ML20087E814

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1991 for Jm Farley Nuclear Plant Unit 2
ML20087E814
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1991
From: Dennis Morey, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201220172
Download: ML20087E814 (5)


Text

e Scuthern Nuclear Operabng Company Porg 0fco Bos 1205 Damingham. A!abama 35201 Telephone 205 86850B6 m

Southern Nudear Operating Company a, n. w oooaro y'

the southom elecinc system January 14, 1992 Docket fio. 50-364 U. S. Nuclear Regulatory Commission

. ATTN: Document Control Desk Washington, D. C.

20555 Joseph H. Farley Nuclear Plant Unit 2

._ Monthly Onerat inn Hata_ Report Gentlemen:

Attached is the December 1991 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, N

4 1

t.bDs Mm

~7 Woodard NJ AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9201220172 911231 yg2y

-4

-- PD9 ADOCK O'50003A4 R

PDR

//j

JOShPU H. l'ARIIY NUClJ%R Pl.Mir UNIT 2 NARRATIVE SilHMMtY OP OPERATIONS Deceitber 1991 There were no unit shutdowns or major pover redu.' lons during the month of December.

The following major safety-relatad maintenance was periouned during the month 1.

Hiscellaneous corecctive and preventive maintenance was performed on the diesel generators.

'D" charging himp seal replacement.

2.

?

OPERATING DATA REPORT DOCKET NO. 50-364

~

DATE January 3, 1992 ~

COMPLETED BY ~D N. Morey

~

TELEP110NE (705T5W~5YST OPERATING STATUS

~

Notes

1. Unit Names soseph H. Parley _. Unit 2
1) Cumulative data since
2. Reporting F. %

(FecemT>er TW1 7-30-81, date of iver (HVt):

2,652 commercial operation.

~~

3. Licensed The

~

4. Nameplate Rating (Gross HVe):

860

5. Maign Electrical Rating (Net RVe)t UYF

~

~

6. Maximum Dependable Capt. city (Gross HVe):

864.2

7. Maximum Dependable Capacity (Net HVe):

P 2T.0

8. If Changes Occur in Capacity Ratings (Items IEiiili~er 3 Through"7) Since Last Report, Give Reasonst_N/A
9. ;over Level 'lo.Vhich Restricted, If Any (Net HVe5 N/A
10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Ilouts In Reporting Period 7A4 8,760 91,369

~

12. Number Of flours Reactor Vas Critical 744 8,7,M 78,864.3
13. Reactor Rertrve Shutdovn lloura 0.0 0.0 138.0
10. Hours Generator On-Line 744 8377.3 77 V25~5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (HVH) 1,971,597.6

~21~755,372.6 H8 959,32 G a %,084.0

17. Gross Electrical Energy Generated (HVH) 651 1U0 7.0906200 65,7
18. Net Electrical Energy Generated (K'H)

~~62, 3 6 ' ' ' '

'~,7NEU3 _61,934,03E0 6

19. Unit Service Factor

~

100.0 95 5 85 3

30. Unit Availability Factor 100.0 95.~6 8G

~~~

21. Unit Capacity Factor (Using HDC Net) 101.3 ~'

9D

~57 7

~

23. Unit Capacity Factor (Using DER Net) 100.6 92 3 6D

~ ~ ~

23. Unit Forced Outege Rata 0

23 42

24. Shutdowns Scheduled over Next 6 Honthr. (Type, Date, and Duration of Each):~

Refueling /Haintenance Outage, March 6, 1992, Approximately 7 veeks

25. If Shut bovn At End Of Report Feriod, TsIlmated Date of Startup N/A

~

36. l' nits In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERf:IAL OPERATION 08/01/81 6773D781 Form 2/30 l

l

)

DOCKET NO.

50 364

~

UNIT 2

DATE January 3, 1992 COMPLETED BY D. H. Morey TELEP110NE (205)099 5156 HONTH December DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER II, VEL (HVe-Net)

(HWe-Net) 1 820 17 Bei _

2 821 18 84_0 3

828 19 A40 4

838 20 816 5

840 21 840 6

839 22 834 7

837 23 831 8

831 24 836 9

827 25 838 10:

835 26 837 11 835 27 830 12 834' 28 033

^

13 831 29 836-14 832 30 838 15 839' 31 824 116 -

841-l-

i i

, INSTRUC* IONS un this-format. list the average daily unit power level in HVe-Net for each day in the reporting month. Coopute to the nearest whole megawatt.

l-Form 13/21

tar an: asis mo ma acxazms nearr sc.

s.-u 4 tatIT fuM:

J. 51. N.ZT - tsc7 2 13cr ' Jasmserv 3, IM2

~

CDPPLErtD Br D. C. ItutEY

\\

BEPCRT 2tIFTR CECIMBut TEIZMDIE (25563?o-5136 s

I i

i i

! n=mm or i uce=:rx 1 1

I a me. = c=rre t

I-1 I

I -2=

1 isnurr:=c I Ermre i rutsn ! - I cz= o I.

2 Im3.

I ants 1 errs Ita:asi I amm:2 g,,,,c,;,s

,c,,4, c,,,s g.

,,,,,,,,c,,,c; g

lhre were no tusit shut &mns or mejor power rehaction.a earia; the month of Decer.

l l

l l-1 I

i i

i I

i 1

i I

i i

i i

i i

I I

I i

i i

i i

i i

i I

i I

I t

I i

i i

i I

i i

1 i

i i

I I

I I

I i

i i

i i

i i

i I

1 i

l I

i i

l i

I i

i I

I I

I I

I I

I I

i i

i i

i i

i i

l i

I i

i-1 I

I I

I i

i i

i I

i l

i 1

i l

I i

I I

I I

I I

I I

I I

i I

1 i

i i

I i

i i

i i

i i

i i

i I

i i

i 1

I I

I

'l i

i I

I I

i 1

1 I

I I

I I

i i

I I

I I

I i

i i

l 1

i I

I I

I I

I I

i i

i i

i i

i I

i I

I I

I I

i l

I i

l i

i l

i I

i i

i i

i i

i i

i i

I I

i 1

F: Forced Reesec:

Method.

'rshibit G-Instr *sct2.cas S: Scheduled A-Eqtairmant Failure (Explain) 1-Marumal for Properatien of Data B +.aintenance or Test 2 h 1 Scram.

Entry h ets for Lacense,

I C-Refueling 3-As.itematic scram.

Ev-s+ aspetttLZ23 File ( N t>4erp:1 story Rastraction 4-other (Emplaint 0161)

~Wrator Training ti I,1 cense tramination F-Jlsimitistr ative Exttibit 1 -Same Source G-operatirmal Er or (Explain)

(9/77; n-other (Expleini i

i

-