Applicant Exhibit A-80,consisting of Calcon Temp Switch Response Test on 900404
ML20087D339
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/01/1995
From:
GEORGIA POWER CO.
To:
References
OLA-3-A-080, OLA-3-A-80, NUDOCS 9508100287
Download: ML20087D339 (2)


Text

- -

3. , .

gg2 s w on. %. moo _- - ' eseammmmee r w_v_ . a amem DOCKETED  !

i USNRC

' Georgia Pbwer ,

75 Jll 14 NO:22 0FFICE OF SECRETARY DOCKETING & SERVICE BRANCH Calcon Temoerature Switch Response Test on 4/4/90- '

This testing provided information concerning the response of a~ Calcon temperature switch to different heat up rates. All data ises taken with the. switch in an oil bath. The temperature was varied at rates of 1*F/ min..

2*F/ min.. 3*F/ min. and 4*F/ min. The attached chart shows the response  ;

of the switch.- -

i The second test was performed by stabilizing the switch in an . oil bath at 160'F. The switch was then placed into an oil bath at 200*F. The response- of the switch to trip, given the 40*F step change, was 3 minutes and 54 seconds.

O M

NUCLEAR REGULATORY COMMISSION fo -4 L4~C CM.3 .

Docket No. 5 6 5 - 0 g g,y, yo_ f3,-g ga inthe nutterolJL , i }

Staff ' '

IDENTIFIED Appleant /-

RECEIVED / '

intemnor -

_ REJECTED Contg ott r. .

Contractor Ohr DATE d///F.1  !

Reporter 6 ) G (J Whess /s-6-o.<&f)

O

- 92 PROJECT 9508100287 950601 006222 PDR ADOCK 05000424 O PDR ,

l a

O Ce C '

CALCE\ TENPIRATLRE SWIT:1- -

RATE OF INCREASE VS TRIP POINT

/

mi . . .

j c' / L- ./

Jg L

toe 8 - -

p im ios.4 ios.e ios.a 186

/

180 g /. /l-

// -l..

h 34 I:1 2:I 3:1 4:1 4

OEGREES : MINUTES de/ine cit 6. G 6 C16 C __ _ _

~

cn al9ho