Interim Significant Const Deficiency Rept,Item 102 Re Failure to Install Dowels & Shear Blocks on Emergency Feedwater Pumps.Initially Reported on 840216.Final Rept Expected by 840406
ML20087G447
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/09/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
102, W3K84-0507, W3K84-507, NUDOCS 8403200022
Download: ML20087G447 (3)


Text

.s g LOUISIANA N2 DRARONOE STREET P O W E R & LI G H T! p O. box 6000

  • NEW ORLEANS. LOUISIANA70174 * $04) 366-2345 UTIUTIES SYSTEM March 9, 1984 W3K84-0507 Q-3-A35.07.102 Mr. John T. Collins

}B@S0WM Regional Administrator, Region IV MAR I 6124 U. S. Nuclear Regulatory Commission p 611 Ryan Plaza Drive, Suite 1000 -

Arlington, Texas 76012

REFERENCE:

Telecon C. Hooper (LP&L) and D. Hunnicut (NRC lV) dated Fcbruary 16, 1984

Dear Mr. Collins:

SU3 JECT: Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 102

" Failure to Install Dowels and Shear Blocks" First Interim Report In accordance with 10CFR50.55(e), we are hereby providing two copies of the Interim Report for Ignificant Construction Deficiency No. 102, " Failure to Install Dowels and Shear Blocks".

This item was previously reported as PRD No. 155.

Very truly ours, dWm T. F. Gerrets h Corporate Quality Assurance Manager TFG:CNH:VBR Attachment ec: ' Director j Office of Inspection & Enforcement -l U. S. Nuclear Reculatory Commission I Washington, D.C. 20555  !

(15 copies) j 8403200022 840309 PDR ADOCK 05000392 S PDR '~

l,I .,*M i Tf

a i ._

Mr. John T. Collins March 9, 1984-i W3K84- 0507 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C. . 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Sui *=. 1500 Atlanta, Georgia .30339 d

a s

y y i g g - -

n- -- '--

INTERIM REPORT SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 102

" FAILURE TO INSTALL T;MLS AND SHEAR BLOCKS" INTRODUCTION This report is submitted pursuant to 10CFR50.55(e). It describes the problem of not installing dowels and/or shaar blocks on the emergency feedwater pumps and the emergency diesel generntors.

To the best of our knowledge, this deficiency has not reported to the USNRC pursuant to 10CFR21.

DESCRIPTION OF PROBLEM Thrcugh an internal design review around February 7,1984, it was discovered l that the dowels and/or shear blocks required by vendor's seismic analysis had '

not yet been installed on the emergency feedwater pumps and the emergency i diesel generators. l SAFETY EVALUATION These dowels and/or shear blocks are required by the vendor's seismic analysis, which is available in the Seismic Qualification Review files. We believe that this event is reportable because there is no assurance that this equipment would have performed its required safety function following a design basis carthquake without the installation of these dowals and/or shear blocks.

CORRECTIVE ACTION A review of safety related pumps and rotating r.achinery has been conducted pertaining to the vendor's seismic analysis. The only exceptions to these analyses is on the emergency diecel generators and emergency feedwater pumps.

CIWA's No. 840838 and 840839 have been generated to install the dowels and-shear blocks on the emergency diesel generators.and the emergency feedwater pumps.

A final report will be submitted on or before April 6,1984.

.