Applicant Exhibit A-80,consisting of Calcon Temp Switch Response Test on 900404
ML20087D339
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/01/1995
From:
GEORGIA POWER CO.
To:
References
OLA-3-A-080, OLA-3-A-80, NUDOCS 9508100287
Download: ML20087D339 (2)


Text

--..,

s w on. %. moo _- - '

3.

gg2 eseammmmee r

w_v_

. a amem DOCKETED i

USNRC

' Georgia Pbwer 75 Jll 14 NO:22 0FFICE OF SECRETARY DOCKETING & SERVICE BRANCH Calcon Temoerature Switch Response Test on 4/4/90-This testing provided information concerning the response of a~ Calcon temperature switch to different heat up rates.

All data ises taken with the. switch in an oil bath. The temperature was varied at rates of 1*F/ min..

2*F/ min.. 3*F/ min.

and 4*F/ min.

The attached chart shows the response of the switch.-

i The second test was performed by stabilizing the switch in an. oil bath at 160'F.

The switch was then placed into an oil bath at 200*F.

The response-of the switch to trip, given the 40*F step change, was 3 minutes and 54 seconds.

O M

NUCLEAR REGULATORY COMMISSION fo -4 L4~C CM.3 Docket No. 5 6 5 - 0 g g,y, yo_ f3,-g ga inthe nutterolJL, i

}

Staff IDENTIFIED Appleant /-

RECEIVED

/

intemnor

_ REJECTED Contg ott r.

Contractor DATE d///F.1 Ohr Whess /s-6-o.<&f)

Reporter 6 ) G (J O

92 PROJECT 9508100287 950601 006222 PDR ADOCK 05000424 O

PDR a

O Ce C

CALCE\\

TENPIRATLRE SWIT:1-RATE OF INCREASE VS TRIP POINT

/

mi..

j c'

/

L-

./

L Jg toe 8 ios.4 ios.e ios.a im p

186

/

180 g

/.

/l

//

-l..

h I:1 2:I 3:1 4:1 34 OEGREES : MINUTES 4

de/ine cit

6. G 6 C16 C

~