O PS G Company Pubhc Serwce E!ectricand Gas 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation March 5,.1984 Director of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20014 Attention:
Mr. Albert Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:
HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FSAR COMMITMENT STATUS THROUGH FEBRUARY 1984 Public Service Electric and Gas Company presently does not plan to issue Amendrhent No. 5 to the Hope Creek Generating
-Station Final Safety Analysis Report before April 1984 Accordingly, this letter is provided to document the status of Hope Creek Generating Station responses to NRC requests for additional information which were forecasted to be responded to by February 1984.
Attached is a tabulation of the Hope Creek Generating Stat' ion Final Safety Analysis Report commitments for
-rebruary 1984 and the corresponding resolution for each commitment.
Should you have any questions in this regard, do not hesitate to contact us.
Very tr ly yours h/
/
/
Attachment - Hope Creek Generating Station FSAR Commitment Status through February 1984 C
D.
H.
Wagner (w/ attach.)
USNRC Licensing Project Manager m
8403210036 840305 PDR ADOCK 05000354
/
A PM
/
The Energy People 95 4312 WM) 7 83
b v
Pago 1 of 3 L:
ATTACHMENT HOPE CREEK GENERATING STATION FSAR COMMITMENT STATUS THROUGH FEBRUARY 1984 FSAR COMMITMENT LOCATION COMMITMENT RESOLUTION 1.
Question and These commitments concern Response Appendix:
submittal of the HCGS plant a.
Question 100.1 unique analysis report.
This b.
Question 220.13 report was submitted to NRC via c.
Question'480.3 letter from R. L. Mittl, PSE&G, to A.
Schwencer, NRC, dated February 10, 1984.
These question responses will be revised in the next amendment to reflect this submittal.
2.
FSAR Table l.3-8, Page These commitments concern 1 of 8, and FSAR submittal of the HCGS plant Appendix 3B unique analysis report.
This report was submitted to NRC via letter from R. L. Mittl, PSE&G, to A.
Schwencer, NRC, dated February 10, 1984.
These FSAR sections will be revised in the next amendment to reflect this submittal.
3.
Question and Response These commitments concern Appendix:
submittal of 4,nformation at the a.
Question 220.3 time of the HCGS structural b.
Question 220.12 audit.
The structural audit was conducted January 10-12, 1984, at which time this information was discussed.
These question responses will be revised in the next amendment to include the information discussed at the structural audit.
m,
r"
,. +.
N 3~
n.
LPage 2 of'3
- D m
L
..e.
-ATTACHMENT 1 HOPE' CREEK GENERATING STATION l
m 2FSAR.' COMMITMENT STATUS THROUGH FEBRUARY 1984
-[FSAR COMMITMENT.
' LOCATION COMMITMENT RESOLUTION
[4.;LOuestion;and: Response This. commitment concerns veri-Appendix:'.
Lfication of spent fuel rack
~
-Question 220.16
'conformance with subsection NF requirements, and identifica-2 tion of; deviations, if any, based onza purchase-order issu-ance in December 1983.
The re-sults',of thefreview to verify.
conformance'to subsection NF 1
and to identify any deviations will be provided in the next-
,(
amendment.
. 5L: Ouestion and Response
.This. conmitment... concerns per-JAppendix:-
formance:of an analysis 1to
. ~
6 0uestion :220.22 determine the ultimate. capacity
~
of the:containnent.
This analysis-has!been performed and 7;; -
'the resultsiwi-ll'be' included in A-
.the.next' amendment.
6..
-Ouestion and:: Response.
=ThisEcommitment concerns the
~
(Appendix:
~.
1 schedule;for. submittal of'FSAR:
jouestion 280.1-Table 9A-1, " Fire Hazard Analy-
_ 1
' s i s' S u m m a r y "'. - Table 9A-1 was submit'ted in Amendment No. 4 to g2 the HCGS FSAR on February 6, il984; however,-Ouestion 280.1 was not. revised 1to-reflect this
-+
- su bm i t ta l.. This; question will.
'be revised in the next' amend-
~
ment to reference the completed
~
Table 9A-1.
v w
2 6
t I
4 4
4 3
l
_____,_____1_,_______,___..___________________________
r
~
4
- ^ ;' '
b^
a;
{. ~
~
~ '
' Paga 3 of 3 v.
. ATTACHMENT'
- HOPE CREEK GENERATING-STATION FSAR-COMMITMENT STATUS THROUGH FEBRUARY 1984-1 FSAR COMMITMENT LOCATION' COMMITMENT RESOLUTION
-T e. commitment although not in h
- 7.
FSAR-Section-response to an NRC request for.
1.14.1.37.2
-additional information, con-cerns setpoints for the under -
voltage relays, and system
' voltages at various buses for
~
various operating conditions.
HCGS is currently establishing the setpoints for the under-voltage relays based on'the completed system voltage stud-ies.
These setpoints along with.the' system voltages will be provided in September 1984.
4 DJD:mw AD0211/5-l2/5/83 e