Text
,
r
,.a
,h o,,,,,
"~%
L-%
g '
M.
orth Atl ic Energy Service Corporation
[#
e g-+%
/ Atlantic-SM NH M874 (603)474-9521, Fax (603; 174-2987 f ' *g (,,.
The Northeast Utilities System Ted C. Feigenbaum NYN. 95017 Senior Vice President s...
Chief Nuclear Officer February 14,1995 j
Mr. William T. Russell Director, Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555
References:
(a)
Facility Operating License No. NPF-86, Docket No. 50-443 (b)
New Ilampshire Yankee letter NYN-91028, dated February 20,1991, " Initial Certification for the Seabrook Station Dnit 1 Simulator," T.C. Feigenbaum to Director, ONRR
Subject:
Second Certi3 cation for the Seabrook Station Unit 1 Simulator t
Dear Mr. Russell:
North Atlantic Energy Service Corporation (North Atlantic) has enclosed pursuant to 10CFR55.45 the second simulator facility certification for the Seabrook Station Unit I simulator. The certification document is organized as outlined in ANSI /ANS-3.5 Appendix A, " Guide for Documenting Simulator i
Performance? Abstracts for each performance test conducted over the last four years, (1991 through 1994) are int,1uded in Appendix A.
Should you have any questions regarding this matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 474-9521, extension 3772.
Ve y yours, l
.c2v $ '
Ted C. Feige n
TCF:TGP/act 1
Enclosure 040109
@6 1\\
l 9504ocoo,9 950214 PR W CK osooo443
/
m
=
v:
'" ' Urtited' States Nuc! car Regalatory Commission February 14,1995 Attention:
' Director, Office of Nuclear Reactor Regulation Page two ec:
Mr. Thomas T. Manin Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA ~ 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 I
Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
[
Mr. Richard Laura NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 P
m i
'. (
\\
NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVEDCTOME: NO. altshot 36 q-
- ~-c EMPIRES: 10/31/9e -
ESTNATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION Cou.ECTION REQUEST:
130 HOURS.
FORWARD
%IMULATION FACluTY CERTIFICATION
' ""'"" "'" au'OEM EmW TO DE MMON AND RECOPDS MANAGEMENT BRANCH $dNSB 7T14), US NUCLEAR REGULATORY COMMIS0lON, WASHINGTON, DC 200854001. AND TO T>E PAPERWORK REDUCTION PRQJECT (31904130) OFFICE OF Makar'8Mm4T AND BUDGET, WASHINGTON. OC 3000s.
NWTRUCTIONS: Thee form is to to filed for inmal certiflcahon, recortillcahon (If reapared), and for any change to a ownuielson faciley podermance taanng plan mese aRet Inimal eutenleni af such a seen. Preusse the foslousne insonnenen and shoca the answoortese bom to indicase reason for outwnimal.
PACUTY
- DOCIET NUM Seabrook Station Unit 1-s0- 443 uCEmeEk DATS (See NPF-86 Operating License) 2/14/95 The is e eene met r
- 1. The above named teciley teensos is using a ennuishon facilityconsisting monely of a plant teforensed simulator thel meste the requiremente of 10 CFR 96.46.
- 3. Desumentellen le sweliebte for DsRC enview in accordance unth 10 CFR 96.46(b).
S. Thes eenuladlon lectiey meste the guldence coritained in ANSI /AN8 3.5,1985, as endorsed by NRC Regulatory Guiale 1.140.
E more e,o any exCarTiONs a me c.rmcahon or mio malaECK NERE [ ] and desces funy on admanai nages = nec-mary NARE (or setor idensecagon) AND LOCATION OF s3MULATION FACILITY.
North, Atlantic Energy Service Corp.
Seabrook Station PO Box 300 Seabrook, NH 03874 X
alMULATION FACluTY PERFORMANCE TEST ASSTRACTS ATTACHED. (For peermance fases conduceed in me pened endog wist me done of rus eersecaserQ DESCRif"10N OF PENORMANCE TESTING COMPLETED. (Ansch addeonaf pages as necessary and asenefy me Jtem desenpean Demy canonued)
See Attached SMULADON FACIUTY PENORMANCE TESTWG SCHEDULE ATTACHED. (Fw me conduct WappmenmWy 2r erpeennance met pw year br me Aw yewpened cornmencing um y
me afsso et mis cortsposportJ DESCNfmON OF PERFORMANCE TESTING TO SE CONOUCTED (Asoch admooner pages as necessey war apenWy me amm enscopson semp consnued.) -
See Attached X
PENOMCE EN PLAN CHANGE. (Fw wry nwdhoon b o pe4nnesos beeng pen memaled on a pmumm corescaat)
Cf,7JWncr4 CF PERFORMANCE TESThG PLAN CHANGE (Assen someoner pages as necessary eno uponery sne som oescapoon oerng consnueo.)
See Attached RECEfmFICATION (DesoGo conocews sceans som asach resuns of compiedad poennance esseng e accordance we 70 CFR Si45(bgS#r),
(Asson asilosonef pages as Adonefy me dem cascappen eseg consnued)
Any sesso sensemere orp en the doc inesuemg snachtnente, may be outspeci to stui and enmmat senchone. I cerWy under penany at perjury thas the mtormaten in the sleeumoni and sospeWnente de true and c
/
SIGNA
- ALIT >tORZED fE
- ENTATIVE, TTTLE DATE gyy gg Executive Director-Nuclear Production
/M
/
e ac.o,.ence.en 20 CFR. C__
- n. th..orm -.e euern.e. io ino Nfc.,oso.o; SY MAIL ADDfESSED TO:
OPPICE OF teUCLEAR REACTOR ftEOULATIOle BY DELNERY IN PEstSON ONE WNfTE PUNT IdORTH U.S. NUCLEAR ptEOULATORY COesesseseOet TO THE NRC OFFICE AT:
11ses stocrvtu2 PIKE WASNItseTON DC 20085.e001 flOCKVILLE, MO 8WC FOfti 474 (19413 PRNTED ON RECYCLED PAPER