lGeorg4 Power Compan/
40 inverf. css Center Parkwat
' Pest off.ce Box 1295 '
Birmingham, Atateama 35201 Tetepnone 205 877 7122 s
I_
$Ne*a*lek nucsear Georgia Power tre southem enmc system voye Propct March 24,1995 LCV-0585 Docket No. 50-425 U. S. Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT SPECIAL REPORT 2-95-2 NUMBER OF STEAM GENERATOR TUBES PLUGGED DURING 2R4 In accordance with the requirements of Vogtle Electric Generating Plant Tec'..nical Specificat!ons (TS) sections 4.4.5.5.a and 6.8.2, Georgia Power Company submits this special report of the number of steam generator tubes plugged during the Unit 2 fourth refueling outage (2R4).
As a result of the inservice inspection completed on March 16,1995, a total of three (3) tubes were plugged in steam generator #2. Two (2) of these tubes met or exceeded the Technical Specification limit for wall thinning (40 percent). The remaining tube was plugged as a precautionary measure. Complete inspection results will be submitted within 12 months per the requirement of Technical Specification 4.4.5.5.b.
Sincerel,
0.W C. K. McCoy CKM/fEW xc:
Georgia Power Company Mr. L B. Beasley, Jr.
Mr. M. Sheibani NORMS r
U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 0 4(" "9504040208 950324 67' 01 O
PDR ADOCK 05000425
--