STONE & WEBSTER MICHIGAN, INC. / PRINCIPAL STAFF MA* he. DPRP P.O. Box M325. BOSTON. M ASSACHUSETTS O2107 1/g DE i, ca hin Di<4 S P

-s iC DRNA /

0D' Y P!') SCS V g{[

59 - 330 F^ a +3

NF File l)oq Mr. J. J. Harrison March 6, 1984 Nuclear Regulatory Commission -

799 Roosevelt Road Glen Ellyn, IL 60137 .

Subject:

DOCKET N0. 50-329/330 MIDLAND NUCLEAR POWER PLANT RESUMES AND AFFFIDAVITS FOR CIO STAFF MEMBERS SERIAL NO. SWM-045 Attached is the signed affidavit and resume for Mr. R. E. Horine, who has been assigned to the CIO staff at the Midland Nuclear Power Plant.

.. arr CIO Program Manager Enclosures JJR/ka cc: CIO General Files S

MAR 840313038e e40306 O 00d PDR ADOCK 05000329 A PDR j Sbl ili

Fioure 3-1.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COWANY 50-330 OM (Midland Plant, Units 1 and 2) Docket No. 50-329 OL 50-330 OL

, AFFIDAVIT OF Ronald E. Horine My necne is Ronald E. Horine . I am employed by Stone & Webster Michigan, Inc. as Quality Assurance Engineer ,

I am currently assigned to the team which is proposed to conduct a Thir d Party Construction Implementation Overview at the Midland Nuclear Plant site.

Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company or Bechtel relating to issues that I will be re-viewing. I have never been employed by Consumers Power Company or Bechtel.

I do' not own any shares of Consumers Power Company or Bechtel stock. Mutual funds or other funds in which I may have a beneficial interest, but over which I have no control, may own shares of Consumers Power Company or Becntel stock,

,of which I so unaware. A list of such funds in which I have an interest ar2 attached. I have no relatives which are or have been employed by Consumers Power Company or Bechtel.

F

)

Signed giu V. [ dhtm

/ \ l Sworn and Subscribed Before Me This/ Day of /77ef> r

/f RWs 4 2/ // U NOTARY PUBLIC # &

UAinicf A A. Piidd Mctory Public, Bay County, Mi

..:,!y cornmission Expires Mr.4,134 My, Commission Expires 3'V'8b

(

, 1

.e----.- g y * - ew--

2,

  • _P .

March 1984 HORINE, RONALD E.- QUALITY ASSURANCE ENGINEER EDUCATION New Washingtun High School, New Washington Indiana - Diploma 1972 EXPERIENCE

SUMMARY

Mr. Horine_has 9 years experience actively working within ASME approved Quality Assurance programs supportive of ASME Section III & VIII construction activities.

Currently employed by Stone & Webster Engineering Corp.(SWEC) since C3-01-1984 as a Quality Assurance Engineer and assigned to the Midland Nuclear Project con-struction overview group. His responsibilities include but oct necessarily limited to third party verification of construction contractor QA program imple-mentation.

. Prior to employment with (SWEC) Mr. Horine's QA experience is supported by hands on inspection functions combined with both supervision and management of such thereof. During the time frame of 1378 through 1984 Mr. Horine was employed by

'Cherne Contracting Corporation (Mechanical Contractor with Marble Hill Units 1 & 2) and successfully excuted the position of QC Inspector to the position of Quality Engineering Manager. During the time frame of 1974 through 1978 Mr. Horine was employed by Ryan Industries (ASME Section III & VIII Fabricator) and successfully excuted the positions of QC Inspector and QC Inspection Foreman.

PROFESSIONAL AFFILIATIONS None PUBLICATIONS

-None

e DETAILED EXPERIENCE RECORD HORINE, RONALD E. 42577

= STONE & WEBSTER ENGINEERING CORPORATION, BOSTON, MA (March 1984 to Present)

Appointments:

Quality Assurance Engineer - March 1984 Midland Nuclear Project, Consumer Power Company (March 1984 to Present)

As QUALITY ASSURANCE ENGINEER (March 1984 to Present), assigned to verify the correct implementation of site work procedures by both the client and contractors QA departments including integral project management stivities.

CHERNE CONTRACTING CORPORATION, NEW WASHINGTON, IN (Oct 1978 to March 1984)

Appointments:

QE Manager Level III - May 1983

' Interim QE Manager Level III - March 1983 QC Supervisor Level III - Aug 1982 QC Engineer Level III - March 1982 QC Supervisor Level II - May 1979

_QC Inspector Level II - Oct 1978 Marble Hill Project, Public Service of Indiana (Oct 1978 to. March 1984)

As QUALITY ENGINEER MANAGER (March 1983 to March 1984) including interim position, responsible for.the approval of QC instructions and procedures:

review of project procedures: review and closecut of NCR's and CAR's, including identification of trends adverse to quality; review of QA records for technical adequacy; and maintenance of quality records. Specific respon-sibilities included but were not necessarily limited to:

A) Training, certification, and supervision of all QE and QA records personnel

5) Vendor surveillance and trending activities

~ C) Assembling, review and turnover of all QA records D) Preparation of appropriate code data ieports (ie NF-1, NPP-1, N-5)

E) Review and approval of all traveller documentation As QUALITY CONTROL SUPERVISOR (Aug 1982 to March 1983) responsible for super-vision of all QC inspectors assigneo to safety related construction activities within the Auxiliary Building and Units 1 & 2 containments. This respon-sibility included hiring and scheduling of work activities associated with inspection of large and small bore welding, hanger and equipment installation.

As QUALITY CONTROL ENGINEER (March 1982 to Aug 1982) responsible for development of all QC instructions relative to receipt inspection, calibration, material control, storage and maintenance. This position also included the responsi-bility to review all QA records associated with the above with necessary inter-face with the ANI for obtaining review and approval thereof.

,w _, , , , -

- ----..7

As QUALITY CONTROL SUPERVISOR (May 1979 to May 1982) responsible for develop-ment and implementation of work instructions supportive of program surveillance,

-CMTR/ data package review, calibration, material control and storage. This posi-tion also included supervision of all QC inspectors working in receipt inspec-tion, storage and maintenance and calibration. Certified per SNT-TC-1A criteria as Level II Mr and Level III PT.

As QUALITY CONTROL INSPECTOR (Oct 1978 to May 1979) responsible to start an active QC inspection program supportive of receipt inspection, program surveillance, calibration and to assist as Level II MT and PT as needed.

RYAN INDUSTRIES, LOUISVILLE, KY (Sep 1974 to Oct 1978)

Appointments: -

QC Foreman - May 1978 QC Inspector -~Sep 1974 As QUALITY CONTROL INSPECTION FOREMAN (May 1978 to Oct 1978) responsibilities

, included performance'of MT and PT NDE activities along with in-process construc-tion inspection. Such activities involved, UT thickness inspection, pneumatic, nydrostatic and helium leak test, welding inspection and final assembly of both ASME Section III'and VIII items. Also supervised liquidation / sale of all plant materials and consumables commensurate with plant close-out activities.

As QUALITY CONTROL INSPECTOR (Sep 1974 to May 1978) responsibilities included MT, PT and UT thickness gauging activities, receipt inspection, hydro, helium and pneumation leak testing, instrumentation pneumatic / electrical inspecticn, and welding inspection. Started a research and development inspection process relative to field location of liquified natural gas vaporuers, this process involved field installation trouble shooting and summarizing such in a fashion useful for shop implementation of preventive measures to limit field installation problems.

CHICAGO BRIDGE AND IRON COMPANY, CLAREMORE OK (March 1974 to Sep 1974)

Appointments:

Radiographic Trainee - March 1974 As RADIOGRAPHIC TRAINEE (March 1974 to Sep 1974) responsibility included assistance in the performance of radiographic operations pertaining to the

. construction of.a 220,000 gallon liquified natural gas storage vessel.

STONE G WEBSTER EN lNEERING CORPORATION G A EMPLOYZCT EXPET.lENCE AND EDUCATION RESUZE T-Ese  !"wse rrw on eninrininx)

NAME SOCIAL SECURITY NUMBER Horine Ronald E. 316-64-8103 LAST FIRST M100LE EXPERIENCE AT ST088E & WESSTER (4/sTa4L pos/r/OrsNELof TITLE Jos DESCRIPTsoN /orra/L w staroestof ,g ,_ y Quality Assurance Engineer *

(Hired 3-01-1984) 3 84 Previous EXPERIENCE (tisrnostnicenrinrtornentrinsr/* *(Present)

FROM TO CO M PAN Y TITLE JOS DESCRIPTION (otra/L wo#rMaraeIFEo/

Cherne QE Manager See resume attached 10 78 3 84 Contracting Corporation Ryan Industries QC Foreman See resume attached 9 74 10 78 Chicago Bridge Radiographic See resume attached 3 74 9 74 and Iron Trainee

  • stranare nesuur ma r or a rracuto rr ornas att neourno invarmarron

~

F '~ E Ronald E. Horine soCi A L sECu,TY m. 316-64-8103 0 A CERTIFICATloN (Listc. sf REctNrCExTirlCanoNs FIRst) s TYPE or CERT LEVEL OffEsT C o DE, SPEC. SoVERNING DATE DOC WENTSt ENT g,,,,,,

(frclVEN/ DOCUM ENTATION A S ENCY RECEIVED Ch;rne ANSI III&II X ANSI --

X Contracting N45.2.6 N45.2.9 Corporation ASME Sec-tion III 1977 edi-tion Winter 77 Addenda Mil Std 105D NDE "MT" II X SNT-TC-1A --

1-23-79 X NDE "PT" III ' X SNT-TC-1A --

5-21-79 X Ryan Industries NDE PT II X SNT-TC-1A --

11-27-74 X UT Thick- N/A X QCP-T-209 --

3-1975 X ness N 2rE: INCLuCE C0rits or ALL CERnnCAnoM 00CuufNrs, CERnnCArts, CA R0s, ErC EDUC ATION s SCM00LS, COLLEGES, TRAINING COURSES,(QA)ETC.

(LIST GENERAL EDUCATION F1RST)

NAM E OF SCHOOL AND LOCATION DEGREE GRANTED AND MAJOR, DATE NO.OF Con FLETED HOURS GRADE fif clVEN SYEMPLOYERsPECIFY COMNNYMANE) OR TITLE OF COURSE New Washington High School Diploma 1972 -- --

New Washington Indiana Ryan Industries (Course Title) Welding Inspectior 4-1976 20 N/A Quality Assurance Ryan Industries (Course Title) Code Welding from 3-1977 20 N/A Inquiry to Shipment Ryan Industries (Course Title) Tube Fabrication 11-1975 8 N/A Cherne Contracting Corporation (Course Title) Radiation Safety 11-1979 8 N/A Cherne Contracting Corporation (Course Title) Instrumentation 1979 40 N/A Design / Installation Cherne Contracting Corporation (Course Title) Quality Circle 1983 40 N/A Leader Training C TE: FOR SPECiflC QA TRAINING COURSES, INCLUDE COPIES OF ALL con /RSE OUTLINES, CERTIFICATES, CIPLOMA S, ETC.,1F clVEN.

mA ;E Ronald F Mnr4.g Sicit.L SEC:n:Tv es. 316-64-8103 LIST E!UIEMENT 'VHICH You H AVE OPERATED CADioeRAPulc ULTRASONIC M A S. PARTICLE LIQUID PENETRANT EDDfCUARENT ( lit.T E ETC.)

(1) Iridum 192 (1) Nova 201 (1) Y-6 Yoke (1) Black Light N/A Master Gauges, source Calipers, Height Gauges, (2) Nortec-100 (2) P-9). Psychrometer Hygrometer AMP /

(3) MagnaFlux Volt Gauges, Field Indicator Thread Gauges, Torque Wrench Calibrators, Millivolt Source ENGINEERING REGISTRATION ST*TES AND LICENSE NUMSERS EIT EX AMIN ATIONS DISCI PLI N E N/A MEMBERSHIP IN PRoFESSloNAL SOCIETIES N/A PUBLICATIONS N/A

. ' ' ' ~ ~ ~

.. socesi. secu iry es.316-64-8103 ons Ronald E. Horin7 RESARKS:

l m ,n v=. . ... .........,... . ,i. ... . ..., ,,,,,

a . ,s.

. i i.e ..

.... i..

~ ,,f,,,, q ,

$ a,1 (~~h j o3-c4 -\984 V

~

/

. _ _