Forwards Schedule for Implementation of Activities for Control of Heavy Loads,Per NRC Requests Re NUREG-0612.Cask Pit Gate Listing Lugs Will Be Modified by 841015
ML20087G686
Person / Time
Site: Crane 
Issue date: 03/15/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 5211-84-2072, NUDOCS 8403200099
Download: ML20087G686 (3)


Text

.

I GPU Nuclear Corporation i

g gf Post Office Box 480 Route 441 South Middletown, Pennsylvarila 17057 0191 717 944 7621

)

TELEX 84 2386 i

Writer's Direct Dial Number:

1 March 15, 1984 5211-84-2072 Office of Nuclear Reactor Regulation Attn:

D. G. Eisenhut Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Three Mile Ialand Nuclear Station Unit I, (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Control of IIcavy Loads The enclosure to this letter outlinas the GPUN schedule for implementation of activities for Control of l'eavy Lt ds at TMI-1.

This list identifies activities addressed by GPUN 1r. response to NRC requests concerning NUREG 0612.

(See CPUN submittal 5211-84-2013, February 21, 1984).

Sincerely, o

[i.D.Iluhill, Director, TMI-1 IIDll: RAS :mle Attachments cc:

R. Conte J. Van Vlier (033

't 8,403200099 840315 W ADOCK 05000289 F

PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

e CPUN Schedule for Implementation for TMI-l Activities on " Control of IIcavy Loads" l

ITEM DESCRIPTION STATUS I

la Issue revised Procedure 1507 Polar Operation Sept. 15 lb Issue revised Procedure 1507 Fuel llandling Building Sept. 15 Crane Operation 2

Issue revised Procedure MP-1406 - Crane Operator Qualifi-Sept. 15 cations 3

Issue revised Procedures:

1504-4 Rev. 8-Installationof Transfer Canal Seal Complete Plate and Flood Line Cover Plate 1504-7 Rev. 4 - Closure IIcad Removal Complete 1504-8 Rev. 4-Reactor Upper Plenum Removal Complete 1504-15 Rev. 5-Removal of Core Support Assembly Complete 1506-1 Rev. 3-Reactor Upper Plenum Installation Complete 1506-2 Rev. 2-Closure llead Installation Complete 1506-8 Rev. 3 - Storage of Tansfer Canal Seal Plate Complete and Flood Line Cover Plate 1506-13 Rev. 2-Reinstallation of Core Support Complete Assembly 1509 Rev. 0-Reactor Vessel Missile Shield Complete llandling 1508-1 Rev. 0 - Incore Instrumentacion Sept. 15 4a Design ar.d modify the fuel pool divider gate lif ting lugs for greater factor of safety Complete 4b Design the cask pit gate lif ting lugs for a greater factor Sept. 15 of safety and issue engineering package for construction 4c Modify the cask pit gate lifting lugs Oct. 15.

1 e

ITEM DESCRIPTION STATUS Sa Revise the present cicctrical interlock system Dec. 15 limits (includes remov,51 of the travel path to the decontamination pit at elevation 348').

Sb Issue revised procedures and submit a tech spec Dec, 15 change concerning use of interlock system for certain designated loads and for handling loads in Region C.

6 Issue revised procedure for removing vessel head June 15 to restrict height to max. of 45" above the vessel flange.

7 The " Fuel llandling Building Crane Operation" June 15 procedure will be revised to prohibit heavy load movements in the northwest corner of the operating deck defined by an area encompassing Region B-1.

8 The " Fuel llandling Building Crane Operation" pro-June 15 cedure will also be revised to prohibit heavy load movements within Region B-2 other than: movement of the new fuel storage pit cover or decontamination pit cover at the minimum height necessary to place them in their storage position; or movement of the cask pit or canal gates to their storr3e locations.

9 The " Fueling llandling Building Crane Operation" June 15 procedure will be revised to prohibit movement of any heavy load in excess of 3 tons over the decon-tamination pit boundaries. ;

S

-,