ML20087E369
| ML20087E369 | |
| Person / Time | |
|---|---|
| Site: | MIT Nuclear Research Reactor |
| Issue date: | 01/13/1992 |
| From: | Bernard J, Kwok K MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9201210183 | |
| Download: ML20087E369 (1) | |
Text
,
-.. _. -. + -.
NUCLEAR REACTOR LABORATORY.
ik gA AN INTERDEPARTMENTAL CENTER OF 9)pg/
MASSACHUSETTS INSTITUTE OF TECHNOLOGY a __ _._
_._ _ _m
-- _ y -
- - - ~ -
O. K. HARLING 138 Albany Strr-at, Cambrdge, Mass. 02139 4296 A A. BERNARD, JR.
Director Tetofax No (617)253 7300 Dvector of Reactor Operations Telex No. 921473-MIT CAM -
Tel. No. (617)253-4202 January 13,1992 U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- ATEN
- Document Contml Desk
Subject:
Changcout of Heavy Water Reflector, Facility Operating License No. R-37, Docket No. 50-20 Gentlemen:
The Massachusetts Institute of Technology hereby reports, as an item of informa-tion, that it has successfully performed a complete changeout of the D 0 in its heavy water 2
reflector. This work was donc during a planned maintenance outage that was held in December 1991 - January 1992. All work was conducted in accordance with written procedures that were approved by the MIT Reactor Safeguards Committee.
The Massachusetts Institute of Technology also wishes. to thank the U.S.
Department of Energy for its enormous nsistance in this matter.
Sincerely,.
k Kwan S. Kwok, Ph.D.
Superintendent-MIT Research Reactor A ( A
/ John A. Bernard, Ph Directorof Reactor Operations MIT Research Reactor JAB:CRH cc::
O. Harling, MIT l.
R. Stephens, DOE L
- K. Brown, DOE L
USNRC _ Region I-Chief,
- Reactor Projects Section No. 3A
- USNRC - Region I-Project Engineer, Reactor Projects Section No. 3A USNRC-Project Manager, 8gO Standantization and Non-Power Project Directorate USNRC - Region I-Chief, I/
Effluents Radiation Protecon Branch
[O 9201210103 920113 PDR-ADOCK 05000020
- P-PDR
.