a 2NRC-4-023 (412) 787 - 5141 Telecopy Nuclear Contruccon DMalon March 6, 1984 Robinson Pfama, Building 2, Suite 210 Pittsburgh, PA 15205
@&M 0WMT United States Nuclear Regulatory Commission R - 9124 6 1 Rya Plaza Drive Suite 1000 U
-- p y
Arlington, TX 76011 a
ATTENTION:
Mr. Uldis Potapovs Chief Vendor Program Branch
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Do cke t No. 50-412 Rockbes tos Company Cable for Use at Beaver Valley Unit 2 Gentlemen:
This le t te r is in response to your January 23, 1984 letter to our Mr. E. F. Kurtz, Manager of Regulatory Af fairs,
which referenced a January 12, 1984, telephone convers ation between Mr. V. Thomas of the NRC staf f and Mr. W. Provencher of Stone and Webster Engineering Corporation (SWEC).
Your statement in the January 23 letter that " cab le procured from the Rockbestos Company for Beaver Valley Unit 2 required only to comp'.y with ICEA Standard Tes t Values" was is incorrect in its scope.
The January 12, 1984 telephone correersation between Mr. Provencher and Mr. Thomas specifically concerned Purchase Orde r No. 2BV-816A for 600 Volt Shielded Control Cable and the Accelerated Water Absorption Test, Electrical Method (EM-
- 60) as desc ribed in ICEA S-66-524, Sect ion 6.6. 2.
Per the s peci fication for 2BV-816A, the vendor was only required to meet or exceed the ICEA requirement s for the EM-60 t es t.
Specifically, this includes a stability factor af ter 14 days.
of 1.0 (maximum).
The vendor, however, guaranteed a stabil-ity facto r after 14 days of 0.5 in his bid proposal.
Some c ab les on the 2BV-816A order were found to have a ' s t ab i lity f acto r after 14 days of 0.6.
SWEC reviewed this deviction from the vendor's guarantee at the time it was discovere1 and concluded that a value of 0.6 for the stability factor'after
~
k 14 days was satisfactory since it met the ICEA value of 1.0 is \\b
\\
\\
8403190152 840306
-J PDR ADOCK 05000412 A
PDR 1
r l
e United States Nuclear Regulatory Commission
~
Mr. Uldis Potapovs page 2 or less as originally required in the purchase specification.
Rockbes tos, at that time, also stated in writing that they b elieved this cab le was fully suit ab le fo r safety related u se.
DUQUESNE LIGHT COMPANY q_('.o;~te By Fo= E 3.W4-E. J. Woolever Vice President SDH/wjs cc:
FRC Document Control Desk Mr. G. Walton, NRC Res ident Ins pe ct o r Ms. L. Lazo, Project Manager