ML20087F804
| ML20087F804 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 02/17/1984 |
| From: | Koester G KANSAS GAS & ELECTRIC CO. |
| To: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20087F801 | List: |
| References | |
| KMLNRC-84-016, KMLNRC-84-16, NUDOCS 8403190229 | |
| Download: ML20087F804 (1) | |
Text
...
KANSAS GAS AND ELECTRIC COMPANY gg%h r.e sucrac cwev F
S23W:)p
\\
ei.enn e nossvun
)
L February 17, 1984 Mr. J.E. Gagliardo, Acting Chief Reactor Projects Branch 2 U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 KMLNRC 84-016 Re:
Docket No. STN 50-482 Ref:
- 1) Letter KMLNRC 83-053 dated 5/11/83 from GLKoester, KG&E, to WCSeidle, NRC
- 2) Letter dated S/25/83 from WCSeidle, NRC to GLKoester, KG&E Subj: Verification of Education Requirements
Dear Mr. Gagliardo:
Reference 1) provided information concerning an incident at Wolf Creek Generating Station in which a Quality Control Inspector had riot graduated from high school as he had stated on his employment application. Reference 1) further described the actions that Kansas Gas and Electric Company (KG&E) was taking as a result of this incident. One of the actions was to verify that all KG&E personnel in positions which by regulation require a high school education have graduated from high school. Reference 2) requested KG&E to notify you of the verification results.
KG&E has completed the verification process and found no other similar instances. Although this was an isolated incident, we will continue to have our background investigation contractor routinely verify the highest education level completed down to and including high school as described in Reference 1).
I_
Yours Nry truly, gggh N
GLK:bb cc: WSchum B403190229 840313 PDR ADOCK 05000482 A