re,=n um cwuanno c-,y Pct.t O'ke ibx I?95 o,rmingham Alaberna 35?01
- Teehye 205 Bf,8 50M h
Southern Nudear Operating Cempany J. D. Wocdard Vee hesident IM SC#kW1 (""CI"J WS!f""
rs*y n ect n
January 14, 1992 Docket No. 50-348 U. F. Nuclear Regulatory Commission ATdu Document Control Oesk Washington, D. C.
20555 t
Joseph M. Farley Nuclear Plant Unit 1 Monthlv Opera.tj,nq Da.ta RepoIL_
Gentlemen:
Attached is the December 1991 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1. as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, kl m\\ ~<k g'
'A
. Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 4
.y.
<a i-63
>g
.gp<
paa ggay{
l
//e
JOSEPli M. FARLEY NUCLEAR PIMF UNIT 1 NARRATIVE SUhdARY OF OPI: RATIONS December 1991 There vere no unit shutdowns or major power reductions during the n.onth of December.
The following major safety-related maintena. ice was performed dur-
.e month:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
l-OPERATING DATA REPORT DOCKET No.__50-348 DATE _ January 3, 1992 COMPLETED BY D. N. Horey TELEPHONE 725575W3156 OPERATING STATUS Notes
- 1. Unit Names Joseph H. Farley - Unit 1
- 1) Cumulative data since 2., Reporting Period:
December 1991 12-1-77, date of 3.- Licensed Thermal Fover (HVt):
- 4. Nameplate Rating (Gross MVe) -
2,652 commercial operation.
850
- 5. Design Electrical Rating (Net MVe):
829
~
- 6. Maximum Dependable Capacity (Gross R7e):
856.4
- 7. Maximum Denendable capacity (Nr; Hve):
814.0
- 8. If. Changes Occur in Capacity hairngs (Items Number 3 Through"77 Since Last Report, Give Reasons: N/A
- 9. Power Level To Vhich Restricted, If Any (Net MVe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Bours In Reporting Period 744 8760 123,456
~
- 12. Number Of Hours Reactor Vas Critical 744 675675~
95,91677~
- 13. Reactor Reserve Shutdown Hours 0.0
'UTU-3i65UTU-
'14. Hours Generator On-Line 744 6872.67 94,76373~
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (HVH)
I VET,350.3 17,770,643.2 7%T'404,624.2
- 17. Gross Electrice.1 Energy Generated (HVH) 639,298 5,734,424.0
~7, 84,762 18.' Net Electrical Energy Generated (HVH) 607,102 5,411,266.0 73,414,77H76~
19.-Unit Service Factor 100.0 78.5 76.4
- 20. Unit Availability Factor 100.0 78.5 76.4
- 21. Unit Capacity Factor (Using HDC Net) 100.2 75.9 73.5
- 22. Unit Capacity Factor (Using DER Net) 98.4 74.5 71.7
- 23. Unit Forced Outage Rate 0
2.3 7.1
- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
N/A
- 23. If Shut Dv.n At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAli OPERATION 12/01/77 12/01/77 l-l l
Form 2/34 l
l l
4 t
DOCKET No.
50-368 UNIT 1
4 DATE January 3, 1992 COMPLETFD BY D. N. Morey TELEPHONE (205)899-5156 HONTH December DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (HVe-Net)
(MVe-Net)
- 1 808 17 805
. 2 810 18 712 3
815 19 827 4
823 20 822 5
825 21 825 0
826 22 822 7
823 23 820 8
818 24 821 9
815 25 823 10 821 26 822-11 821 27 823 12:
_ 819 28 820 13 816 29 822 14-793
- 30 825 15 825 31 837 16 827 INSTRUCTIONS.
On this format, list the average daily unit power level in MVe-Net for each day in the reporting month. Compute-to the nearest whole megawatt.
Form 13/21
x 1.
t
~
LtMIT mitfEDt2 5 m 700ER N DDCMT Wo.
'34-348 '
tREET InfE S. G F8mE5r - M l'~
. gygyg. Jammary 3, 1992 ~
?I aseemse w - e. v. masr
~
u.
m.our==rs =cm sR sixc===
-42esis,,-stss 5-1 El
- 1
- l:
.l-
=rner massenet l
5X i
J i
lso.
.1 imre. : 1 Tnz 1 (mas. I wason lThere were no unit staatdouns or major power redmetions.daring the samth of December, ll l
l.
.. l.-
1 l
- l; 1
l l-
- 1 11 1
I i
.. I I
l 1 --
1.
I-El 1.
I 1.
i 1
1-li-1 1
I 1-
.I 11 1
I
- l
' l-I
'l i
LI I
i 1
I l'
- .1 -
1
- 1 -.-
- 1 l'
I I
I l
I l
i 1:
l i
1 I
I l
l lL 1
1 1
1.
'l-I I
I
'l-I' I
1:
1 I
l I
I
~1 1
l-l' i
l i
1 11 I
l' l-i I
I I
.I l
.i 1
l-
.I' I
I I
i
- 1 1
l-
.I
'I 1
l I
I l-I
'l 4
l 1.
'l 1-
.I 1
I i
1:
1 i
I I
l~
.l I-1 l-I i
i i
I I
I I
I I
I 1
1 l-1-
1 I
I I
.I
.1 -
~1 I
i I
i i
i l
l-1 1
I l-I l-1 I
i i
l-1 i:
1.
.I I
i l-1 I
l-ll l
1 I
i l-1 I
I I
I 1:
.I I
.I I
l-1.
-l I
i 1
1-I
'l I
i i
i l'
I l
I l-l-
I l-I I
i l
I
'l i
I
~l I
i i
i I
i i
feethod:
tahibit G-Instructions F: I'orced seasms 5: Schedulled
. A-Equigenent Failure (Explain) 1-femanal for Freperation of Data IHamintenance or Test 2-atmsal scram.
Entry Sheets for Licensee C-Refueling 3-Artematic scram.
Event asportiLER) File (=UnmG-
!>-Regulatory Restriction '
4-Other (Explain) 9161)
E-operator Training & License Examination fExhibit I -Same Source F-khainistrative '..
G-operational Error (Explain) 5-other (Explaint Page 1 l