ML20087K348
| ML20087K348 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/17/1995 |
| From: | Lamberski J GEORGIA POWER CO., TROUTMANSANDERS (FORMERLY TROUTMAN, SANDERS, LOCKERMA |
| To: | AFFILIATION NOT ASSIGNED |
| References | |
| CON-#395-17012 93-671-01-OLA-3, 93-671-1-OLA-3, OLA-3, NUDOCS 9508230224 | |
| Download: ML20087K348 (11) | |
Text
~
^
pf
.y..
- .? /799 M CORRESPONDENCE UNITED STATES OF AMERICA i
i NUCLEAR REGULATORY COMMISSION
% ALG 21 A10:06 i
me me Am -, w a y a i ic - ing m =ed 0FFICE OF SECRETARY -
00CKETmG & SERVICE i
BRANCH l
)
la the Mauer of
)
Docket Nos. 50-424-OLA-3
)
5(M25-OLA-3 GEORGIA POWER COMPANY, )
l etal.
)
Re: License Amendment
)
(Fransfer to Southern l
(Vogtle Electric Generating
)
Nuclear)
Plant, Units 1 and 2)
).
)
ASLBP No. 93-671-01-OLA-3 h
GEOROIA POWER COMPANY'S FIRST SUPPLEMENTAL RESPONSE TO INTRRVENOR'S FIFTH INTpannGATORY AND DOCIIMENT BFnUEST
?
Georgia Power Company ("GPC") hereby supplements its Pv-to latervenor's Pifth laserrogatory and Document Request, dated July 22,1994 (the " Georgia Power's
% to Intervenor's FiRh Request"). Specifically, this response supplements Georgia i
Power's pnor response to laterrogatory No. 7. This supplemental response iiudim all of the objections rained in the prwr response.
Georgia Power's response to laterrogatory No. 7 stated that "Mr. Kochery recalls that i
3 eamanae may have told him that water was discovered in the 2" air start line, but does not
.i recall who told him." Georgia Power's Response to latervenor's Fifth Request at 4. Upon 1
review of his deposnion at the suggestion of the Board (Tr. 10544-45), Mr. Kochery
[
decennined that his response to intervenor's questions was partially incorrect. While Mr.
Kochery correctly stated that he was not swere of liquid commg from trip lines, he i
1
)
9508230224 950817 ~
f ADOCK 05000424 47 PDR O
E
'A incorrectly stated that liquid was discovered in an air start line. The event he was recalling was the discovery of water in the diesel combustion air intake line located below the diesel engine intercooler. Sec Corrected Deposition of Paul Kochery dated July 6,1994 at Tr. 38-39.
PWly subnutted, M
/
ahfes E. Jdiner John Lamberski TROUTMAN SANDERS Suite 5200 600 Peachtree Street, N.E.
Arlarum, GA 30308-2216 (404) 885-3360 Ernest L. Blake David R. Lewis SHAW, Pr1TMAN, POTTS & TROWBRIDGE 2300 N Street, N.W.
Washington, D.C. 20337 (202) 663-8084 I
Counsel for Cargia Power Company Dated:
August 17, 1995 2
1 OOPY l
~ "
f 1
UNITED STATES OF AMERICA i
NUCLEAR REGULATORY COMMISSION 2
ATOMIC SAFETY AND LICENSING BOARD 3
IN THE MATTER OF:
)
4 GEORGIA POWER CO.,
et al.
)
5 (Vogtle Electric' Generating Plant, Unit 1-and Unit 2) 6 i
Docket Nos.: 50-424-OLA-3 i
7 50-425-OLA-3 8
Re License Amendment (Transfer to Southern Nuclear) 9 ASLBP No.: 93-671-01-OLA-3 10 11 12 13 14 15 DEPOSITION OF 16 PAUL KOCBERY 17 18 19 l
20 1
21 I
22 23 BULL & ASSOCIATES, INC.
COURT AND DEPOSITION REPORTERS 24 4651 Roswell Road, N.R.,
Suite F-504 Atlanta, Georgia 30342 2.5 (404) 256-2886 I
-37 1
A Yes.
2 Q
How did you resolve them?
3 A
Doing proper calibration and
\\MQ:t ic a met hods.
L--
4 calibration methods and the 12:n_
5 Q
And after you did the proper i
6 calibration, didn't the diesel trip again?
MeGDob 7
A After corrected-ir.eul.il-i., it didn't 8
trip.
tywL00mit.
9 0
After correct incul-+ien did you say?
10 Y e s', not using the 11 w
By the time your critique report had 12 came out, you had already known about the pipe 13 dough, right?
14 A
I believe so.
15 Q.
Your report, the finalized report, 16 o n sis out on May 24th, correct?
17 A
Yes.
May 24,
'90, yes.
18 Q
Well, didn't the calcons fail that operat(er?
There was a problem L
19 day or fail to 20 with the diesel on that v.ory day?
21 A
That particular day?
2.2 Q.
Yes.
23 A
I don't see any reason why.
24 Q
Were you aware there was a problem on 25 the 23rd, May 23rd?
i 1
BULL & ASSOCIATES, INC.
38
.F.
C 1
A' I. don't recollect this.
$*2 Q
Were you aware that the diesel
-[
3 tripped or experienced similar problems that j'
4 occurred during'the side area emergency at-soma
[ cA 5
point after April of 19907 l
6-A similar problem?
j
- d 7
.Q..
Yes.
l
.[ 8 A
There is no similar problem.
9 Q.
Do you remember seeing a jar'with h.s 10 some fluid'in it in your office?
A 11 A
No.
d 12 Q.
Do you remember seeing any. container Da 13 with fluid in it that someone brought in your 14 office?
d 3
l is a
No, I don't remember.
$ d 16-Q.
Specifically do you remember Mr.:
F l 17 Burr, Mr. Stokes or Mr. Chenault talking to you
,3 18 about or leaving a container with fluid in it in l
f 19 your office?
2 0 A
No.
a! "y 21 Q
Were you aware.of liquid coming out
'I 22 of the trip lines?
>d$g 23 A
No.
I remember it coming from the 24 K-air start line', not the trip line.
3:
25
.Q.
What is the air start line?
d 0
'.4-h BULL & ASSOCIATES, INC.
39
)
l
?
Ee i
1:
A Two inch big line, air line.:
q 2
QL And what do you remember about it?
)
3 What.line or.when was it collected?
4 30 The line to drain.it.
5
.Q.
Can you tell me when?-
6 A.
Sometime during the time, I believe.
i 7
Q During the time of the c'ritique Team 7_
8 A
I don't think it was during the l
J 9
Critique Team time.
Sometime 10 Q
Maybe after, just after the Critique 1
-11 Team?
12 A
could be, yes.
I don't remember the 13 time frame.
i 14 Q
But you're talking about before the 15 summer of 19907 16 A
Maybe after.
I don't know.
17 Q
Do you think that occurred more than 18 one time?
19 A
I was aware of only that one time.
i 20 Could be more than one tim'.s 21 Q
And can you tell me how much fluid 22 came out?
23 A
Not exactly.
A little bit, you know.
24 Q
Excuse me?
25 A
Half an ounce or something like that.
BULL & ASSOCIATES, INC.
l
~_
~
40 l'
Q And.can you tell me which diesel?
2 A-No.
3 Q
Were you present when this occurred-4 or did you hear about it?
5 A
I heard about it.
6 Q.
By whom did you hear about it?
7 A
What did you say?
8 Q
Who did you-hear it from?
t I don't know exactly.
Maybe 9
A From O
10 pperationSpersonnel.
j 11 Q
Do you recall a description of the l
12 fluid whether it was clear or colored or 1.3 something?
14 A
It was clear.
15 Q-Was there any discussion how the 16 fluid got in there?
i 1~7 A
No.
18 Q
Does it refresh your recollection 19 whether this occurred during the time that they 20 were having problems with the air start' valves?
21 A
No.
I don't recollect exactly what i
22 time period was it.
23 Q
Can you tell me who if anyone you 24 passed this information on to?
25 A
Who passed the information to me?
i
?
i BULL & ASSOCIATES, INC.
i
i 1
41 1
1 Q
Well, I think you indicated it was a
]
O 2
technician, right, or pperations people.
3 A
I think it was from /perations I 4-heard.
5 Q.
Do you remember who you passed that 6
information on to?
7 A
I.didn't pass that information to 8
anybody.
I just heard when they were talking 9
about it.
1 10 Q
Was anyone else present when you were J
11 having the discussion?
12 A
I don't know.
13 Q.
There may have been more people 14 present?
15 A
Yes.
16 Q
Prior to testifying today is there 17 anyone else that you discussed this matter with7 18 A
This 19 Q
About the fluid that came out of that 20 line?
21 A
I didn't discuss it to anybody 22 specifically.
23 Q
Did anybody ask you about it between 24 that day and today?
25 A
No.
i BULL & ASSOCIATES, INC.
UNITED STATES OF AMERICA NUCLEAR REGULMORY CosetISSION BEFORE 11tE ATOAiIC SAFETY AMD LICEMSING BOASp In the Mattar of Docket Nos. 50-424-OLA-3 GEORGIA POWER COMPANY, 31; 31 50-425-OLA-3 i
ll Re: License Amendment (Vogtle Electric Generating Plant, :
(Transfer to Units 1 and 2)
Southern Nuclear)
ASLBP MO. 91-671-OLA-3 AFFIDAVIT OF PAUL M.
EDCHERY l
I, Paul M. Kochery, belng duly sJorn, state as follows:
i.
1.
I am currently employed by Georgia Power Company as Engineering Supervisor, Vogtle Electric Generating Plant.
2.
I an duly authorized to verify Georgia Power Company's First Supplemental Response to Intervenor's Fifth Interrogatory and Document Request.
I hereby certify that the statements and opinions in such response are true and correct to the best of my personal knowledge and beliar.
--f. e
, n
~
aul M. Kochery Sworn to and subscribed before me this
/6 4 day o
gust, 1995.
& b.ht! - N N
y Public M
maission =xpi f:
a J,
i in n, (3
/
l
)
.4 DOCKETED UNITED STATES OF AMERICA' USNRC NUCLEAR REGULATORY COMMISSION ALE 21 A!0:07 bfore the Atomic hfev mari 1 icencina Rrurd
)
0FFICE OF SECRETARY In the Matter of
)
Docket Nos. 50-424-OLA-3 00CKETING & SERVICE
)
50-425-OLA-3 BRANCH GEORGIA POWER COMPANY, )
etal.
)
Re: License Arnendment
)
(Transfer to Southern (Vogtle Electric Generating
)
Nuclear)
Plant, Units 1 and 2)
)
)
ASLBP No. 93-671-01-OLA-3 CERTIFICATE OF SERVICE I hereby certify that copies of Georgia Power Company's First Supplemental Response to Intervenor's Fifth Request for Interrogatories, dated August 17, 1995, were served either by handeivery upon the persons marked with an asterisk or by first class mail upon the other persons on the attached service list this 17th day of August,1995.
7 c
}
John 12m6erski
~
TROUTMAN SANDERS Suite 5200 600 Peachtree 5treet, N.E.
l Atlanta, GA 30308-2216 (404) 885-3360
,=
UNITED STATES OF AMERICA
~ NUCLEAR REGULATORY COMMISSION Refore the Atomie Refety and Licerseino Board In the Matter of
.)
Dodet Nos. 50-424-OLA-3
)
50-425-OLA-3 GEORGIA POWER COMPANY
)
etal.
)
Re: License Amendment
)
- (Transfer to Southem Nuclear)
Vogtle Electric Generating Plant,
)
l Units I and 2)
)
ASLBP No. 93 671-01-OLA-3 SERVICE LIST Administrative Judge Peter B. Bloch*
Stewart D. Ebneter Chairman, Atomic Safety and Licensing Board Regional Administrator U.S. Nuclear Regulatory Ccmmission USNRC, Region 11 Two White Flint North 101 Manetta Street, N.W.
~
I1545 Rockville Pike Suite 2900 Rockville, MD 20852 Atlanta, GA 30303 Administrative Judge James H. CeW Office of the Secretary Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Two White Flint North ATTN: Docketmg & Services Branch.
I 11545 Rockville Pike Washington, DC 20555 Rockville, MD 20852 Administrative Judge Jarnes H. C.W.
Charles Barth, Esq.*
Atomic Safety and Licensing Board Mitzi Young, Esq.=
933 Green Point Drive Office of General Counsel Oyster Point U.S. Nuclear Regulatory Commission Sunset Beach, NC. 28468 One White Flint North Stop 15B18 Washington, DC 20555 Adsunistrative Judge Thomas D. Murphy
- Atomic Safety and Licensing Board Director, Environmental U.S. Nuclear Regulatory Commission Protection Division Two White Flint North Dwbusst of Natural Resources 11545 Rockville Pike Suite 1252 Rockville, MD 20852 205 Butler Street, S.E.
Atlanta, GA 30334 Michael D. Kohn, Esq.*
Omce of Commimmion Appellate Kohn, Kohn & Colapato, P.C.
Adjudication 517 Florida Avenue, N.W.
One White Flint North Washington, DC 20001 11555 Rockville Pike Rockville, MD 20852
.