U.S. NUCL"AR REGULATORY COMMISSIOK
- ATOMIC SAFETY AND LICENSING BOARD RE: Phila.Eleo.Co.
Docket # 352 E05 METED i
Limerick Qan.Sta. Units 1 & 2.
February 23,19si$.E i
APPLICATIbE BY ANTHONY /F0E TO PILE A CONTENTION BASED 05 NEW f~
PBCo's APPLICATI0F PART 70 TO STORE F7EL AT THE LIMERIf.,E [LANT D
/8 CFFICE 0.; SEUsim.
-w On February 21,1984 we were served by B'.H.Vogler,NRC staff [dE k,ju k '
an"1MEFEED APPLICATION FOR SPECIAL NUCLELR MA'TERIAL LICENSE FOR LIMERICE GEN.
STA. UNIT NO.
1." (Docket N.' 70- 2988).
7e hereby apply to the Board to allow a filing of a contentiop based'on tnis new material on behalf of R.L.
Delaware Valley.
Anthony and Friends of the Earth in the
- 1. The storine of nuclear fuel at the Limerick plant is a hazard t$ the community and me and my family personally because the Board is in the process of determining in evidentia y hearings whether the safety related buildings r
can withsta d overpressures and impacts from off-site accidents in Contentions n
Y 3a and V 3b. Until the Bogrd nas all the evidence and has ruled that these structures are built to withsta d off-site accidents,no' fuel can be risked there.
n 2.The NRC Staff is in the process of ascertgining' verification from PEco that the plant " has been designed and co0structed in accordqnce with the reg-lations and Safety Analysis deport commitments". (Letter 1/10/84 D.G.Eisenhu:t to E.G. Bauer,Jr. requesting pl ns for verificatien within 30 days) Today we a
were informed by Edward Cullen of Mr.Bauer's staff that PE:lo plans to submit a proposal on the verification program by March 15. Until this verification y
t has been accomplished to th'e satisfaction of the XRG Staff no 'uel storage can be contemplated because of the hazard stated in Para.1,above.
- 3. The NRC Staff has recently raised ouestions about the cualification of the Limerick overhead cr nes for handling nuclear fuel sincethgr do not have a
the required load safety factor. No fuel can be brought to the site until this handling equipment has been strengthened, tested,and qualified as per regulations.
- 4. Even if the buildings and cranes are finally found to meet the NRC d$ standa ds when the hearing and regulatory processes have been accomplished, r
E$$' no fuel can be. brought to the plant until the safety of the public is provided og y
for by approved off-site emergency plans in the event of an accident which could
' a3 set off a fission process while fuel is being transported to or brought into or y
the plant.Unless emergency plans are prepared and ready,the community cannot be exposed to the risk of nuclear fuel and accidental release of radioactivity,
<ob Cc: Judges Brenner, Cole, Morris, Re sp_ec tfully. submitted NRC Staff,M.J.WETTERHaHN,Commonwe lth, W-4,M,
- U l
City of Phila.,other on service list.
Bor 186, Moylan,Ya.190h a
P SJe reque t this filing be added to the record as an exhibit when the hearings-s l
- resume, 1
.