|
---|
Category:ANNUAL OPERATING REPORT
MONTHYEARML20141F9481986-03-17017 March 1986 Annual Operating Rept for 850301-860301 ML20154R4901986-03-17017 March 1986 Annual Rept of Tests & Experiments for 850301-860301 ML20115F6081985-03-0101 March 1985 Annual Operating rept,840301-850301 ML20115B5321985-03-0101 March 1985 Annual Rept of Tests & Experiments,820301-830301 ML20087K4121984-03-0101 March 1984 Annual Operating Rept,Mar 1983 - Mar 1984 ML20072N1201983-03-0101 March 1983 Annual Operating Rept Mar 1982 - Mar 1983 ML20072F9891983-03-0101 March 1983 Submits Annual Rept of Tests & Experiments,Mar 1982 - Feb 1983 ML20087H0681983-02-28028 February 1983 Annual Rept of Tests & Experiments,Mar 1982 - Feb 1983 1986-03-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18059A8751994-03-0303 March 1994 LER 94-003-00:on 940203,position Switches for Containment Air Cooler Svc Inlet & Valves Not Qualified for Submergence. Caused by Master Equipment List Which Did Not Alert User of Existence of Qualification restrictions.W/940303 Ltr ML18059A6811994-02-10010 February 1994 LER 93-013-01:on 930427,loss of Onsite AC Power Due to Both Emergency Diesel Generator Simutanously Inoperable.Caused by Electrical Distribution Grid.Corrective Actions:Electrical Section revised.W/940210 Ltr ML20077R6821991-08-0808 August 1991 Paper Entitled, State Point Experiments for Tight Lattice of 4.81 W/O Enriched UO2 Fuel Pins, to Be Presented at ANS Meeting in San Francisco,Ca ML20077M2941991-08-0707 August 1991 Suppls Ro:On 910731,safety Sys Component Failed Due to Excessive Wear to Brass Gears.Limit Switch Will Be Added to Rack That Raises Rod & Rod Drop Surveillance Check Procedure & Daily pre-start Check Procedures Will Be Modified ML20077K0991991-08-0101 August 1991 Ro:On 910731,control Rod Withdrew Beyond Upper Lattice Plate & Failed to Insert Upon Scram.Caused by Improper Alignment of Control Rod Position Indicator & Limit Switch Drive Train.Realigned Drive Train.No Damage to Equipment ML20073P8361991-04-30030 April 1991 Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20238A6361987-08-31031 August 1987 Safety Evaluation Supporting Amend 8 to License CX-22 ML20235N8331987-07-0707 July 1987 Safety Evaluation Supporting Conversion Order to Convert from High Enriched to Low Enriched U Fuel for License CX-22 ML20206Q5681987-04-30030 April 1987 Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf) ML20212N3981987-03-0303 March 1987 Design Basis Transient Analyses for Low Power Research Reactors ML20212N4021987-03-0303 March 1987 Difxy,Fortran Code for Solution of Multi-Energy Group Diffusion Equations in X-Y Geometry ML20214R9901986-12-0101 December 1986 Safety Evaluation Supporting Amend 6 to License CX-22 ML20215C1671986-06-30030 June 1986 Critical Facility Safety Analysis Rept ML20141F9481986-03-17017 March 1986 Annual Operating Rept for 850301-860301 ML20154R4901986-03-17017 March 1986 Annual Rept of Tests & Experiments for 850301-860301 ML20115B5321985-03-0101 March 1985 Annual Rept of Tests & Experiments,820301-830301 ML20115F6081985-03-0101 March 1985 Annual Operating rept,840301-850301 ML20087K4121984-03-0101 March 1984 Annual Operating Rept,Mar 1983 - Mar 1984 ML20072N1201983-03-0101 March 1983 Annual Operating Rept Mar 1982 - Mar 1983 ML20072F9891983-03-0101 March 1983 Submits Annual Rept of Tests & Experiments,Mar 1982 - Feb 1983 ML20087H0681983-02-28028 February 1983 Annual Rept of Tests & Experiments,Mar 1982 - Feb 1983 ML20070P1661983-01-21021 January 1983 Rensselaer Polytechnic Inst Critical Facility Sar ML19350C4631981-02-14014 February 1981 Ro:During pre-startup Check,Moderator Dump Valve Solenoid Failed.Attempt to Energize Solenoid for Moderator Fill Unsuccessful.Cause Not Stated.Component Repaired & Reinstalled 1994-03-03
[Table view] |
Text
o '. Department cf Nuclear Engineering I
&% l I
Rensselaer Polytechnic Institute Troy, New York 12181 March 1, 1984 Director Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20545 Re: Rensselaer Polytechnic Institute Facility License CX-22 Docket 50-225 Annual Report of Tests and Experiments
Dear Sir:
This report of tests and experiments is submitted, in accordance with Title 10 of the Code of Federal Regulations Part 50.59, for the period March 1, 1982 to March 1, 1983.
The fuel plates used comprised a core loading of 152 MTR type, flat, stationary plated and 24 MTR type flat, control rod plates. One stationary plate is stored in the fuel vault. All of the fuel plates are leased by the U. S. Depart-ment of Energy under Contract DE-AC02-76ER03457.
Through periods January 1, 1982 to May 1982 and May 1982 to July 1982, the Facility was used to conduct a graduate level course on reactor experiments for classes of 15 and 7 students, respectively. The Facility was also used for 2 weeks in July and August for an operational reactor physics and engineering course for 3 engineers from Rochester Cas and Electric Company. Further, two students were in project work at the Facility to satisfy degree requirements.
The reactor experiments course is currently being taught.to 15 studants.
Routine scheduled maintenance was performed in June, January and February.
One Master's project was completed during the report period. This project raa-sured sensitivity to bubble voids in the center cell and measured transport times. _
The experiments, operations, and topics covered in association with the use of the Facility remain the same as described .in previous reports.
W l 8403200:29 830228 L l PDR ADOCK 05000225 8 0
R PDR i.
, Director l
Page 2 March 1, 1984 All activities and experiments have been conducted in accordance with our NRC reactor License CX-22. Our activities did not involve any unreviewed safet>
questions. CX-22 was relicensed on December 2, 1983, for a twenty-year period.
The Technical Specifications were modified. The maximum allowable excess reac-tivity is now .60$. Safety Evaluation Report (NUREG-1023) issued October, 1983 related to the renewal.
Sincerely yours, Dr. Frank Wicks, Supervisor r. Donald R. Ilarris Director d
RPI Critical Experiments Facility RPI Critical Experiments Facility L. David Walthousen Laboratory L. David Walthousen Laboratory FW:mb l cc: R. T. Lahey, Jr.
R. E. Scammell i ,
1 s
I
% __- 2.~-_ . . ._ls - . -