Provides Addl Info to Suppl 950323 Request for Temporary Relief from ASME B&PV Code Section XI Requirement IAW-5250. Rev 0 to Calculation CA00027, Unit 1 Saltwater 1 Inch Half Coupling Weld Failure Encl
ML20087D412
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/08/1995
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087D414 List:
References
NUDOCS 9508100321
Download: ML20087D412 (10)


Text

.

9

?

?

Rostar E. DuroN Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Marytand 20657 410 586-2200 Ext.4455 local 410 260-4455 Baltimore August 8,1995 l

l l

U. S. Nuclear Regulatory Commission j

Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 l

Supplemental Information; Request for Temporary Relief from ASME Boiler &

j E_rsssure Vessel Code Section XI Reauirement TAW-5250

REFERENCE:

Letter from Mr. R. E. Denton (BGE) to NRC Document Control Desk, dated March 23,1995, Request for Temporary Relief from ASME Boiler & Pressure Vessel Code Section XI Requirement IAW-5250 We are providing additional information to supplement our relief request (Reference). We have requested relief to delay the repair of a half-coupling located on the bottom of the common saltwater discharge header in the senice water pump room. As described in the referenced letter, repair of the half-coupling is impractical during plant operation. Therefore, we have proposed alternatives to the repair which would provide an acceptable level of quality and safety until the repair can be made. Those alternatives are described in the referenced letter.

The root cause of the leak will be determined when we remove the leaking half-coupling. Based on past experience, it appears that the leak may be due to corrosion at a point where the coal tar coating was insufficient. Therefore, there is no need for augmented inspections of other coupling locations.

We have not provided any leak mitigating measure, such as a clamp, based on the nature of the leak and the safety significance of the potential failure of the half-coupling. In addition, we have changed the schedule for ultrasonic examination from every six months to every three months.

110005 0[

9500100321 950808 PDR ADOCK 05000317 il

)

y.

i'.

7, M,.

Document Control Desk July 00,1993 Page 2 Attached are the calculations described in our previous letter and additional information needed to assist the Staffs review of the code relief request. Should you have further questions regarding this nutter, we will bc pleased to discuss them with you.

Very truly yours, k

f W

l

'l RED / PSF / dim

Attachment:

As Stated cc:

D. A. Brune, Esquire J E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R.1. McLean, DNR J. H. Walter, PSC i

i i

l

t i

1*

t*

ATTACIIMENT SUPPLEMENTAL INFORMATION; REQUEST FOR TEMPORARY RELIEF, DATED MARCH 23, 1995 Saltwater Pine diameter = 30" nominal wall thickness =.375 inches at ends of T (middle oft is thicker) material = carbon steel - ASTM A-234, grade WPB lining = neoprene rubber (coal tar at the coupling threads)

Half Countine assumed opening = 1.75"(for 1" half coupling)

I enknoe Calculntion methodology - Crane Technical Paper 410 system pressure = design pressure = 50 psi (operating pressure at this location = 20 psi) temperature = 95'F fresh water assumed (less dense than saltwater)

Stress Annivsis methodology - ANSI B31,I credit taken for.25" cover fillet weld (conservative since a groove weld is also present) i linreinforced Onenine Evaluntinn methodology - ANSI B31,I required minimum wall thickness = 0.17"(introduced a 2.0 undertainty correction factor for calculation of A7 to account for UT measurement inaccuracy) service life = 13 months Non-Destructive Ernminntion ultrasonic examination methods used minimum measured wall thickness = 0.523" UT report and map attached

o.

=

.s EN-1-100 Revision 3 Engineering Service Process Overview.

Page 76 of 131 - -

ATTACHMENT 1, ENGINEERING SERVICE PACKAGE (ESP)

(Page 1 of 2) t Rev. No.:

o Page i of 7 Supp No.:

ESP No.:

gg,99g,y,2 EfSR O NSR O AQ [B-4]

INITIATION (Control Doc Type: ESP)

WI.E @

ORIGINATOR / EXT /DATE:

.b e v. @SedL r N r w rw w at s o aaw runs IUNrr1 O UNIT 2 O CouMoN O ISFSI REQUESTED DUE DATE:

'7-28 95 MEcitNo/NUCLEIS EQIP. ID:

NUCLEIS PRIORrTY:

IP/MO No.: tR. sot &.w s SYs No.: ott i

REASONS FOR ENGINEERING SERVICES REQUEST / PROPOSED CilANGES:

Nvne paz.u,4,4_

CAL / t>LA;nO 7c.id sTiru W Tw otA OPM4c 0 c'W s d. swr &.t (k>trt/

uw aAa, nt4Avu aa*.

uae-a/O coc juo/

4 tJ # n+ c6nnaq O Check here if additional sheets are attached (mark these sheets vdth ESP No. and Supplement and Rev. No., as ap For Modifications Only I

.ngineering Review / Approval Service ation (Check One)

O MajorMod O Minor Mod O Approved O Disapproved D4 i

SYSTEM ENGINEER:

O Approved O Disapproved SUPERVISOR:

r-(RequiredforinitialES).n s unless RDO initiated)

O Approved O Disapproved S

PROJECT MANAGER:

~

(Requiredfor ESP modtfication supplements unless RDO s

)

COMMENTS:

Assignment j

PROJECT MANAGER:

3g c. (2:AssKf RF.SPONSIBLE GROUP; gbgo RtsPONstutE ENGINEER; DOM Y-SCREENS (Check all that apply)

O SArrTY EV AWATtoN SCREEN 1No (EN-1 102)

O SPECIALTYINPtrr SCREEN (DS-020)

O NUC1 EAR SAFLTY S10NIFICANCE SCREEN (NS.2 101)

O ENVIRONMENTALIMPACT SCREEN PACKAGE (Check all that are completed)

O Configurution Document Change Evaluation O

Like-for Like Evaluation O

Modification Evaluation Ed Engineering Evaluation O

SSC Functional Evaluation O

Equivalency Evaluation

EN-1-100 Engin6: ring Service Process Overview _

Revision 3 Page 77 of131 1

ATTACHMENT 1, ENGINEERING SERVICE PACKAGE (ESP)

(Page 2 of 2)

~

ESP No.:

csdqgm.3g t Supp No.:

Rev. No.:

o Page -t of 7 Package (Continued):

O LCIPS Analysis O

Analytical SoAware O

Like-for-LikeEquivalency Evaluation O

Billof Materials (BOM)

O Master Calibration Data Sheet (MCDS)

Calculation ckooo2n D

Modification / Design Input Requirements (DIR)

O Configuration Document Change Evaluation O

OperationalImpact ofModi6catiant O

Design Basis Document (DBD)

O Safety Evaluation (50.59)

O Design Instructions O

Safety Evaluation (72.48)

D Design Scope Document O.

Seismic Qualification Review Summary O

Electrical Device Setting Sheets O

Sonware Engineering O

Engineering Service Inventory Transmitta!

O Setpoint Change Transmittal Sheets O

Engineering Standard (ES)

O Specifications O

EnvironmentalImpact Statement O

Safety Parameters Display System (SPDS)

O EQ Evaluation Alarm Manual O

EQTAR Other:

O Issue Report (IR) Resolution Other:

Configuration Updates:

O Change Notification Records (CNR)

O Stock Descriptions O

Database Print Screen Mark-up D

Technical Information Turnover Sheet O

Drawing Change Mark-up D

Turn Around Document (TAD)

O Drawing Change Notice (DCN)

O License Amendment Change Request O

Request for Procedure Activity (RPA)

O DCN/ FAD Transmittal O

S AR Change Request Other:

Package Closure:

O Drawing Change Request (DCR)

O Record of Walkdown O

Modification Turnover Checklist Other:

ENGINEERING REVIEW / APPROVALS (Printed Name and Signature)

RESPONS!m.E ENGINEER:

S o u r.rtu.<oc. b@

Date:

'"J t s -4 r N

INDEPENDENT REVIEWER: Th T. <*mut tr Date:

r/w/9(

APPROVAL:

te AJa t'.

MLu Date:

N2sdY t

IMPLEMENTATION REVIEW / APPROVALS POSRC MEETINO No.:

N/A Date:

POSRC CilAIRhtAN:

PLANT GENERAL MANAGER:

O Approved O Disapproved FINAL APPROVAL OF CIIANGES AND TESTS RESULTS Date:

POSRC MEETING No.:

POSRC CitAIRifAN:

PLANT GrNERAL MANAGER:

O Approved O Disapproved I

i I

.,1 1

ENGINEERING EVALUATION (Attachment 24) 1 ESP No.:

ES199501352 Supp No.:

XXX Rev. No.:

0000 Page 3 of 7 REASONS FOR ENGINEERINc EVALUATION: PROVIDE TECl!NICAL JUSUFICATION FOR CONITNUED OPERATION OF TIIE UNIT 1 SALTWATER SYSTEM FOLIDWING TIIE DISCOVERY OF A TIIROUOlt WALL LEAK ON A 1" IIALF-COUPLINO IN TIIE SERVICEWATER ROOM. REFERENCE BGB CALCULATION CA00027 DESCR! MON OF Cl!ANCE(S): TIIIS EVALUATION PROVIDES TIIE DISPOSTI10N FOR ISSUE REPORT IR5028461 DETAILED EVALUATION OF CilANGE(S): CALCULABON CA00027 WAS PERFORMED TO DETERMINE DIE MAXIMUM l

FIDW BIROUOlt TlIE S ALTWATER SYSTEM IN TlIE EVENT TIIE LEAKING llALF-COUPUNO CATASTROPIIICALLY FAILED, AN OPENING EQUALTO Tile O.D. OF TIIE 1" IIALF-COUPUNO WAS ASSUMED TO BE 1.75" Wirit A MAXIMUM SALTWATER DESIGN PRESSURE AT TIIIS LOCATION OF 20 PSL SINCE Tile IIALF COUPUNO IS IDCATED ON Tile BOTTOM OF TIIE COMMON DISCI (ARGE PIPE IN Tile UNIT 1 SERVICE WATER ROOM TlIERE IS NO EFFECTIVE IDSS OF COOUNO WATER CAPACI1Y AS ARESULTOFTIIE LEAK. Tile SERVICE WATER ROOM IIAS BEEN ANALYZED FOR A FLOODING RATE OF 447 OPM BY TIIE FIDODING DESIGN OUIDEUNES MANUAL, DS-001. ANY FIDODING RATE LESS TIIAN 447 OPM IN Tile SERVICE WATER ROOM DOES NOT Cl!ALLENOE ANY OF TIIE SAFETY RELATED EQUIPMENT IN l

111E ROOM SUCII Til AT TIIE EQUIPMENT COULD DE PREVENTED FROM PERFORMING ITS S AFETY RELATED FUNCTION.

i SINCE Tile CALCULATED SALTWATER BLOWDOWN RATE IS SIGNIFICANTLY LEC TilAN 447 OPM, NO OPERABIIITY CONCERNS EXIST DUE TO POTENTIAL FLOODINO. AN UNREINFORCED OPENWO E VALUATION WAS PERFORMED AS PART OF CA00027, ASSUMING TIIE llALF-COUPUNO WAS COMPLETELY REMOVED. Tile METilODOLOGY DESCRIBED IN ANSIB31.1 WAS USED. TIIE RESULT OF Ti!IS EVALUATION DEMONSTRATED TIIAT SUFFICIENT REINFORCEMENT l

IS PROVIDED BY Tile EXCESS MATERIAL IN TIIE IIEADER Wall BASED ON TIIE MINIMUM READINO OF.523" DIE CALCULATED NUMBER OF MONTIIS UNTIL DIE UNREINFORCED OPENINO NO IDNGER MEETS Tile CODE l

REQUIREMENTS IS 13 MONrlIS. BASED ON Tile RECOMMENDATION CONTAINED IN NRC GENERIC LETTER 90-05 AN INSPECTION INTERVAL OF 3 MONrilS IS RECOMMENDED BY PDSU. FINALLY, Tite SEISMIC LOADS IN TIIE FIAWED WELD WERE EVALUATED. CREDIT WAS ONLY TAKEN FOR TI'E.25" COVER FILLET ON Ti!E IIALF-COUPUNO, TIUS IS EKrREMELY CONSERVATIVE SINCE A OROOVE WELD IS ALSO PRESENT. IT WAS DETERMINED TIIAT Ti!E WELD WAS LOADED TO LESS Til AN 5% OF TIIE ALIDWABLE. ALTi!OUGII Tile FLAW IN TIIE IIAIS COUPLINO CANNOT BE CllARACTERIZED, TilIS PROVIDES A LEVEL OF ASSURANCE TilAT CATASTROPillC WELD /f tALF-COUPUG FAILURE IS i

lilOllLY UNUKELY. IN

SUMMARY

PDSU CONSIDERS Ti!E SALTWATER llEADER TO DE OPERABLE. PURSUIT OF FORMAL SECTION XI CODE REUEF WITil Ti!E NRC IS IN PROGRESS, Ti(EREFORE, IN Tite INTERIM DECIARING Tite IIEADER INOPERAllII,IS NOT REQUIRED.

EN.I.100 Rev 3 ENOREVAL

p

!.t ',*

~

~..

\\

1 EN-1-100 Engineering Services Process Overview -

Revision 3 i

Page 91 of131 ATTACHMENT 6, ENGINEERING SERVICE INVENTORY TRANSMITTAL (Page 1 of 4)

Rev. No.:

o Page 'I of 1 ESP No.:

s5 #995 o/3St.

Supp No.:

Engineering Change Evaluation (Check type of evaluation below)

O Like-for-Like Evaluation D

Modification Evaluation I

Engineering Evaluation O

Configuration Document Change Evaluation O

Equivalency Evaluation O

SSC Functional Evaluation RevvNo. J Evaluation No.

Rev. No.

Evaluation No.

ES6950iKTZ.

W Database Changes O

ETDB Screen Print Mark-ups O

TADS Applicable Unique Equipinent identifiers (UEls) '

Applicable Unique EquipinentIdentifiers (UEls)

A e

O Vendor TechnicalInformation Changes Vendor Tech Afanual TitlevNo.

Rev. No.

NlA

~

o

EN-1-100 Revision 3 Engineering Services Process Overview-s, Page 92 of131 --

ATTACIIMENT 6, ENGINEERING SERVICE INVENTORY TRANSMITTAL (Page 2 of 4)

E' 1995cvasz.

Supp No.:

Rev. No.:

0 88'A' ESP No.:

s O

Stock Description Changes Mech. No.

Mech. No.

Mech. No.

MeJr. No.

i Specification Changes O

Design Specifications O

Procurement Specifications

Rev. No.

Specification No.

Rev. No.

Specipcation No.

plr Electrieal Ibevice Setting Changes O

Protective Relay Setting Sheets (PRSS)

O Relay Setting Sheet (RSS)

O Electrical Metering Calibration Data Sheet O

Motor Control Center Protective Device Setting (EMCDS)

Sheet (MCCPDS) l O

Transformer TAP / Voltage Regulator Setting Sheet (TTVRSS)

Affected Devices No.

Rev.No.

Affected Devices No.

Rev.No.

Nlh 1

.~

..: l*

EN-1-100

~

Revision 3 Engineering Services Process Overview Page 93 of131 ATTACHMENT 6, ENGINEERING SERVICE INVENTORY TRANSMITTAL (Page 3 of 4)

Rev. No.:

o Page 6 of 7 ESP No.:

g3,qq s.g, y, y _e.

Supp No.:

O Seismic Qualification Review Summary Changes SQRSNo.

Rev. No.

SQRSNo.

Rev. No.

  1. k ll Environmental Qualification (EQ)

O EQ Evaluations O

EQ Technical Assessment Report (EQTAR)

EQTAR/EQ File No.

Rev. No.

EQTAR/EQ File No.

Rev. No.

tilh f

W Calculations Calculation No.

Rev. No.

Calculation No.

Rev. No.

CA oooz.l o

O Master Calibration Data Sheets (MCDSs) Changes

~

MCDS No.

Rev. No.

MCDS No.

Rev. No.

  1. lA 4

i I

EN-1-100 Engineering Services Process Overview.

. Revision 3 Page 94 of131 ATTACliMENT 6, ENGINEERING SERVICE INVENTORY TRANSMITTAL (Page 4 of 4) i ESP Nr,:

esjg,jmm Supp No.:

Rev. No.:

o Page 9 of 9 O

Setpoire. Change Transmittal Sheets (SCTSs) Changes SC75N1 Rev. No.

SCTSNo.

Rev. No.

I ep 4

Safety Evaluation 0

50.59 Safety Evaluation O

72.48 Safety Evaluation Saferv Evaluation No.

Rev. No.

Safety Evaluation No.

. Rev. No.

4 i

IP 1

a Software O

Software Requirements Specificatir,t (SRS)

O Hazards Analysis (HAZ)

O Software Design Description (SDD)

O Software V&V Report (SVVR)

O Software Quality Assurance Plan (SQAP)

O Software Test Report (SWTR)

O Software Program Component (SPC)

Docwnent ID.

Rev. No.

Document 1D.

Rev. No.

A l

lP Drawings 1

, Drawing No.

Rev. No.

Drawing No.

Rev. No.

M

'P DCNs DCN No.

Rev. No.

DCN No.

Rev. No.

Mk e

e

_y r

,.m..

..r,

,