ML20087E428
| ML20087E428 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/15/1992 |
| From: | Cottle W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00009, GNRO-92-9, NUDOCS 9201210238 | |
| Download: ML20087E428 (5) | |
Text
O 2# ENTERGY ST!T*""*"*' '"*
H<tah;o##5;m
< Ry - T/ t h W. T. Cottio ya>
o.m u o w - s.w,
January 15, 1992 U.S. Nuclear Regulatory Commission Hall Station PI-137 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPI'-29 Security Boundary Upgrado Status Hoport for Period Ending December 1991 GNRO-92/00009 Gentlemen:
As discussed in AECM-90/0058 dated March 30, 1990, Entorgy Operations committed to submit bimonthly stat.us reports regarding the Security Boundary Upgrade Project; however, per discussion between Ent. orgy Operations. personnel and W. J. Tobin of.NRC Region II~on September 28,.
1990, these reports need only be submitted if there is a change to t.he status d(fcribed in the previous report.
Attached is an updated N urity Boundary Upgrado pt act Statum Report s
that includes discussion regarding background and past accomplJshments in our overall efforts to upgrado the entiro plant security boundary, thn milestones for those nf f arts now focusing on the south boundary, and the related actions completed since the submittal of our last report.
This letter and the attached status report do not cou* ain safeguards information.
Should you need more det.nlled information on any specific item, please contact this office.
Yours truly, Ca> CW WTC/DBM/bc attachment: decurity Boundary Upgrade Project Status Report cc:
(See Next Page)'
G9112171/SNLICFI.R ggg3 9201210238 92011b PDR ADOCK 05000416 l/ I 1
F PDR
... ~
~. _. _ _ _. _ _. _ _ _ _ _ _... _. _ _.
?
fi i
nny y "
s,.
January;15, 1992 GNRO-92/00009
'Page 2 of 3.
'cc:
Mr. D. C. Illntz (w/a)
- Mr. J. L. Mathis (w/a)
Mr. R. B. McGohee (w/a)
Mr. N. S. Reynolda (w/a)
Mr.11. L. Thomas (w/o)
- Mr. Stewart D. Ebneter (w/a)
Regional Administrator
'U.S. Nuclear Regulatory CommissJon Region II 101'Harietta St., N.W..' Suite 2900
.1
-Atlanta, Georgia -30323 Mr.- P. W..-0'Connor, Project. Manager (w/2)
Of fien of Nuclear Reactor _ Regulation-
- U.S. Nuclear Regulatory Commission Mail Stop.-_13113 Washington, D.C.
20555.
-[
h i
1 L
i-l G9112171/8NLICFLR L
L s +,
,e.
,--.n.
e r,
+
. - - + - - - -,
V--
1,
-Statua Report _f[6_.
Attachment to GNRO-92/00009' JAs oft._Docomber 31, 1991 E-
.T SECURITY-BOUNDARY UPGRADE PROJECT STATUS REPORT I'
SECURITY BOUNDARY: UPGRADE PROJECT NRC inspections and_ reviews, including the 1988 Regulatory Effect 1veness
'Roview (RER),Lidentified an issue which is tho-focus of this series of-statustroports._ '& Security. Boundary Upgrado Project was initiated duo
.to concerns with camera coverage on the south boundary.
Study of tho lasuo.has identified two related concerns which must be concurrently addressed to obtain an effectivo solution to the camera coverage lasuo.
-Thoso additional 1;oncerns are the camera monitoring computer system capacity _and: working conditions in the CAS/SAS. Entergy Operations has
-developed. plans.to correct thoso. concerns, and is proceeding with their internal approval and Implementation.
'II.-
UPGRADE PLAN:-
A. plan has-boon developed to address concerns relating to the south boundary.. The plan has two major parts -
4 L
- 1.
'Short-term-Improvements
_Activition to improvo camera coverage and
'CAS/SAS working conditions-(completed in early:1991):
Rolocate two cameras'
.AdI cantilover' mountings to two cameras-Change five camera lensos
-- ~ Add glare: scroons to CAS/SAS. computer display monitors
- 1 Replace existing CAS/SAS printers-
- Improvo CAS/SAS room lighting.
2.
Inng-term improvements - Currently planned activities includot
_ Increase camera' coverage Upgrado vjdoo transmissi.on equipment Rework the'~ southwest fencolino Major.upgrado of the secur1ty computer system-Rework the CAS/SAS with human factors improvements.
e
+
f~
D 09112171/SNLICFLR - 4 p
I.
= Status Report J 6_
~Att.achmont to GNRO-92/00009
=,-
'As'of:-
Occemigr_31 1991 a
2
(?
'111. MILESTONE SCllEDULE:
The-planned schedule for currently identiflod activities in the Security Boundary Upgrade Project are presented below:
Comp 1ntion
. Ag_t_iv i ty Datn SJutus 1.
- Initiato scoping study.
11/89 Completed 2.
Scoping study complete.
05/90 Completed 3.
Prepare tentative upgrado plan.
05/90 Completed 4.
Begin implementatjon of short-term 05/90 Completed improvements.
5.- :Brief NRC: Region 11 on Scoping Report 36/90 Completed-j results.
6.
Completo implementation of short-term 02/91 Completad improvements.
7.-
Phase I of long-term-Improvements
-07/91 Completed (design work-for improvements on Zones 7-13, procuro new equipment, and develop custom suftware for the equipment),
i
- 8.. Phase II of long term improvements 12/91 Completed
- Y (procura additional equipment, install new-
- -j V-cameras, relocato existing cameras, Install now Perifold-M intrusion detection system, rework._ fences In'Zonon
- 13. nnd
- design work for Zones 11-6 trprovements).
9.
Phase III of long-term Improvements.
12/92
- Approved, (procurn-final:new equipment, install final l
r.cw cameras, relocato existing cameras, funding ^
rework 11ntrusion detection system / fences pendjng in Zones 1-6, and. design work for necurit.y :
alarm stations).
-10.1 Phase IV of long-term improvements
~ 12/93
- Approved, (f. ire annunciator rework for CAS/SAS, final security alarm; stations rework, and funding-
-)
administrative wrap-up). -
pending
. a.-
q-
'
- Indicates'a' change in status from the previous status report.
G9112171/SNLICFLR
.5 k
J
_._._. ~. - -. _ _.__
Statub Report _(16_
Attachmnnt to GNRO-92/00009
+
An'of jlocembe r_31u199 L i
V..
A C T I ON S_Til l S_Iti'liqlql NG PliR I OD :
Progremm thin reporting peritxl hun been r,ood, with activities procondfrig on scheduln. The actionn bnlow have begun or boen-completra since the i
last r. tat-us report was submitted (GNRO 91/00127 dated July 22, 1991):
i 1.
Phase 11 work on Zonen 7-13 has been completed.
A Pori f old+11 Intrusion Detection System (105) and new cameras have been installed.
This aquipment has boon tested by both the Security 8ection and tho vendor with lepro;.sive result 1.
This system is located in the outer laolation zone and cannot be tied tdo the security computer until Phases !!I and-1V arn compinte.
2.
The Phann li design work for long-t arin improtementa of Zonen 1-6 in bning reviewod for countructlen.
Field work J-cu rr a
'y scheduled to hogit; Juno.1992 for _ improvemont e in Zones 1 o as +.. of the Phann Ill attivit.les.-
3.
Development of custom softwaro for new equipment han begun and la proeneding to support installat inn of the equipment.
Phnsics 1 and 11 activittns are complete, and this work will continue into Phasnn 111 and-IV.-
t,
- 4.. Thn projact procurement work for Phanos l'and 11 is completo.
Tho i
final rolcasn'of funding and equipment delivery is in progroan to support Phase til and IV activities.
l l
t I
g 1
l I-lr a
09112171/SNb1CF1H 6
-n