ML20087J251

From kanterella
Jump to navigation Jump to search
Forwards Revs & Updates to Physical Security Plan.Encls Withheld (Ref 10CFR2.790(d))
ML20087J251
Person / Time
Site: Oregon State University
Issue date: 08/14/1995
From: Dodd B
Oregon State University, CORVALLIS, OR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508210013
Download: ML20087J251 (2)


Text

I' a RADIATloN CENTER a aeu

==

OREGON STATE UsrvEas:Tv ,h 1

Ra&ation Center A100. Cervalha, Oregon 97331-5903 Telephone 503-737-2341 Fax 503-7374480 August 14,1995 l

l U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Revisions and Updates to the Oregon State University TRIGA Reactor (OSTR) l Physical Security Plan Submitted Under the Provisions of 10 CFR 50.54(p);  ;

License No. R-106, Docket No. 50-243. )

l Gentlemen ,

Oregon State University wishes to submit revisions and updates to the OSTR Physical Security l Plan in accordance with the provisions of 10 CFR 50.54(p). The modifications are very minor I and merely update the plan to take account of some equipment upgrades.

In keeping with the instructions in USNRC generic letters 84-18 and 82-39, specific information regarding the security plan and the 10 CFR 50.54(p) changes is included as a l separate enclosure (Enclosure 1) to this letter. Additionally, a page replacement guide and the packet of replacement pages to be inserted into the current OSTR Physical Security Plan are included as Enclosure 2. All new pages have a revision date of August 1995, and the changes on each page are indicated by a vertical line in the right margin.

All changes and updates to the plan have been reviewed by the OSTR physical security staff i and approved by the Reactor Operations Committee. It was concluded by both groups that the safeguards effectiveness of the OSTR physical security program is not reduced by adoption of the changes. On the contrary,it is our position that the OSTR physical security i program will be improved by incorporation of the current revisions.

If there are questions regarding the information we have submitted, please let me know. In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, and in accordance with any other applicable parts of the NRC's r 0 1 WHEN SPEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS k,l I' DECONTROLLED

(

QFEENN 9s082100t3 PDR 9s0e1 [ "

ADOCK 0s000243 jp@M3N F PDR

9 U.S. Nuclear Regulatory Commission Page 2 Q

u. [f '

{

August 10,1995 1 regulations, we hereby request that Enclosure 1 and Enclosure 2, and this letter when it is

- attached to either or both of these enclosures, be withheld from public disclosure.

Thank you for your consideration of these matters.

, ours sincerely,

/

4l w

Brian Dodd, Ph.D.

Director

Enclosures:

2 cc: Regional Administrator, Region IV, USNRC (1 copy w/ enclosures)

Oregon Department of Energy, Attn: David Stewart-Smith (1 copy w/o enclosures)

Donella Lucero, Manager Security Services (1 copy w/ enclosures)

S. E. Binney, Chairman, Reactor Operations Committee (w/o enclosures)

J. F. Higginbotham, Reactor Administrator (w/o enclosures)

A. D. Hall, Reactor Supervisor (w/ enclosures) i Q

gpg@

WHEN SPEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED

_ _ _ _ _ _ _ _ _