ML20087G332
| ML20087G332 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/02/1995 |
| From: | George Thomas DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20087G334 | List: |
| References | |
| NUDOCS 9508160351 | |
| Download: ML20087G332 (3) | |
Text
%
7,h bIC,A16D OE(@
t Beaver Valley Dower Station un ~"~
l cf I(
\\
(412) 643-8069 FAX i
GEORGE S. THOMAS gv g ;re m oni August 2,1995 Nuclear Power Division l
U.
- Nuclear Regulatory Commission Ah niion: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Revision 13, January 1995 l
This letter forwards a signed original and ten (10) copies of Revision 13 replacement pages for the Beaver Valley Power Station, Unit No. I Updated Final Safety Analysis Report (FSAR). The submittal reflects changes to the facility and procedures as described in the FSAR that were completed during the annual reporting period ending January 22,1995.
To the best of our judgment and belief, this revis:
,urately presents changes made since the previous submittal which are necessar,.o reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements. This revision includes:
Changes identified in the annual " Report of Facility Changes, Tests and Experiments." This report is being submitted separately under the provisions of 10 CFR 50.59.
NRC approved changes associated with the implementation of Regulatory Guides 1.58 and 1.88.
Changes to the description of reactor vessel head flange leakage monitoring in accordance with Technical Specification Change Request No. 211/ Amendment No.183.
The description of the Onsite Meteorological Monitoring Program has been replaced by reference to the Unit 2 FSAR.
Editorial changes intended to correct or clarify the text and figures of the FSAR.
9 se1603si 93090, R
ADOCK 03000334 O
'h i
lj.-
Beaver Valley Power Station, Unit No. I f
Updated Final Safety Analysis Report Revision 13, January,1995 Page 2
(
t f
If you have any questions concerning the
- attached, please contact i
Mr. Nelson R. Tonet, Manager, Nuclear Safety, at (412) 393-5210.
Sincerely, A"
fHic]
Geor e S. Thomas c:
Mr. L. W. Rossbach, Sr. Resident Inspector (w/o attachments)
Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager (w/o attachments) i l
i l
i l
t
)
4
6 h
AFFIDAVJT COMMONWEALTH OF PENNSYLVANIA)
) SS:
COUNTY OF BEAVER
)
Subject:
Beaver Valley Power Station, Unit No.1 BV-1 Docket No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared George S. Thomas, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.
\\
JM es
~
GeorgES. Thomas l
l Subscribed and sworn to before me 1
on this24/ day of[a a6'jNf(
YbA' n Notary Publ'ic i
Notaria1 Seal VMan V. Ha por, Notary PuMc l
industry Boro. Deaver County i
P'1 Commission E9 ires June 3.1999 Mornbar, Penne,t.aua Ahn%xan of Nfaw
-