Responds to IE Bulletin 83-07 Re Products Supplied by Ray Miller,Inc.Neither Unit Received Products from Ray Miller, Inc & Vendor Not on Approved Util Vendor List
ML20087F709
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/12/1984
From: Larson C
NORTHERN STATES POWER CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IEB-83-07, IEB-83-7, NUDOCS 8403190200
Download: ML20087F709 (4)


Text

r-k Northern States Power Company 414 Niconet Matt Minneapoks, Ennesota 55401 Telephone (612) 330 5500 March 12, 1984 Richard C De Young, Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Prairie Island Nuclear Cencrating Plant Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Response to IE Bulletin No. 83-07: Apparently Fraudulent Products Sold By Ray Miller, Inc.

In response to IE Bulletin 83-07, the results of our review and investiga-tion indicate that the Prairie Island Nuclear Generating Plant, Units 1 and 2, have not been the recipients of fraudulent products sold by Ray Miller, Inc.

IE Information Notice 83-01 Supplement 1, Attachment 1, documented the customer list of Ray Miller, Inc. , during the period of 1975 to 1979 and designated those organizations that received fraudulent material. A review of the list indicated that there were eight suppliers that could have sent material to Prairie Island, only one of which was designated as c receiver of fraudulent material. This supplier, Brown Tank, did indeed supply tanks to NSP during the late 1960's and early 1970's. Review of the receipt document-ation shows no indication that material used in fabrication of these tanks was supplied by Ray Miller, Inc.

The lists provided with IE Bulletin 83-07 and two supplenents were reviewed to determine if there were any recipients of Ray Miller, Inc. raaterial that could have supplied material to Prairie Island. This review and investiga-tion indicated that there were no apparent suppliers listed that would have supplied Ray Miller, Inc. material.

An additional review program was undertaken at Prairie Island to further verify that no f raudulent Ray Miller material had been shipped to the site.

All purchase orders and receipt inspection documentation were reviewed, for the time period 1975 to 1979, to ascertain if any material supplier or I

8403190200 840312 gDRADOCK 05000282 dd !

PDR Ile l u

NORTHERN STATE,3 POWER COMPANY Mr. Richard C. De Young Page 2 March 12, 1984 sub-tier vendor purchased or used any material from Ray Miller, Inc. , in products sold to NSP for use at Prairie Island. This review indicated that no Ray Miller, Inc. material was supplied to Prairie Island from 1975 to 1979.

Although the following purchase activity occurred well before 1975, it is provided for information. RECO Industries, Inc. (formerly Richmond Engi-neering Co. , Inc.) informed Westinghouse that Pressurizer Relief Tanks (PRT) built by them and supplied to Westinghouse for Prairie Island con-tained material which was procured from Ray Miller, Inc. The PRT is classified as non-nuclear safety-related and does not perform any safety function, mitigate the consequences of an accident, nor is it part of the RCS pressure boundary.

Description of Material:

Westinghouse P.O. : #546-CRI-84981 BN RECO Job No.: L 14976 Westinghouse Item: NRPRCATPR-01 Westinghouse Drawing: 686J078 Sub 1 Shipped To: Prairie Isicnd Date Shipped: May 18, 1971 Ray-Miller Supplied Material:

Westinghouse Mark No. Service Description 56 Internal Pipe 10" Sch 40 45' Ell T-304, HT #SQ11 50 Relief Valve 10" 600# RF, WN Flange T-304, Discharge HT #792 Therefore, our review and investigation indicate that Prairie Island has not been the recipient of any apparently fraudulent products from Ray Miller, Inc. Furthermore, Ray Miller, Inc. is not, and has never been, on the NSP Approved Vendor List. Receipt inspection personnel have been alerted to watch for material that might still be stocked on supplier's shelves.

NORTHERN CTATED POWER COMPANY Mr. Richard C. De Young Page 3 March 12, 1984 Time spent to perform requested review and prepare documentation is esti-mated to be 2500 man hours.

E 2 CE Lar Y

- Director, Nuclear Generation ec: JG Keppler NRR Project Manager, NRC Resident Inspector, NRC G Charnoff h

s

-c.- . , , - - - -,

,y, . mn , w 1 r4,--,6%, -,y, , m e, .g.m ,-irr TM~ Twe v = ==

  • r- w-*- e+= - - + - = <tww+r----tw

UNITED STATES NUCLEAR REGULATORY C0tMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 50-306 RESPONSE TO IE BULLETIN NO. 83-07 Northern States Power Conpany, a Minnesota corporation, by this letter dated March 12, 1984 hereby submits the response to IE Bulletin No. 83-07 for the Prairie Island Nuclear Generating Plant.

This letter contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By M CE so Direct Nuclear Generation t

On this /4 day of haf//b , ///f t/ before me a notary public in and fer said County, personally appeared C E Larson, Director, Nuclear Generation, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the state-ments made in it are true and that it is not interposed for delay.

Q-

_ r"

//?v )

I, %"*" ' WYARY 8UGLIC c

.teesseggorg J

< I g,,- W WNTY  : ,

-- 8as=== o.e es esp!

L