Interim Significant Deficiency Rept 84-02 Re Poor Wiring Workmanship on Two Gould 480-volt Motor Control Ctrs.Random Insps Conducted.Evaluation Underway.Next Rept Will Be Submitted by 850701
ML20087D363
Person / Time
Site: Beaver Valley
Issue date: 02/21/1984
From: Woolever E
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-4-014, 2NRC-4-14, 84-02, 84-2, NUDOCS 8403130374
Download: ML20087D363 (3)


Text

.

2NRC-4-014 (412) 767 - 6141 Telecopy 6

Nuclear Construction DMslon February 21, 1984 Robinson Plaza, Building 2, Suite 210 Pittaburgh, PA 1$205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 1

ATTENTION:

Dr. Thomas E. Murley Administrato r

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Gould 480 V Motor Control Centers Significant Deficiency Report No. 84-02, Int erim Report Gentlemen:

This Interim Report is in reference tc the pot ent ially report ab le Significant Deficiency relating to the wiring workmanship on two Gould 480 V Motor Control Centers. An evaluation is currently underway to deter-mine the report abili ty and impact of this problem fo r BV-2.

Purs uant to the requirement s of 10CFR50. 5 5(e), it is ant ic ipa ted chat a subs eqtent report on this matter will be submitted to Region I by July 1,1985.

DUQUESNE LIGHT COMPANY By 5/ J. Woolever Vice President JS/wjs At t achment cc:

Mr. R. DeYoung, Director Of fice of Inspection and Enforcement (3) (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

Ms. L. Lazo, NRC Project Manager (w/ attachment)

NRC Document Control Desk (w/ attachment)

INPO Records Center (w/ attachment)

St1BSCRIBED AND SWORN TO B'dFORE ME THIS h d DAY OF kduaw e 1900*

  • b _ bYLLu!)

Not ary Pubite MMA ELAINE n ITER, t'OTARY PUGUC RCDINSON TOWNSHIP, ALLEGHENY COUTEl' f/,Y CO.YMISS10N EXP!RElQCMSER:20,,ISYv

[

{h 8403130374 840221 FDR ADOCK 05000412 s

PDR

s i

United States Nuclear Regulatory Conunission Dr. Thomas E. Murley i

page 2 4

COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLECHENY

)

_ _, _ /f/

, before me, On this g/d day of wf a Notary Public in :tol for said Co[monwealth and County, pe rsonally anpeared E. J. Woolever, who being duly sworn, deposed and said that (1) he j

is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and - (3) the l

s t at ement s set forth in the Submittal are true and co-ect to the best of his knowledge.

U Not ary Public ~

ANITA ELA!NE REITER, NOTARY PUBUC i

ROGINSON TOWNSHIP, ALLECHENY COUTP MY C0fM,ilSSION EXPIRES OCTOBER 20,1930 i

.l 5

l~

1

'I I.

j c

l l

~

BEAVER VALLEY POWER STATION - UNIT NO: 2 DUQUESNE LICHT COMPANY Report on Potential Significant Deficiency No. 84-02 480V Motor Control Centers 1.

SUMMARY

The BVPS-2 Site Quality Control (SQC) group has repo rt ed ins t ances of what appear to be poor workmanship practices found in factory ins talled wiring in the Class 1E 4160V switchgear and 480V unit subs t at io ns furnished by Brown Boveri ( B B) and the 480V n.ator control center (MCC) furnished by Gould.

This equipment was supplied under purchase orders 2BV-304, 2BV-307, and 2BV-310, res pe ct ively.

The ins t ances have be en r ec orded in several Nonconformance and Disposition Report s and ot he r limited cursory inspect ions that have been prepared by SQC.

2.

IMMEDIATE ACTION TAKEN Site ins pe ct ions of the 4160V switchgear, the 480V unit subs t at ions,

and the 480V MCC's were condeted on a random basis by the SWEC equip-me nt s peci ali s t and a BB represent ative.

These ins pe ct ions confirmed that the equipment did exhibit ins tances of poor workmanship pract ices and also confirmed the need for further analysis.

3.

DESCRIPTION OF THE PROBLEMS Specific ins tances reported include:

1.

Couged, cut, or chafed insulation on switchboard wire.

2.

Conductor strands not captured in terminal lug barrel.

3.

Broken or nicked conductoe s trand s in switchboard wire.

4.

Taunt powe r cable connect ions from the powe r s t ab s to the line terminals of the breakers ins talled in the MCC's.

4.

ANALYSIS OF SAFETY IMPLICATIONS The observed conditions, without further analysis, have been judged to have a potential to cause an electrical failure of the equipment during a seismic event.

Because the problems noted above were observed on redundant switchge ar,

unit subs t at ion, and MCC's, and because this eq uipment provides powe r for the majority of the plant's safety related systems, the problems described above could result in the loss of plant capability to safely shut down.

5.

CORRECTIVE ACTION TO REMEDY DEFICIENCY Ins pect ions will be pe rformed and any deficiencies noc ed during the inspections will be analyzed and, if necessary, repaired to assure that the functional integrity of the equipment is maint ained.

6.

ADDITIONAL REPORTS An additional report will be issued by July 1,1985.

-