Dtn0 THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O. Box 5000 CLD' ELAND. OHIO 44131 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLiC SQUARE Sen:ng The Best Location in the Nation March 15,1984 PRINCIPAL STAFF /
MURRAY P EDELMAN NM.'
//#3/l4 r%*#
vice muotNr NUCLE A R A
ORMSF 0
Mr. James G. Keppler RC URMA Regional Administrator, Region III
?AO SCS Office of Inspection and Enforcement
)GA ML fj U.S. Nuclear Regulatory Commission
. dF File 1ff/g 799 Roosevelt Road Glen Ellyn, 1111noia 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Use of Non-Class 1E Control Power and Control Components in Diesel Generator Building Ventilation Systems [RDC 80(83)]
Dear Mr. Keppler:
Our letter to you dated Decerber 15, 1983, stated that final field rewiring for diesel generator building ventilation start signals was expected to be completed by March 2, 1984.
Vendor supplied drawings necessary for issuance of the Engineering Change Notice to transfer this start signal to a safety-related circuit that contains only safety-related components were delayed. The Engineering Change Notice necessary to provide the design modification for initiating ~ the start signal from a diesel generator control panel is expected on site by April 6,1984.
We now anticipate completion of final field rewiring by May 15, 1984.
- incerely,
[
Murr,2.. a ay R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office ch$
g*L Director o
Office of Inspection sud Enforcement
.h U.S. Nuclear Regulatory Commission i
O Washington, D.C.
20555 e:ic
@8
' U.S. ~ Nuclear Regulatory Commission
' '3 A c/o Document Management Branch
[
Washington, D.C.
20555
/g
/
4'\\
?5 CDE 4 Records Center, SEE-IN NMk j Q jgg4 Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
.