s w on. %. moo _- - '
3.
gg2 eseammmmee r
w_v_
. a amem DOCKETED i
' Georgia Pbwer 75 Jll 14 NO:22 0FFICE OF SECRETARY DOCKETING & SERVICE BRANCH Calcon Temoerature Switch Response Test on 4/4/90-This testing provided information concerning the response of a~ Calcon temperature switch to different heat up rates.
All data ises taken with the. switch in an oil bath. The temperature was varied at rates of 1*F/ min..
2*F/ min.. 3*F/ min.
and 4*F/ min.
The attached chart shows the response of the switch.-
i The second test was performed by stabilizing the switch in an. oil bath at 160'F.
The switch was then placed into an oil bath at 200*F.
The response-of the switch to trip, given the 40*F step change, was 3 minutes and 54 seconds.
O M
NUCLEAR REGULATORY COMMISSION fo -4 L4~C CM.3 Docket No. 5 6 5 - 0 g g,y, yo_ f3,-g ga inthe nutterolJL, i
}
Staff IDENTIFIED Appleant /-
RECEIVED
/
intemnor
_ REJECTED Contg ott r.
Contractor DATE d///F.1 Ohr Whess /s-6-o.<&f)
Reporter 6 ) G (J O
92 PROJECT 9508100287 950601 006222 PDR ADOCK 05000424 O
PDR a
O Ce C
CALCE\\
TENPIRATLRE SWIT:1-RATE OF INCREASE VS TRIP POINT
/
mi..
j c'
/
L-
./
L Jg toe 8 ios.4 ios.e ios.a im p
186
/
180 g
/.
/l
//
-l..
h I:1 2:I 3:1 4:1 34 OEGREES : MINUTES 4
de/ine cit
- 6. G 6 C16 C
~
cn al9ho
.