Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
__ -
g ,,
Cnrus.Es II. C Use Baltimore Gas and Electric Company i Plant General Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Calvert Cliifs Nuclear Power Plant Lusby, Maryland 20657 410 586-2200 Ext.4101 Local 410 260-4101 Baltimore August 15,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant
. Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 July 1995 Operatina Data Reports l
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
~
p CHC/IlOO/bjd Attachments cc: D. A. Brune, Esquire R. A. Ilartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR L. B. Marsh, NRC J. H. Walter, PSC D. G. Mcdonald, Jr., NRC P. Lewis, INPO T. T. Martin, NRC K. N. Larson, ANI P. R. Wilson, NRC i1
-nn n .
9508230267 DR 950731 ADOCK 0500o327 PDR I.gI . . . . _ . . . . . . , .. . . . , . .
DOCKET h'O. 50-317 ,
CALVERT CLIFFS - UNIT I August 15,1995
SUMMARY
OF OPERATING EXPERIENCE July 1995 The unit began the month at 100% power (835 MWe).
A power reduction commenced at 1416 on 07/31/95 due to high circulating water temperatures. Power -
was reduced to approximately 55% (410 MWe) to insure adequate heat removal by the Service Water System.
The unit remained at 55% power (410 MWe) through the end of the month while investigating the abnormally high circulating water temperatures.
i i
l l
l l
l
~ '
UNIT S11UTDOWNS AND POWER REDUCTIONS DOCKET NO. ~ 50-317 '
UNIT NAME Cahrrt Cliffs-UI -.
DATE August 15.1995 COMPLETED BY Herman O. Olsen TELEPHONE (410) 260-6734 REPORT MONTil July 1995 j ME1110D OF l .
j SlitJITING ' LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM CohTONENT ACTION TO NO- DATE TYPEI (IIOURS) REASON 2 REACTOR 3 . REPORT # CODE 4 CODES PREVENT RECURRENCE 95002 ; 073195 F 9.7 H 5 317/95-003 BI HX On 07/31/95 at 1416 power was reduced to
{ approximately 55% due to high circulating nter temperature. This reduction was required to insure
{
- j adequate heat removal could be performed by the Senice Water System. An investigation is on-going to determine the actions required to maintain saltwater inlet temperature below the maximum temperature
- allowed for Senice Water Sptem operability. The unit ,
remained at approximately 55% through tic end of the 'I month.
{
1 F: Forced 2 Reason. 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test . 2 - Mamal Semrn -
C - Refueling 3 - Automatic Scram. 5 =IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Trammg & License Examination Reduced Load F - Administrative 9 - Other G - Operational Error H - Other i
_ . _ _ _ _ _ ..____.-._.m_,--_-_ .___...._.m...m-_.____.___m_ _. ..___._..__.________m__..___._m__ _ _ ______.____.-___m_ . _ _ _ . _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ m.____.--_______m_ ___w__m_- - -w- rw-. m__ - _ m
w n
oc***********$**************************************************************
UNIT: 1 OPERATING DATA REPORT cc**************************************************************************
August 15, 1995 Prepared by Herman'O.-Olsen Telephone:(410)260-6734 e OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING' PERIOD JULY 1995
- 3. LICENSED THERMAL POWER (MWT) 2700 ;
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL _ RATING (NET MWe) 845
.6. MAXIMUM DEPENDABLE-CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
.8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER: LEVEL TO WHICH RESTRICTED N/A .
. :UD . REASONS FOR RESTRICTIONS N/A l Year- Cumulative This month to-Date. to Date ,
-11. HOURS IN REPORTING PERIOD 744 5,087 177,348
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,981.4 127,862.1 :
- 13. REACTOR RESERVE SHUTDOWN HOURS .
0.0 0.0 3,019.4 ;
- 14. HOURS GENERATOR ON LINE 744.0 4,970.0 125,206.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 -
- US . GROSS THERMAL ENERGY GENERATED (MWH) 1,995,187 13,308,637 318,476,530~
- 17. GROSS ELECTRICAL ENERGY' GEN'TED(MWH) 643,150 4,405,895 105,776,511
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 616,280 4,225,832 100,720,100
- 19. UNIT SERVICE FACTOR 100.0 97.7 70.6
- 20. UNIT AVAILABILITY FACTOR 100.0 97.7 70.6 >
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.2 99.5 68.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.0 98.3 67.2
- 23. UNIT FORCED OUTAGE RATE 0.0 2.3 8.6
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, '
ESTIMATED DATE OF START-UP:
N/A
l"lY' - ' '
a.
l I
-a. A'VERAGE DAILY UNIT POWER LEVEL -
oc**********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No.-1 !
August 15, 1995 H
~
Prepared by Herman O. Olsen Telephone: (410)-260-6734 JULY 1995 -
Average Daily Power Level Average Daily Power' Level' .
Day (MWe-Net) Day (MWe-Net) 1 842 17 832 2 839 18 830 l 3 840 19 828 4 840 20 830 ,
t 5 839 21 830 ,
6 841 22 830 7 23 839 831 8 837 24 827
10 836 26 830 !
11 836 27 829 12 836 -28 830 i
13 836 29 829 .!
14 836 30 824 .
15 835 31 670 16 833 1
t f
i I
i e
1
>1 a
[. -
L August 15,1995 NFM 95-214 Page 2 of 3,.
- i. REFUEL,1NG INFORM ATION REOUEST
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
- 2. Scheduled date for next refueling shutdown: March 1,1996
- 3. Scheduled date for restart following refueling: April 19,1996
- i' 4. Will refueling or resumption of operatica thereafter require a Technical Specification change or other license amendment?
Yes.
- a. License amer Jment to reflect the new electrical distribution system configuration.
- b. An amendment and exemption to allow the use of four lead fuel assemblies with advance cladding material.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- a. August 1995*
- b. July 13,1995*
- 6. Important licensing considerations associated with the refueling.
Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.
- 7. He number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1434 (Note 2)
Spent fuel pools are common to Units I and 2.
- 8. (a) De present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1) (b) 0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2: 240 Spent Fuel Assemblies in the ISFSI.
- Entry has changed since last reported.
P LG -t
]
l
-oc**************************************************************************
, UNIT 2 OPERATING DATA REPORT--
cce*************************************************************************
Docket No. 50-318 ,
August-15, 1995 Prepared by Herman O. Olsen Telephone:(410)260-6734 P
OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2 l
~2. REPORTING PERIOD JULY 1995
- 3. LICENSED THERMAL POWER (MWT) 2700 ;
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date .
____________________________________ l
- 11. HOURS IN REPORTING PERIOD 744 5,087 160,703
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,532.8 117,569.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 730.4 3,449.7 115,900.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
'16. GROSS THERMAL ENERGY GENERATED (MWH) 1,924,812 9,037,940 296,534,869
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 616,036 2,972,787 97,988,096 i
- 18. NET ELECTRICAL ENERGY-GENERATED (MWH) 589,598 2,835,625 93,657,235 !
- 19. UNIT SERVICE FACTOR 98.2 67.8 72.1
- 20. UNIT AVAILABILITY FACTOR 98.2 67.8 72.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 94.3 66.4 70.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.8 66.0 69.0
- 23. UNIT FORCED OUTAGE RATE 1.8 5.1 5.8-
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, I ESTIMATED DATE OF START-UP:
N/A i
,e ,.
t >
r
- - AhERAGE DAILY ~ UNIT POWER LEVEL
- oo********************************************************************** '
Docket No. 50-318 '
'Calvert Cliffs Unit No. 2' August- 15, 1995 Prepared by Herman O. Olsen Telephone: (410) 260-6734
' JULY 1995
-Average Daily Power Level Average' Daily Power Level'
. Day Day (MWe-Net) (MWe-Net) ,
1 836 17 827 2 832 18 825 I 3 832 19 826 ;
4 831 20 827 '
5 829 21 826 6 832 22 825 r i
7 832 23' 824 I 8 724 24 317 i 9 791 25 396 ;
10 832 26 818 l i
11 831 27 821 :!
12 830 28 822 13 831 29 824 f 14 831 30 820 15 830 31 817 16 828 ,
l l
i i
_ _J
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-318
~
UNIT NAME ' Cahert Clifts-U2 ;
DATE August 15.1995 COMPLETED BY Herman O. Olsen TELEPHONE (410) 260 6734
~
REPORT MONTil July 1995 1
METilOD OF .
SIRTITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO NO. DA1E TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 95-007 950724 F 1.5 A 5 N/A AA Z1 Commenced reducing power on 07/24/95 at 0000 to repair CEA #8 secondary position indication.
95-G S 950724 F 37.7 A 5 N/A TG FCV Power uns reduced to approximately 60% whe.n the .
Main Turbine governor vahr GV-2 failed to respond during the down power. Power ums reduced to 10Y. and the unit uns remond from the grid at 1545 to conduct repairs. Completed repairs to GV-2 and CEA #8 i
secondary position indication and paralleled to the grid on 7/25/95 at 0522.
1 F: Forced 2 Reason. 3 Method. 4 IEEE Standard 805-1984 '
S: Scheduled A- Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Cor mued E - Operator Training & License Examination 5 - Retuced load F - Administrative 9 - Cr.her G - Operational Error H - Other
_ _ _ - . _ _ - _ _ __ -. -_ _ --___-_ _ _-___ --_=_ ____- ______--_- - _________- - - - _ _ - - _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ - - _ - _ - _ - _ _ _ - _ _
g;;; - - - - - - ~ -- - ' - - ' - - ---
- = - -
c.x -
1
.=
'DOCKETNO 50-318
- CALVERT CLIFFS - UNIT 2 August 15,1995 b
SUMMARY
OF OPERATING EXPERIENCE '
~ July 1995
. The unit began the month at 100% power (835 MWe). On 07/08/95 at 0400 power was reduced to 85%
- for waterbox cleaning. Power was returned to 100% on 07/09/95 at 1221.
On 07/24/95 at 0000 a power reduction to 30% was being perforrned to repair control element assembly.
(CEA) #8 secondary position indication. At approximately 60% the Main Turbine governor valve GV-2 was identified as not responding correctly during the down power. Trouble shooting identified that repairs to GV-2 would require removal from the grid. The power was reduced to 10% and the unit was removed from the grid at 1545. Repairs were completed and the unit was paralleled to the grid on 07/25/95 at 0522.
Power was restored to 100% on 07/26/95 at 0200 The unit ended the month at 100% power (820 MWe).
l
___ _ - - _ _ - - _ _ i
-,; r:; a
- K.{~C j August 15,1995 -
- NFM 95-214 i Page 3 of 3,. -
REFUELING INFORMATION REOUEST !
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
- 2. Scheduled date for next refueling shutdown: March 1,1997 ,
- 3. Scheduled date for restart following refueling: April 9,1997
- j 4 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment? j i
No. ;
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
None. -
- 6. Important licensing considerations associated with the refueling. ;
None. q
- 7. He number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. ,
5 (a) 217 (b) 1434 (Note 2)
Spent fuel pools are common to Units I and 2. ,
- 8. (a) He present licensed spent fuel pool storage capacity, and (b) the size of any mercase m licensed storage capacity that has been requested or is planned, in number of fuel assemblies. .
(a) 4710 (Note 1) (b) 0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load. ;
March 2007 NOTE 1: 4710 total licensed site storage capacity. .',
(1830 pool + 2880 ISFSI) l NOTE 2: 240 Spent Fuel Assemblies in the ISFSt.
Entry has changed rince last reported. .
i f