ML20087D979
| ML20087D979 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/07/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-I-MOSB-84, NUDOCS 9508110254 | |
| Download: ML20087D979 (1) | |
Text
-
7-MASAA -fh v
t DOCKETED-1 Imr.Exa.se-0 USNRC 2'
TAPE 24 SIDE B 3:
Date 3-30-90 4
Excerpt A.
% J1.14 A9 :40 1
5 61 Conversation between Mosbaugh, Burr, Chenault in-7-
Engineering Office on Second Floor of Service alW
,GE SECRETARY.
M'I't i
& ERYlCE-8 Plant Vogtle Site 9
. 10 11 (Stokes is'in room having separate phone conversation 12
-- Stoke's side conversation is deleted from text) 13 14 BURR:
There's'still some leaks 15 MOSBAUGH:
Was that in the tubing that was l
16 disassembled?
17 (Inaudible conversation.)
18 MOSBAUGH:
Right.
19 CHENAULT:
It was in the line, in the trip line where 20 the leaks was.
21 t
f f
f NUCLEA fo. yy. e u.R REGULATORYCOMMISSION
.s Docket No" /W-04#-$0gf'.ialExh. No#- M8 in the matter ofi 24L. 'Wr#h Staff
' DENTIRED. /
I Apphcant-RECEIVED _ 1/
Intervenor-f/
_ REJECTED Conto Off7 Contractor DATE O'hM_
I-M
_ YIllneS$ jfh//5
[
a NU i
( nc(M 6 ) l e stn& sit wunwa 7s t e s. noosuoms t. a t us24D-Ikd. 84 1
W l*
O i
Q j/I I"