Georg:a Power Cunpaay 333 P:edmont Avenue
<g At!anta. Georgia 30308 Telephone 404 526-6526 Mainq,vness:
Post Off ce Box 4545 Atlanta, Georg a 30302 h
M A0I 20 Georgia Power
,p L T. Gucwa ve - myn e,e.t9; sw +
Manager Nuclear Erg.neer rsg and Chief Nuclear Eng.neer NED-84-058 February 6, 1984 U. S. Nuclear Regulatory Cmmission
REFERENCE:
Office of Inspection and Enforement RII: JPO Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW IER 321/83-32 Atlanta, Georgia 30303 366/83-34 ATIENTION: Mr. J m es P. O'Reilly Gentlm en:
The following information is sutmitted in response to Inspection Report 50-321/83-32 and 50-366/83-34 special safety inspection conducted by Mr. J.
R. Wray.
DEVIATION:
NUREG 0737, Its II.F.1, Attachnent 3, "Contairment High-Range Radiation Monitor",
specifies in Tablo II.F.1-3 that in
- situ, electronic calibration is required for all range decades above 10 R/hr.
In situ calibration for at least one decade below 10 R/hr shall be by means of calibrated radiation source.
Furthermore, instrtuent linearity through all scales up to 1 E+6 R/hr must be assured by type testing at sufficient points.
Contrary to the above, on November 17, 1983, the two High-Range Primary Contairment (Drywell) Radiation Monitors for each unit were found not adequately calibrated by electronic signal substitution through each decade up to 1 E+7 R/hr; nor had linearity been assured through all scales up to lE+6 R/hr at sufficient test points.
RESPONSE
Corrective Actions Taken:
Procedure revisions addressing this iten have been drafted and are undergoing the review and approval process.
8403160349 840309 PDR ADOCK 05000321 g
1 Georgia Power d U. S. Nuclear Regulatory Ccmnission Office of Inspection and Enforcenent Atlanta, Georgia Page 'No February 6, 1984 Corrective Actions That Will Be Taken to Avoid Further Deviations:
Plant procedures HNP-1 and 2 - 5362, "Victoreen Model 876 Electronic Adjusbnent" will be revised to require a calibration of High Range Primary Contairrnent (Drywell) Radiation Monitors in accordance with NUREG 0737, Iten II.F.1, Attachnent 3.
In addition, these procedures will include a revised calibration frequency of 18 months.
Revised procedures will be issued by March 13, 1984.
After procedure revisions are issued, the affected radiation monitoring ir.strtanents will be recalibrated.
If you have any questions or ccmnents please contact this office.
I Very Truly Yours,
'.a'
(%},'
^
CW{Q%'
l
/
L. T. Gucwa MJB xc: H. C. Nix, Jr.
Senior Resident Inspector l
1 o
l i
700775 j