodoloev f

REFERENCE:

(a)

Letter from Mr. D. M. Crutchfield, (NRC) to Mr. R. E. Denton (BGE),

dated March 21,1994, " Draft Safety Evaluation Report Concerning the Baltimore Gas and Electric Company Report Entitled ' Integrated Plant p

Assessment Methodology Volume 1: Systems, Structures and Components Screening'"

j b

The Integrated Plant Assessment Methodology (Attachment 1) is submitted for review and approval to I

meet the requirement of 10 CFR 54.21(a)(2). It is the description and justification of our method to comply I

with 10 CFR 54.21(a)(1). Reference (a) contained six open and confirmatory items that have been incorporated in the Integrated Plant Assessment Methodology.

l Attachment (2) contains sample results which are fonvarded to support your review and approval of l

Attachment (1). We believe these sample results represent an acceptable level of detail and are formatted l

consistently with industry proposals to date. We request that you limit your review to format and level of detail only.

j Should you have questions regarding this matter, we will be pleased to discuss them with you.

ly yours,

~J l

\\

L' 3W

-n csLUvJ-RED /JMOldlm 1

Attachments:

(1)

CCNPP Integrated Plant Assessment Methodology g0 (2) 10 CFR Part 54 Sample Results

\\

\\\\

9508240146 950818 DR ADOCK 03000337 PDR i

)

L _ _-_- _ _ _ ______ - _-__ - -

D=>- Control Desk

,19 h August 18,1995 Page 2 cc:

(With Attachments)

S. F. Newberry, NRC.

S. A. Reynolds, NRC 4

(Without Attachments)

D. A. Brune, Esquire J. E. Silberg, Esquire L. B.' Marsh,'NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR J. H. Walter, PSC i

-l I

i i

I l

j

>